The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: 2061 001 Location Plan, dated 14/08/2025 2061 005 Proposed Block, Floor Plan & Sections A-A & B-B, dated 22/08/2025 2061 006 Proposed Elevations & 3D Views, dated 22/08/2025 Green Infrastructure Statement, received 25 February 2026 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
The extension shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling known as 14, Ramsey Drive, Milford Haven, Pembrokeshire, SA73 2RQ. Reason: To prevent this extension being used as a separate unit of accommodation and to enable the Local Planning Authority to properly control any further development on the site and to accord with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Any external lighting in connection with the proposed development shall be positioned at a low level, hooded, downward facing and operated on a PIR activated timer. Reason: To protect the ecological interests of the site and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) and Section 6 of Planning Policy Wales, Edition 12.
The biodiversity enhancement measures in the form of bee bricks, insect hotel and swift box, as detailed in the Green Infrastructure Statement (received 25 February 2026), shall be installed prior to substantial completion of the extension hereby permitted or first use of the extension hereby approved, whichever is sooner and retained thereafter for as long as the development exists. Reason: To secure biodiversity enhancement, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The soft landscaping comprising two raised planters incoporating native species, the location of which is shown on drawing no. 2061 005 shall be carried out in the first planting season following first use of the extension or the substantial completion of the development, whichever is sooner and retained thereafter. Any plants which within a period of 5 years from the date of this decision die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, GN.1, GN.2 and GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
• It is recommended that the applicant be informed that all British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (‘The Habitats Directive’). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations 2017. British bats are also protected under Schedule 5 of the Wildlife and Countryside Act (1981) (as amended). • It is recommended that the applicant and contractors be informed of the possibility of encountering bats unexpectedly during works. • If bats are encountered on site works should stop immediately an NRW should be contacted (Natural Resources Wales, - General Enquiries: enquiries@naturalresourceswales.gov.uk or 0300 065 3000 Mon-Fri, 8am - 6pm) a licence may then need to be applied for from NRW. Licences are not automatically granted by virtue of a valid planning consent and it may be possible that the necessary licence application may be refused.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.