The development shall be carried out in accordance with the following approved plans and documents: Drawing No. 101 Location and Site Plan Drawing No. 102 Proposed Elevations Green Infrastructure Statement Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Within three months of the date of this decision, the proposed bat box and barn owl box shall be installed in accordance with the details contained within the Green Infrastructure Statement. If any of these features which, within a period of 5 years after implementation of the approved development, are removed, damaged or become otherwise defective, to such extent that, in the opinion of the Local Planning Authority, the function in relation to this planning approval is no longer delivered, shall be replaced with boxes of similar size and specification. Reason: In the interests of biodiversity enhancement and to accord with the requirements of policy GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The wildflower meadow detailed in the Green Infrastructure Statement and shown on plan number 101 Location and Site Plan shall be provided in the first planting and seeding seasons following the date of this decision and maintained thereafter. Reason: In the interests of biodiversity enhancement and to accord with the requirements of policy GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, SP 16, GN.1, GN.2 and GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
Within 6 months of the date of this decision details of a scheme for the disposal of surface water shall be submitted to and agreed in writing by the local planning authority. The scheme shall include details of the suitability of ground conditions for the proposed methods of water disposal. The scheme shall be implemented within 6 months of the date of the approval of the submitted details, in accordance with the approved details and thereafter retained for as long as the development exists. Reason: To ensure that a satisfactory means of drainage is provided, and to accord with policies GN.1 and GN.2 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.