Council planning record

Splitting the existing dwelling into two residential dwellings and internal alterations, the conversion and extension of an existing barn to a residential dwelling, demolition of an existing row of garages and the erection of a new build bungalow. Addition of rooflights to the rear elevation, application of render to the modern extension

18 Church Street Stanground Peterborough PE2 8HE

DeterminedReference: 25/01515/FULPeterborough City Council

Last published check: 2 Oct 2026, 20:35. Check the council record for more recent changes.

Application location

18 Church Street Stanground Peterborough PE2 8HE

This record has no verified map location.

Application summary

Status
Determined
Application type
Planning Application (Full)
Received
22 Nov 2025
Validated
Not published
Determination deadline
10 Feb 2026
Local authority
Peterborough City Council

Application overview

Splitting the existing dwelling into two residential dwellings and internal alterations, the conversion and extension of an existing barn to a residential dwelling, demolition of an existing row of garages and the erection of a new build bungalow. Addition of rooflights to the rear elevation, application of render to the modern extension

Proposal details

Reference
25/01515/FUL
Alternative references
PP-14462818
Development type
Minor Dwellings (1-9/less than 0.5ha)
Ward
Fletton & Stanground
Parish
Peterborough
Agent
Mr Richard Garnett
UPRN
100090184163

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 88 of 88

DocumentPublishedAction
Plans: Conservation Roof Light - CR_CRSF_LS_CDCPLANS27 Nov 2025View
Plans: Conservation Roofligt - Pantile - CR_CRPS_MB_BDCPLANS22 Nov 2025View
Application Form: Application FormDCAPFORM22 Nov 2025View
Application Supporting Document: Bat Emergence Survey ReportDCSUPDOC22 Nov 2025View
Representation from Consultee (Web): PCC - Archaeology ServicesDCCONWEB22 Dec 2025View
Representation from Consultee (Web): Wildlife Officer FPDCCONWEB16 Jan 2026View
Superceded - Plans: Location Block and Site Plans - E013-DR-A01DCPLANS22 Nov 2025View
Plans: Proposed Shadow Study - E013-DR-B11DCPLANS22 Nov 2025View
Representation from Consultee (Web): Natural EnglandDCCONWEB22 Jan 2026View
Superceded Plans: Manor Farm House Existing Floor Plans - E013-DR-A02DCPLANS22 Nov 2025View
Representation from Consultee (Web): PCC-Open Space ManagementDCCONWEB2 Jan 2026View
Superceded - Plans: Proposed Site Context Elevations - E013-DR-B08DCPLANS22 Nov 2025View
Plans: Barn Conversion Floor Plan and Elevations (Split 1-2) E013-DR-A04/B06DCPLANS22 Nov 2025View
Superceded - Plans: External Surface and SW Drainage - E013-DR-B12DCPLANS22 Nov 2025View
Representation from Consultee (Web): Peterborough Civic SocietyDCCONWEB22 Dec 2025View
Public Comment: - 3 Chapel Street StangroundDCREPP29 Dec 2025View
Plans: New Build Bungalow Proposed Floor Plans and Elevations - E013-DR-B04DCPLANS22 Nov 2025View
Representation from Consultee (Web): Pollution Control - CommentsDCCONWEB26 Jan 2026View
Representation from Consultee (Web): LLFA - CommentsDCCONWEB19 Dec 2025View
Superceded - Plans: Site Floor Plan - E013-DR-B01DCPLANS22 Nov 2025View
Plans: Manor Farm House Proposed Elevations - E013-DR-B03DCPLANS22 Nov 2025View
Plans: Existing Site Context Elevations - E013-DR-B07DCPLANS22 Nov 2025View
Application Supporting Document: Sustainable (SuDS) and Rainwater Drainage strategyDCSUPDOC22 Nov 2025View
Superceded - Plans: Barn Conversion Floor Plans and Elevations - E013-DR-B06DCPLANS22 Nov 2025View
Representation from Consultee (Web): Conservation officer commentsDCCONWEB23 Jan 2026View
Representation from Consultee (Web): Tree Officer's commentsDCCONWEB8 Jan 2026View
Superceded - Plans: Manor Farm House Proposed Floor Plans - E013-DR-B02DCPLANS22 Nov 2025View
Plans: Existing and Proposed Site Sections - E013-DR-B09DCPLANS22 Nov 2025View
