Council planning record

Non-material amendment to Planning Permission 25/0528/PA (Variation of condition 2 (Approved Plans) of planning permission 24/0240/PA (Demolition of the existing Lidl foodstore and adjoining properties, and the erection of a new Lidl Class A1 foodstore with access, car parking, landscaping and all associated works.)

Lidl, Great North Road, Milford Haven, Pembrokeshire, SA73 2NA

Decision MadeReference: 25/1015/NMPembrokeshire County Council

Last published check: 4 Oct 2026, 11:43. Check the council record for more recent changes.

Application location

Lidl, Great North Road, Milford Haven, Pembrokeshire, SA73 2NA

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Non-Material Amendment
Received
25 Feb 2026
Validated
Not published
Determination deadline
24 Mar 2026
Local authority
Pembrokeshire County Council

Application overview

Non-material amendment to Planning Permission 25/0528/PA (Variation of condition 2 (Approved Plans) of planning permission 24/0240/PA (Demolition of the existing Lidl foodstore and adjoining properties, and the erection of a new Lidl Class A1 foodstore with access, car parking, landscaping and all associated works.)

Proposal details

Reference
25/1015/NM
Alternative references
PP-14716765
Ward
Milford East
Parish
HT_Milford_Haven
Agent
Mr Max Lewis
UPRN
100101023434

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Dispatch date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Conditionally Approved
Planning conditions
  1. The applicant is advised that this decision notice is not a planning permission; it approves only a non-material amendment to the consent granted under local planning authority reference 25/0528/PA and should be read in conjunction with that permission.
  2. Condition 4 – Surface water disposal Prior to the first use of the development hereby approved the arrangements for the disposal of surface water shall be fully implemented in accordance with the following information approved by Details Reserved by Condition reference 24/0895/DC granted on 6th February 2025: • 15678-2000-R01 SAB Application Proposed Foul and Surface Water Drainage Layout • 15678-2001-R01 Drainage Catchment Areas • 15678-2002-R01 Proposed Exceedance Route Layout • 15678-2003-R01 Section 104 Proposed Foul and Surface Water Drainage Layout • 15678-2200-R01 Proposed Long Sections • SHE-0078-3500-1850-3500 Design Drawing • SHE-0078-3500-1850-3500 Hydraulic Characteristics • SuDS Maintenance Schedule Infiltration Tank • SuDS Maintenance Schedule Permeable Paving • SuDS Maintenance Schedule • 15678-2400-R01 Typical Drainage Details • 15678-2401-R01 Manhole S7 Hydro-Brake Details • 15678-2402-R01 Proposed Combined Sewer Connection Details • 15678-2403-R01 EXMH1 Combined Sewer Connection Details • 15678-2404-R01 Proposed Manhole Details • 15678-2405-R01 Proposed Manhole Schedule • 15678-240702 Hydraulic Model 1 Design Settings • 15678-DRA-1 Designer’s Risk Assessment Thereafter the implemented approved scheme shall be maintained and retained in perpetuity. Reason: To ensure that a satisfactory means of drainage is provided and to accord with Policies GN.1 and GN.2 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
  3. Condition 7 - Construction & Environment Management Plan The development hereby approved shall be carried out in accordance with the following Construction & Environment Management Plan (CEMP) approved by Details Reserved by Condition approval reference 24/0893/DC granted on 6th February 2025: • Construction Management Plan (dated 16th December 2024) • Construction Ecological Management Plan (reference B IOC23-121-V1) Reason: In the interest of local amenity and highway safety and to accord with Policy GN.1 of the adopted Pembrokeshire Local Development Plan (2013).
  4. Condition 12 – External Lighting Any external lighting shall be installed in accordance with the following Lighting Assessment Report approved by Details Reserved by Condition reference 24/0894/DC granted on 6th February 2025: • Lighting Assessment Report (Project No: D-595720 dated 28th October 2024) and accompanying drawings (Project No: 0401054009 Drawings 00 and 01). Thereafter the installed lighting shall be in accordance with the approved details. Reason: In order to comply with The Environment (Wales) Act 2016 to maintain and enhance biodiversity and in accordance with Policies GN.1, GN.2 and GN.37 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
  5. The development hereby approved shall be carried out in accordance with the Phase 2 Ground Investigation Report (reference 798.02.01 dated January 2021); and Remediation Strategy (reference 798.04.01 dated September 2024) approved by Details Reserved by Condition reference 24/0896/DC granted on 6th February 2025. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors and to accord with Policy GN.1 of the Local Development Plan (adopted 28th February 2013).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.