Council planning record

Discharge of Condition 3 (surface water) of Planning Permission 25/0017/PA (New 4 bedroom dwelling).

1, Bro Dewi, PUNCHESTON, Haverfordwest, Pembrokeshire, SA62 5RH

Decision MadeReference: 25/1061/DCPembrokeshire County Council

Last published check: 3 Oct 2026, 09:55. Check the council record for more recent changes.

Application location

1, Bro Dewi, PUNCHESTON, Haverfordwest, Pembrokeshire, SA62 5RH

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Discharge of Conditions
Received
11 Mar 2026
Validated
Not published
Determination deadline
5 May 2026
Local authority
Pembrokeshire County Council

Application overview

Discharge of Condition 3 (surface water) of Planning Permission 25/0017/PA (New 4 bedroom dwelling).

Proposal details

Reference
25/1061/DC
Alternative references
PP-14772931
Ward
Bro Gwaun
Parish
SV_Puncheston
UPRN
10002145504

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Part Refused_Part Approved
Planning conditions
  1. Condition 3 - Surface water disposal Condition 3 requires the submission and approval of a scheme for the disposal of surface water and results of a percolation assessment prior to any above ground works commencing. The application submission has provided the following details (dated as received on 12 March 2026) to address the requirements of this condition: - A100 Location Plan; - A270 Proposed SUDS Plan P01; - A271 Proposed SUDS Details P01; - SUDS scheme application form; - Calculations Report P01; and - 26-001-SAB Decision Notice. The above submitted details evidence percolation testing has been undertaken and demonstrate that the site is capable of successfully disposing of surface water by means of the proposed Sustainable Drainage System (SuDS). The Head of Operations and Transport (Civils) is satisfied that the ground conditions and the proposed method of surface water disposal will be effective. They confirm that SAB approval has been granted for the proposed system. Accordingly, the proposed scheme for surface water disposal will ensure that a satisfactory means of drainage is provided in accordance with policy GN.1 of the LDP (2013) and condition 3 is partially discharged. The condition will not be considered fully discharged until the approved details have been fully implemented prior to the first occupation of the dwelling and thereafter retained for as long as the development exists.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.