Application Supporting Document: Design and Access StatementDCSUPDOC22 Nov 2025View
Application Supporting Document: Biodiversity ChecklistDCSUPDOC26 Nov 2025View
Plans: Manor Farm House Existing Elevations - E013-DR-A03DCPLANS22 Nov 2025View
Representation from Consultee (Web): Historic EnglandDCCONWEB24 Dec 2025View
Photograph of Site NoticeDCSNPHOT19 Dec 2025View
Photograph of Site NoticeDCSNPHOT19 Dec 2025View
Plans: Existing Garage Plans and Elevations - A05DCPLANS27 Nov 2025View
Application Supporting Document: Rainwater Management ReportDCSUPDOC22 Nov 2025View
Application Supporting Document: Arboricultural Impact Assessment, Method Statement and Tree Protection PlanDCSUPDOC16 Dec 2025View
Representation from Consultee (Web): Local HighwaysDCCONWEB8 Jan 2026View
Plans: Existing Shadow Study - E013-DR-B10DCPLANS22 Nov 2025View
Application Supporting Document: Heritage Impact AssessmentDCSUPDOC22 Nov 2025View
Plans: Manor Farm House Plans and Elevations (Split 1-4) - E013-DR-A02/A03/B02/B03DCPLANS22 Nov 2025View
Plans: Barn Existing Plans and Elevation - E013-DR-A04DCPLANS22 Nov 2025View
Application Supporting Document: Tree Constraints ReportDCSUPDOC16 Dec 2025View
Farm House Existing Floor Plans-A02DCPLANS27 Mar 2026View
Existing Shadow Study- B09DCPLANS27 Mar 2026View
Proposed Shadow Study- B10DCPLANS27 Mar 2026View
External surfaces and SW drainage- B11DCPLANS27 Mar 2026View
Barn Conversion Floor Plans and Elevations- B05DCPLANS27 Mar 2026View
Existing Site Context Elevations- B06DCPLANS27 Mar 2026View
Proposed Site Context Elevations- B07DCPLANS27 Mar 2026View
Existing and Proposed Site Sections- B08DCPLANS27 Mar 2026View
Superceded - Farm House Proposed Floor Plans- B02DCPLANS27 Mar 2026View
Farm House Proposed Elevations- B03DCPLANS27 Mar 2026View
Proposed New Build Plans- B04DCPLANS27 Mar 2026View
Farm House Existing Elevations- A03DCPLANS27 Mar 2026View
Barn Existing Plans and Elevations- A04DCPLANS27 Mar 2026View
Superceded Site Floor Plan- B01DCPLANS27 Mar 2026View
Superceded - Location block and site plans- A01DCPLANS27 Mar 2026View
PCC Archaeology OfficerDCCONWEB1 Apr 2026View
Tree Officer - CommentsDCCONWEB10 Apr 2026View
Wildlife Officer comments FPDCCONWEB14 Apr 2026View
Local Highway Authority CommentsDCCONWEB24 Apr 2026View
Anglian WaterDCCONWEB29 Apr 2026View
Revised: Habitat Regulations Assessment: Stage 1.DCSUPDOC1 Jul 2026View
Superceded- Site Floor Plan (Drawing Number: E013-DR-B01 Rev C).DCPLANS1 Jul 2026View
BNG Headline ResultsDCSUPDOC1 Jul 2026View
Soakaway_Infiltration_Test_Report - E013DCSUPDOC1 Jul 2026View
BNG Part 1 and 2 - v3 180626DCSUPDOC1 Jul 2026View
Proposed Floor Plans (Drawing Reference: E013-DR-B02 Rev B).DCPLANS28 Jul 2026View
Revised: Existing and Proposed Sections (Drawing Reference: E013-DR-B04 Rev A).DCPLANS28 Jul 2026View
Revised: Existing Floor Plans (Drawing Reference: E013-DR-A02 Rev B).DCPLANS28 Jul 2026View
Historic EnglandDCCONWEB29 Jul 2026View
Conservation officer commentsDCCONWEB30 Jul 2026View
Archaeological Services ReconsultationDCCONWEB3 Aug 2026View
Archaeology CommentDCCONWEB3 Aug 2026View
Natural EnglandDCCONWEB6 Aug 2026View
Lead Local Flood AuthorityDCCONWEB7 Aug 2026View
Comment - 3 Chapel StreetDCREPP11 Aug 2026View
PollutionDCCONWEB12 Aug 2026View
Local HighwaysDCCONWEB17 Aug 2026View
Wildlife Officer Consultation RRDCCONWEB17 Aug 2026View
Open Space Management - CommentsDCCONWEB18 Aug 2026View
Revised - Location Block and Site Plans (Drawing Number: E013-DR-A01 Rev B)DCPLANS24 Aug 2026View
Revised - Site Floor Plan (Drawing Number: E013-DR-B01 Rev D).DCPLANS24 Aug 2026View
Wildlife Officer Consultation RRDCCONWEB26 Aug 2026View
Local Highway Authority - Comments V2DCCONWEB8 Sept 2026View
79465_Decision_Notice_-_PERMIT.pdfDCDEC8 Sept 2026View
case officer reportDCCORPTP9 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Site notice date

