The temporary bike shed shall be erected for a period of twelve months from the date of completion and the Local Planning Authority are to be notified. Following the twelve month fixed period it shall be fully dismantled and the land reinstated to its former condition. Reason: To safeguard the amenities of neighbouring residential occupiers and to comply with Policy GN.1 of the Pembrokeshire Local Development Plan (adopted 28 February 2013).
The development shall be carried out in accordance with the following approved plans and documents: 002. Proposed Block and Location Plan. Feb 2026 003. Proposed Driveway Plan. Feb 2026 004. Proposed Front Elevations and Typical Temporary Motorbike Storage Shed. Feb 2026 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Prior to the substantial completion of the development hereby permitted, the proposed ecological enhancements detailed on the Green Infrastructure Statement and illustrated on 004. Proposed Front Elevations and Typical Temporary Motorbike Storage Shed. Feb 2026 shall be implemented. The biodiversity enhancement measures to include one bird and one bat box, shall be installed as approved and retained for as long as the development exists. Reason: In order to comply with The Environment (Wales) Act 2016 to maintain and enhance biodiversity, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The proposed native shrubs and planters as shown on drawing 002. Proposed Block and Location Plan. Feb 2026 and detailed within the Green Infrastructure Statement shall be carried out in the first planting season following occupation of the development or the completion of the development, whichever is the sooner and any plants die within a period of 5 years from the date of planting, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of a similar size and species. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP1, GN1, GN2 and GN37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
Prior to the substantial completion or the first use of the development hereby approved, whichever is the sooner, the Local Planning Authority shall be notified in writing of the date of implementation. Within 12 months of this implementation date, the development shall be removed in its entirety from the site and the land reinstated to its former condition. Reason: To safeguard the amenities of neighbouring residential occupiers and to comply with Policy GN.1 of the Pembrokeshire Local Development Plan (adopted 28 February 2013).
The development hereby approved shall be used for domestic storage of motorbikes only and shall not be used for any business or commercial operation. Reason: To safeguard the amenities of neighbouring residential occupiers and to comply with Policy GN.1 of the Pembrokeshire Local Development Plan (adopted 28 February 2013).
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.