The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: 15139, Rev A, RGP Roof Block plan, dated 07/04/22 15139, Rev A, GDP Roof elevations and 3D, dated 05/16/25 15139, Rev A, RGP - Roof penetration details, dated 06/01/25 15139, Rev B, RGP Roof sections, dated 05/16/25 15139, Rev A, RGP Quay Side 3Ds, dated 30/03/26 Location plan, scale 1:1250, dated 25-June-2026 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
%TEXT% Reason:
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below • Policies SP 1 (Sustainable Development), GN.1 (General Development Policy), GN.2 (Sustainable Design), GN.37 (Protection and Enhancement of Biodiversity) and GN.38 (Protection and Enhancement of the Historic Environment) of the LDP and Historic Environment (Wales) Act 2023. It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
Under the Habitats Regulations, where a plan or project is likely to have a significant effect on a European site, either alone or in combination with other plans or projects, and where it is not directly connected with or necessary to the management of the site previously (designated pursuant to EU retained law) the competent authority must carry out an appropriate assessment of the implication of the plan or project in view of the site’s conservation objectives. Natural Resources Wales has set new nitrates and phosphate standards for the river SACs in Wales. Any proposed development within the SAC catchments that might increase the amount of nitrates and phosphate within the catchment could lead to additional damaging effects to the SAC features and therefore such proposals must be screened through a HRA to determine whether they are likely to have a significant effect on the SAC condition. - This application has been screened in accordance with Natural Resources Wales’ Advice to planning authorities for planning applications affecting nutrient sensitive Special Areas of Conservation (Version 5.1, published 09/02/2026). It is considered that this development is unlikely to increase nitrogen inputs as it falls within the following criterion in the interim advice: Criteria 2: development that does not increase the volume or concentration of wastewater
The above is necessary because all British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (The Habitats Directive). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations (2017). As the bat survey revealed the presence of a bat, work may require derogation in the form of a licence from NRW, which the developer has to apply for. Before such a licence can be granted, the following tests (specified in Article 16 of the EU Habitats Directive and in regulation 55 (9) of the 2017 Regulations) must be satisfied: (i) there is no satisfactory alternative to the derogation; (ii) the derogation is not detrimental to the maintenance of the populations of the species concerned at a favourable conservation status in their natural range; (iii) the derogation is in the interests of public health and public safety, or for other imperative reasons of overriding public interest, including those of a social or economic nature and beneficial consequences of primary importance for the environment. Planning Policy Wales states that to avoid developments with planning permission subsequently not being granted a licence in relation to a European Protected Species (EPS), planning authorities must take the three requirements for a derogation into account when considering development proposals where a EPS is present and must be satisfied a where an EPS licence is required it will be granted by NRW.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.