Council planning record

Agricultural building for the storage of fodder and machinery

Nantycastell, LLWYNDRAIN, Llanfyrnach, Pembrokeshire, SA35 0AU

Decision MadeReference: 26/0086/AGPembrokeshire County Council

Last published check: 2 Oct 2026, 21:34. Check the council record for more recent changes.

Application location

Nantycastell, LLWYNDRAIN, Llanfyrnach, Pembrokeshire, SA35 0AU

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Agri Notf
Received
12 May 2026
Validated
Not published
Determination deadline
8 Jun 2026
Local authority
Pembrokeshire County Council

Application overview

Agricultural building for the storage of fodder and machinery

Proposal details

Reference
26/0086/AG
Alternative references
PP-14845676
Ward
Boncath And Clydau
Agent
Mr Gethin Beynon
UPRN
10009877784

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Dispatch date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Unconditionally Approved
Planning conditions
  1. The developer must ensure that: 1. There is no diminution in the width of the right of way available for use by members of the public 2. No building materials are stored on the right of way 3. No damage or substantial alterations, either temporary or permanent, is caused to the surface of the right of way 4. Vehicle movements are arranged so as not to interfere with the public’s use of the way 5. No additional barriers (e.g. gates) are to be placed across the right of way, of either a temporary or permanent nature 6. No wildlife fencing or other ecological protection features associated with wildlife mitigation measures are placed across the right of way or allowed to interfere with the right of way 7. The safety of members of the public using the right of way is ensured at all times 8. The granting of planning consent does not authorise lawful authority to drive a motor vehicle on a public right of way. Developers/landholders should ensure that public use of the Public Right of Way takes precedence over private vehicular traffic. It is a criminal offence to damage the surface of a Public Right of Way, and the consent of the County Council must be sought for the route to be re-surfaced even if the surface is to be improved. The granting of planning permission for development of land over which there is a public right of way does not itself constitute authority for interference with the right of way or for its closure or diversion.
  2. Pembrokeshire County Council as SuDS Approving Body (SAB) considers that by virtue of the fact that the construction area having drainage implications appears to be in excess of 100 square metres / more than one property; the proposed works will require SAB approval prior to the commencement of any works on site relating to this application. If there is a breach of the requirement for SAB approval, the SAB may at any time issue an enforcement notice. The failure to obtain SAB approval may have a detrimental effect upon the future sale of the properties, which could also result in insurance applications and or flood event settlement being compromised. Please see www.pembrokeshire.gov.uk/planning-contacts/sustainable-drainage-approving-body-sab for more information.
  3. This application has been screened in accordance with Natural Resources Wales’ interim advice for planning applications within the river Special Areas of Conservation (SACs) catchments (issued on 20th January 2021). It is considered that this development is unlikely to increase phosphate inputs as it falls within the following criterion in the interim advice: 1. Any development that does not increase the volume or concentration of nutrients in wastewater;
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.