The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: GA01 Rev B Location Plan, Block Plan Proposals, dated Dec 2025 GA02 Rev A Elevations, dated Dec 2025 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
The soft landscaping comprising the incorporation of blackthorn and hawthorn, the details and location of which are contained within the Green Infrastructure Statement, received 13 April 2026 and depicted on Drawing No. P05 Proposed Site Plan, dated 23 March 2026, shall be carried out in the first planting season following first use of the extension or the substantial completion of the development, whichever is sooner and retained thereafter. Any plants which within a period of 5 years from the date of planting die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Notwithstanding the information contained within the application, prior to first use of the development hereby approved, details of a scheme for the disposal of surface water shall be submitted to and approved in writing by the local planning authority. The scheme shall include an assessment of the suitability of ground conditions with percolation results for the proposed method of water disposal. The scheme shall be implemented in accordance with the approved details prior to the first use of the stables and machinery shed hereby approved and retained for as long as the development exists. Reason: To ensure that a satisfactory means of drainage is provided, and to accord with policies GN.1 and GN.2 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Prior to first use of the proposed development, the off-street parking facilities and turning facilities as shown on drawing no. GA01 Rev B hereby approved shall be provided and thereafter retained for that purpose. Reason: To ensure the satisfactory provision of parking facilities and in the interest of highway safety and the amenity of the area, and to accord with Policy GN.1 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
There shall be no retail sales from the site. Reason: To ensure the development remains compatible with its immediate surroundings to accord with Policy GN.1 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, SP 16, GN.1, GN.2 and GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
SAB APPROVAL REQUIRED The granting of planning consent for this application does not remove the requirement to gain SAB approval. The calculation of the area for SAB purposes includes all construction areas having drainage implications, which include, the footprint of all proposed buildings, pathways, patios, driveways, parking areas be they permeable or impermeable. (This list is by no means exhaustive). No deduction for the area of the footprint of any building or other structures which are demolished or removed is made when determining the construction area for SAB purposes. Pembrokeshire County Council as SuDS Approving Body (SAB) considers that by virtue of the fact that the construction area having drainage implications appears to be in excess of 100 square metres / more than one property; the proposed works will require SAB approval prior to the commencement of any works on site relating to this application. The applicant should be made aware that if there is a breach of the requirement for SAB approval (i.e. when construction work is commenced without SAB approval); the SAB may at any time issue an enforcement notice. The failure to obtain SAB approval may have a detrimental effect upon the future sale of the properties, which could also result in insurance applications and or flood event settlements being compromised. The applicant can obtain further information in relation to the requirement for SAB approval from Pembrokeshire County Council's webiste at: www.pembrokeshire.gov.uk/planning-contacts/sustainable-drainage-approving-bodysab. Approval should be sought from: SAB Community Services Directorate Infrastructure Division Pembrokeshire County Council County Hall Haverfordwest Pembrokeshire SA61 1TP e-mail: sab@pembrokeshire.gov.uk telephone: 01437 776147.
This application has been screened in accordance with Natural Resources Wales’ interim advice for planning applications within the river Special Areas of Conservation (SACs) catchments (issued on 20th January 2021). It is considered that this development is unlikely to increase phosphate inputs as it falls within the following criterion in the interim advice: Any development that does not increase the volume or concentration of wastewater;
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.