    Published milestoneCouncil source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Application date

    Published milestoneCouncil source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted
79465_Decision_Notice_-_PERMIT.pdf
Planning conditions
  1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: In accordance with Section 91 of the Town and Country Planning Act 1990 (as amended).
  2. The development hereby permitted shall be carried out in accordance with the following approved plans: - Location Block and Site Plans (Drawing Number: E013-DR-A01 Rev B). - Site Floor Plan (Drawing Number: E013-DR-B01 Rev D). - Existing and Proposed Sections (Drawing Number: E013-DR-B04 Rev A). - Proposed Site Context Elevations (Drawing Number: E013-DR-B07 Rev A). 0 - Proposed Elevations (Drawing Number: E013-DR-B03). - Proposed Floor Plans (Drawing Number: E013-DR-B02 Rev B). - Barn Conversion Floor Plans and Elevations (Drawing Number: E013-DR-B05 Rev A). - New Build Proposed Floor Plans (Drawing Number: E013-DR-B04 Rev A). - External Surfaces and SW Drainage (Drawing Number: E013-DR-B11 Rev A). Reason: For the avoidance of doubt and in the interest of proper planning
  3. No development other than groundworks and foundations shall take place unless and until details of all external facing materials have been submitted to and approved in writing by the Local Planning Authority. The details submitted for approval shall include the name of the manufacturer, the product type, colour (using BS4800) and reference number. The development shall not be carried out except in accordance with the approved details. Reason: For the Local Planning Authority to ensure a satisfactory external appearance, in accordance with Policy LP16 and LP19 of the Peterborough Local Plan (2019) and Chapters 14 and 20 of the National Planning Policy Framework (2026).
  4. The development hereby permitted shall not begin unless and until a biodiversity net gain plan has been submitted to and agreed in writing with by the Local Planning Authority. The biodiversity net gain plan shall address the following matters: (a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat (b) the pre-development biodiversity value of the onsite habitat (c) the post-development biodiversity value of the onsite habitat (d) any registered offsite biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development (e) any biodiversity credits purchased for the development, and (f) such other matters as the Secretary of State may by regulations specify. Thereafter, the development shall be carried out in accordance with the agreed approved details. Reason: In accordance with the requirements of Schedule 14, Part 1 of paragraph 14 of the Environment Act 2021 and Policy LP28 of the Peterborough Local Plan (2019). This is a reminder of the statutory condition as outlined in the Environment Act.
  5. No development shall take place (including demolition, ground works, vegetation clearance) until a construction ecological management plan (CEcMP: Biodiversity) has been submitted to and approved in writing by the local planning authority. The CEcMP (Biodiversity) shall include the following: a) Summary of potentially damaging activities. b) Identification of ''biodiversity protection zones'', as applicable. c) Practical measures (physical measures, sensitive working practices, and biosecurity measure) to avoid or reduce negative impacts during construction (may be provided as a set of method statements) d) The location and timing of sensitive works to avoid harm to biodiversity features. e) The times during construction, roles and responsibilities of an ecological clerk of works (ECoW need to be present on site to oversee works. f) Responsible persons and lines of communication. g)Use of protective fences, exclusion barriers and warning signs. The approved CEcMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details. Reason: In the interests of the conservation and enhancement of biodiversity, in accordance with Policy LP28 of the Peterborough Local Plan (2019) and Chapter 19 of the National Planning Policy Framework 2026. This is a pre-commencement condition because the habitat restoration and management scheme will be an integral part of the development including during the construction works.
  6. No development other than groundworks and foundations shall take place unless a scheme for biodiversity enhancements (as described within the Ecological Reports), shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include the position, type and number of enhancements proposed. All enhancements shall be installed using accepted best practice and retained thereafter. Reason: In the interests of visual amenity of the area and the enhancement of biodiversity, in accordance with Policies LP16, LP28 and LP29 of the Peterborough Local Plan (2019) and Chapter 19 of the National Planning Policy Framework 2026.
