The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: 2064 001 – Location Plan; 2064 004 – Proposed GFL & Site/ Block Plan; and 2064 005 – Pro. Site Plan, Elevations, Sections, & 3D’s. Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Prior to occupation of the development hereby approved, the proposed two bird boxes shall be installed in accordance with the Green Infrastructure Statement and the details on drawing 2064 005 – Pro. Site Plan, Elevations, Sections, & 3D’s and retained thereafter. Reason: In the interests of biodiversity enhancement and to accord with the requirements of policy GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Any external lighting proposed in connection with the extension shall be positioned at a low level, downward facing, hooded and on a short PIR activated timer and retained thereafter. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The off-street parking facilities indicated on drawing 2064 004 – Proposed GFL & Site/ Block Plan shall be provided prior to occupation of the development hereby approved and retained thereafter. Reason: In the interests of biodiversity and to accord with Policy GN.37 (Protection and Enhancement of Biodiversity) of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, GN.1, GN.2, GN.22 and GN.37. It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
Any existing buildings on site should be assessed for asbestos materials prior to demolition. Any asbestos must be removed in full consultation with the Health and Safety Executive 3rd Floor, Darkgate Buildings, 3 Red Street, Carmarthen, SA31 1QL
This application has been screened in accordance with Natural Resources Wales’ interim advice for planning applications within the river Special Areas of Conservation (SACs) catchments. It is considered that this development is unlikely to increase phosphate and nitrate inputs as it falls within the following criterion in the interim advice: Criterion 3: Development to an existing residential property (e.g. extensions) that does not result in the creation of independent living accommodation, a separate planning unit and/or a change in use, where it can no longer be said to be ancillary to the main residence.
No development shall commence until a scheme for surface water disposal has been submitted to and approved in writing by the local planning authority. The scheme shall include an assessment of the sites potential for disposing of surface water by means of a sustainable drainage system, with the results of the assessment provided to the local planning authority. The scheme shall be implemented in accordance with the approved details prior to the first benificial use of the extension and car parking area, hereby approved and retained as such for as long as the development exists. Reason: To ensure that a satisfactory means of drainage is provided, and to accord with policy GN.1 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
No development shall commence until the species, size and number of plants to be planted in the exisitng empty and the new planting beds, has been submitted to and approved in writing by the local planning authority. The planting beds as shown on drawing 2064 004 – Proposed GFL & Site/ Block Plan together with the planting of the approved plants, shall be provided in the first planting and seeding seasons following occupation of the approved development or completion of the development, whichever is sooner and retained thereafter. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.