The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: • 26011/02 Proposed Layout Rev H • 26011/03 Materials Sheet Rev H Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
In the first planting season following the substantial completion of the development hereby approved, the ecological enhancement measures detailed within the Green Infrastructure Statement and drawing 26011/02 Proposed Layout Rev H, including the provision of native planting along the northern boundary to the rear of the existing garage and within the surrounding garden areas, shall be implemented and retained thereafter. Reason: To maintain and enhance biodiversity, in accordance with Planning Policy Wales and policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Before the substantial completion of the development hereby approved, the built-in Vivaro Pro bat tube and bird box detailed within the Green Infrastructure Statement and shown on the drawing 26011/02 Proposed Layout Rev H shall be installed and thereafter retained. Reason: In the interests of biodiversity enhancement and to accord with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP1, GN.1, GN.2, GN.37, GN.38 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
Any external lighting proposed in connection with the approved development shall be positioned at a low level, downward facing, hooded with a light temperature below 2700k and on a short PIR activated timer and retained as such thereafter. Reason: In the interests of biodiversity and to accord with Policy GN.37 (Protection and Enhancement of Biodiversity) of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Under the Wildlife and Countryside Act 1981 it is an offence to damage, destroy or obstruct access to any structure or place that bats, great crested newts or any other animal listed in Schedule 5 of the Act use for shelter or protection. Under this Act it is also an offence to disturb barn owls whilst building a nest or in the vicinity of a nest containing eggs or young. If there is any suggestion that the site is being occupied by any of the species, you are advised to consult Natural Resources Wales on Telephone: 0300 065 3000 or email: enquiries@naturalresourceswales.gov.uk, before proceeding with the development hereby authorised.
It is recommended that the applicant be informed that all British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (‘The Habitats Directive’). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations 2017. British bats are also protected under Schedule 5 of the Wildlife and Countryside Act (1981) (as amended). It is a criminal offence to intentionally, or recklessly disturb, harm, or kill bats or to destroy a bat 'roost', even if only occasionally used. If bats are encountered on site works should stop immediately an NRW should be contacted (Natural Resources Wales, - General Enquiries: enquiries@naturalresourceswales.gov.uk or 0300 065 3000 Mon-Fri, 8am - 6pm) a licence may then need to be applied for from NRW. Licences are not automatically granted by virtue of a valid planning consent and it may be possible that the necessary licence application may be refused.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.