  7. If the development hereby approved does not commence within 12 Months from the date of the planning consent, the approved ecological measures shall be reviewed and, where necessary, amended and updated. The review shall be informed by further ecological surveys commissioned to i) establish if there have been any changes in the presence and/or abundance of ecological constraints, and ii) identify any likely new ecological impacts that might arise from any changes. Where the survey results indicate that changes have occurred that will result in ecological impacts not previously addressed in the approved scheme, the original approved ecological measures will be revised and new or amended measures, and a timetable for their implementation, will be submitted to and approved in writing by the local planning authority prior to the commencement of development. Works will then be carried out in accordance with the proposed new approved ecological measures and timetable. Reason: In the interests of the conservation and enhancement of biodiversity, in accordance with Policy LP28 of the Peterborough Local Plan (2019) and Chapter 19 of the National Planning Policy Framework 2026.
  8. No development shall take place until a Construction Traffic Management Plan has been submitted to and approved in writing by the Local Planning Authority. The Construction Management Plan shall include but not be limited to the following:- a) A scheme of chassis and wheel cleaning for all construction vehicles to include the details of location and specification of the system, together with hard surfacing laid between the apparatus and public highway in either concrete or tarmacadam, to be maintained free of mud, slurry and any other form of debris whilst in use. A contingency plan including if necessary the temporary cessation of all construction operations to be implemented in the event that the approved vehicle cleaning scheme fails to be effective for any reason. b) Haul routes to the site c) Hours of delivery. d) Banksman to ensure that vehicles can access the site upon arrival to ensure that there is no queuing on the public highway. e) Details of site compounds, storage area and contractor and visitor parking. f) Details of any temporary lighting which must not directly light the public highway. The development shall thereafter be carried out in accordance with the approved Construction Traffic Management Plan. Reason: In the interests of highway safety in accordance with Policy LP17 of the Peterborough Local Plan 2019 andChapter 15 of the National Planning Policy Framework (2026). This is a pre-commencement condition as the CMP needs to be in place before works start on site.
  9. No development shall take place until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority which shall detail measures for the control of surface water drainage during the construction stage of the proposed development. It shall include details for all phases, the methodology and measures to be put in place to ensure no flooding from the site and how those measures will be managed. It should also include methods for preventing or mitigating against ground water pollution from leaving the site. The approved Construction Method Statement shall thereafter be strictly adhered to throughout the construction period. Reason: To prevent the increased risk of flooding and to improve and protect water quality, in accordance with policy LP32 of the Peterborough Local Plan 2019 and Chapter 18 of the National Planning Policy Framework (2026). The condition is pre-commencement as it would be unreasonable to require applicants to undertake this work prior to consent being granted and the details need to be agreed before construction begins.
  10. Prior to first occupation or commencement of the vehicular access shall be laid out and completed in accordance with drawing Site Floor Plan (Drawing Number: E013-DR-B01 Rev D and retained in perpetuity. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2026).
  11. The visibility splays at either side of the junction of 18 Church Street Stanground Peterborough, PE2 8HE with the public highway shall be provided in accordance with drawing number Site Floor Plan (Drawing Number: E013-DR-B01 Rev D. For the avoidance of doubt these splay lines shall measure 2.4 metres along the centre line of the proposed access from its junction with the channel line of the public highway and 25 metres measured along the channel line of the public highway from the centre line of the proposed access road. The visibility splays shall thereafter be retained and kept permanently clear of all obstacles above 600mm in height. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2026).
  12. Prior to occupation or the commencement of the use, the parking and turning shall be provided to enable vehicles to enter, turn and leave the site in forward gear and park clear of the public highway. The area shall be delivered in accordance with drawing Site Floor Plan (Drawing Number: E013-DR-B01 Rev D and thereafter retained for that specific use in perpetuity. Reason: In the interest of highway safety, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2026).
