The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: • 2072 005 Proposed Ground Floor & Site & Location Plan • 2072 006 Proposed South & East Elevations • 2072 007 Proposed North & West Elevations & Section A-A Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Before the substantial completion of the development hereby approved, the installation of the bee/insect hotel detailed within the Green Infrastructure Statement and shown on drawing 2072 005 Proposed Ground Floor & Site & Location Plan shall be installed within the rear garden and thereafter retained. Reason: In the interests of biodiversity enhancement and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
In the first planting season following the substantial completion of the development hereby approved, the ecological enhancement measures detailed within the Green Infrastructure Statement and on proposed drawing 2072 005 Proposed Ground Floor & Site & Location Plan, which includes the provision of pollinator-friendly planting and a water butt, shall be implemented and thereafter retained. Reason: To maintain and enhance biodiversity, in accordance with Planning Policy Wales and Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, GN.1, GN.2, GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
This application has been screened in accordance with Natural Resources Wales’ interim advice for planning applications within the river Special Areas of Conservation (SACs) catchments (issued on 20th January 2021). It is considered that this development is unlikely to increase phosphate inputs as it falls within the following criterion in the interim advice: Criterion 7 - Development to an existing residential property
This application has been screened in accordance with Natural Resources Wales’ interim advice to Chief Planners dated 25th July 2025. It is considered that this development is unlikely to have a likely significant effect on the Marine SAC as the following criterion applies: Criterion 3 - Development to an existing residential property that does not result in the creation of independent living accommodation, a separate planning unit and/or a change in use, where it can no longer be said to be ancillary to the main residence.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.