Council planning record

Addition of a rear dormer and front rooflight, replacement front extension and internal alterations.

Ty Mor, PENALLY, Tenby, Pembrokeshire, SA70 7QE

Decision MadeReference: 26/0198/PAPembrokeshire County Council

Last published check: 4 Oct 2026, 12:25. Check the council record for more recent changes.

Application location

Ty Mor, PENALLY, Tenby, Pembrokeshire, SA70 7QE

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Full
Received
18 Jun 2026
Validated
Not published
Determination deadline
12 Aug 2026
Local authority
Pembrokeshire County Council

Application overview

Addition of a rear dormer and front rooflight, replacement front extension and internal alterations.

Proposal details

Reference
26/0198/PA
Alternative references
PP-15019299
Ward
Manorbier And Penally
Parish
SV_Penally
Agent
Mr Owen Argent
UPRN
10009879846

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Conditionally Approved
Planning conditions
  1. The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
  2. The development shall be carried out in accordance with the following approved plans and documents: • A3703 53 001 PROPOSED LOCATION PLAN • A3703 53 100 PROPOSED SITE PLAN • A3703 53 101 PROPOSED PLAN & SECTION • A3703 53 102 PROPOSED GREEN INFRASTRUCTURE PLAN • A3703 53 201 PROPOSED ELEVATIONS Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
  3. Before the substantial completion of the development hereby approved the bat box detailed in the Bat Potential Roosting Feature Assessment and shown on drawing A3703 53 201 PROPOSED ELEVATIONS shall be installed on the west elevation of the dwelling and thereafter retained. Reason: In the interests of biodiversity enhancement and to accord with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
  4. In the first planting season following the substantial completion of the development hereby approved, the ecological enhancement measures detailed within the DESIGN & ACCESS STATEMENT and on proposed drawing A3703 53 102 PROPOSED GREEN INFRASTRUCTURE PLAN, comprising the planting of wildflower meadow at the bottom of the garden shall be implemented and thereafter retained. Reason: To maintain and enhance biodiversity, in accordance with Planning Policy Wales and policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
  5. This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
  6. This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
  7. Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP1, GN.1, GN.2, GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
  8. All external lighting in connection with the proposed development shall be positioned at low level, hooded, and downward facing, with a light temperature below 2700k and be operated on a PIR activated timer for the lifespan of the development. Reason: To ensure that nocturnal animal and plant species and the ecological interests of the site are adequately protected and to accord with policy: GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013), Section 6 of PPW (Edition 12).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.