  13. No demolition/development/change of land use or other work shall take place/commence until an archaeological mitigation strategy, including a Written Scheme of Investigation (WSI), has been submitted to, and approved in writing by, the Local Planning Authority (LPA). The WSI shall fulfil the requirements specified in a Brief issued by the Archaeology Services. Thereafter, for land that is included within the WSI, the demolition/development/change of land use or other work shall not take place except in complete accordance with the approved WSI. The approved WSI shall be implemented in full. The WSI shall detail the programme of archaeological work and include the statement of significance, research objectives, the programme and methodology of site investigation and recording, and the nomination of a competent person(s) or organisation to undertake the agreed works, with timetables and any phasing of work. It will also detail the programme for post-investigation assessment and subsequent analysis, publication and dissemination, and deposition of archival materials. This condition may be discharged in stages but shall not be fully discharged until the whole mitigation strategy set out in the WSI has been fulfilled to the satisfaction of the LPA. The typical stages for discharge are as follows: 1 - Submission and approval of the WSI 2 - Completion of the agreed fieldwork and post investigation assessment, as applicable 3 - Reporting/publication 4 - Archiving Should significant remains be encountered in the course of the fieldwork, the LPA shall be informed, and the applicant shall ensure that any such exposed remains are undisturbed until their significance can be determined and consideration of their reburial/retention in situ or other mitigation is addressed. Reason: To secure the requirement of the planning applicant or developer to mitigate the impact of their scheme on the historic environment, and to ensure investigation, recording, reporting and presentation of archaeological heritage assets affected by their scheme, in accordance with Policy LP19 of the Peterborough Local Plan (2019) andChapter 20 of the National Planning Policy Framework (2026). This is a pre-commencement condition as the WSI must be submitted and approved before any demolition/development change of land use or other work takes place.
  14. No development shall take place until the applicant, or their agents or successors in title, have submitted a written programme and specification for the archaeological monitoring and recording to be reviewed and agreed in writing by the Local Planning Authority. The archaeological monitoring and recording must be undertaken by an Archaeologist and all groundworks or any other operations must be observed and recorded. Within three months of completion of the recording, the archaeological monitoring and recording report shall be submitted for archiving and notification of this process must be submitted to and reviewed by the Local Planning Authority. Reason: To ensure that features of archaeological interest are properly examined and recorded in accordance with Policy LP19 of the Peterborough Local Plan and Chapter 20 of the National Planning Policy Framework (2026). This is a pre-commencement condition as the written programme and specification for the archaeological monitoring and recording must be submitted and approved before any demolition/development change of land use or other work takes place.
  15. Prior to commencement of the development hereby permitted;, detailed contoured plans with existing and proposed spot heights and cross sections, along with finished floor levels of the proposed shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in strict accordance with the levels shown on the approved drawing(s). Reason: In the interests of the visual appearance of the development and in order to protect and safeguard the amenities of the adjoining occupiers, in accordance with Policies LP16 and LP17 of the Peterborough Local Plan (2019) and Chapter 14 of the National Planning Policy Framework 2026. This is a pre-commencement condition to ensure that no groundworks take place which result in finished development heights that may cause harm to the visual amenity of the area or neighbouring amenity.
  16. Prior to the installation of any domestic microgeneration Air Source Heat Pump (ASHP) equipment full details including sound power level and location of the ASHP equipment shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall identify those that meet permitted development by virtue of Class G, Part 14 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended), and therefore MCS 020(a), and those that do not comply with MCS 020(a). Mitigation measures shall be detailed for those that do not comply with MCS 020(a). Noise affecting the property the ASHP serves shall also be assessed and where necessary mitigated in accordance with relevant British Standards. The ASHP equipment shall be installed in accordance with the approved details. Reason: To protect occupier amenity in accordance with Policy LP17 of the Peterborough Local Plan (2019) and Chapter 17 of the National Planning Policy Framework (2026).
