The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: • 1515/009 Proposed Site + Location plan • 1515/010 Proposed Ground Floor Plan • 1515/011 Proposed First Floor Plan • 1515/012 Proposed Section A-A • 1515/013 Proposed Section B-B • 1515/014 Proposed Section C-C • 1515/015 Proposed Elevations • 1515/016 Proposed Elevations • 1515/017 Proposed Perspective • 1515/018 Proposed Rear Perspective • 1515/019 Soakaway - Non-Traffic Loading Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
In the first planting season following the substantial completion of the development hereby approved, the ecological enhancement measures detailed within the Green Infrastructure Statement and on proposed drawing 1515/009 Proposed Site + Location plan, the planting of a new fruit tree within the site, shall be implemented and thereafter retained. Reason: To maintain and enhance biodiversity, in accordance with Planning Policy Wales and policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Before the substantial completion of the development hereby approved the external lighting, bird and bat boxes detailed in the Green Infrastructure Statement and shown on drawing 1515/015 Proposed Elevations and 1515/016 Proposed Elevations shall be installed on the dwelling and thereafter retained. Reason: In the interests of biodiversity enhancement and to accord with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
No surface water and/or land drainage shall be allowed to connect directly or indirectly with the public sewerage network. Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
The applicant may need to apply to Dwr Cymru / Welsh Water for any connection to the public sewer under S106 of the Water industry Act 1991. If the connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP1, GN.1, GN.2, GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.