  17. Notwithstanding the submitted details, prior to the occupation of the development a scheme for soft landscaping of the site shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the following:- - Proposed finished ground and building slab levels - Planting plans including retained trees, species, numbers, size and density of planting - An implementation programme (phased developments only) - Proposed planting plans including trees, species, numbers, size and density (native species; other Neutral Grassland to be created using a wildflower meadow mix such as Emorsgate seeds EM1, EM2 or EM3 seed mixes) - Position, type and recommended number of any biodiversity enhancements - Boundry treatments The soft landscaping shall be carried out within the first available planting season following completion of the development or first occupation (whichever is the sooner) or alternatively in accordance with a timetable for landscape implementation which has been approved as part of the submitted landscape scheme. Development shall be carried out in accordance with the submitted details. Any trees, shrubs or hedges forming part of the approved landscaping scheme that die, are removed or become diseased within five years of the implementation of the landscaping scheme shall be replaced during the next available planting season by the developers, or their successors in title with an equivalent size, number and species to those being replaced. Any replacement trees, shrubs or hedgerows dying within five years of planting shall themselves be replaced with an equivalent size, number and species. Reason: In the interests of visual amenity of the area and the enhancement of biodiversity, in accordance with Policies LP16, LP28 and LP29 of the Peterborough Local Plan (2019) and Chapters 14 and 19 of the National Planning Policy Framework (2026).
  18. No external lighting shall be erected unless and until the details of the proposed external lighting (free-standing or building-mounted) has been submitted and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details and implemented prior to the commencement of use. Reason: In the interests of visual amenity of the area and biodiversity, in accordance with Policies LP16 and LP28 of the Peterborough Local Plan (2019) and Chapters 14 and 19 of the National Planning Policy Framework (2026).
  19. Prior to the first occupation or commencement of use, details of an enclosed and secure cycle shelter to accommodate cycles shall be submitted and agreed in writing with the Local Planning Authority. This area shall thereafter be retained for the purposes of cycle parking in connection with the development in perpetuity. Reason: In the interests of highway safety and to encourage travel by sustainable modes, in accordance with Policy LP13 of the Peterborough Local Plan (2019) and Chapter 15 of the National Planning Policy Framework (2026).
  20. All development shall be carried out in strict accordance with BS5837 2012, Trees in relation to design, demolition and construction. AIA, AMS & TPP in relation to trees at trees at Manor Farmhouse, Stanground (Dated 16.12.25) (Prepared by East Midlands Tree Surveys Ltd). Reason: In order to protect and safeguard the amenities of the area, in accordance with Policies LP16 and LP29 of the Peterborough Local Plan (2019) and Chapter 19 of the National Planning Policy Framework (2026).
  21. If, during development, contamination not previously considered is identified, then the Local Planning Authority shall be notified immediately, and no further work shall be carried out until a method statement detailing a scheme for dealing with the suspect contamination has been submitted to and agreed in writing with the Local Planning Authority. The development shall thereafter not be carried out except in complete accordance with the approved scheme. Reason: To ensure potential risks arising from previous site uses have been fully assessed in accordance with Policy LP33 of the Peterborough Local Plan (2019) and Chapter 17 of the National Planning Policy Framework (2026).
  22. Prior to first occupation of the dwellings hereby approved, the surface water drainage system shall be laid out in accordance with drawing E013-DR-B01 Rev C and "E013 Soakaway/Infiltration Suitability Report”. These works include the removal of the existing surface water connection into a combined sewer, and for the new surface water sewers from the site to be connected into the surface water sewer with a restricted discharge of 2l/s for the entire development. Reason: To reduce the risk of flooding to the proposed development and future occupants in accordance with Policy LP32 of the Peterborough Local Plan 2019 and Chapter 18 of the National Planning Policy Framework (2026).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.