Council planning record

Extensions and Alterations

3, Northmead, Jesse Road, Narberth, Pembrokeshire, SA67 7DN

Decision MadeReference: 25/0947/PAPembrokeshire County Council

Last published check: 4 Oct 2026, 01:36. Check the council record for more recent changes.

Application location

3, Northmead, Jesse Road, Narberth, Pembrokeshire, SA67 7DN

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Full
Received
4 Feb 2026
Validated
Not published
Determination deadline
31 Mar 2026
Local authority
Pembrokeshire County Council

Application overview

Extensions and Alterations

Proposal details

Reference
25/0947/PA
Alternative references
PP-14663315
Ward
Narberth Urban
Parish
RT_Narbeth
Agent
Aled Davies
UPRN
200003246428

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refused
Planning conditions
  1. This decision relates only to the plans identified below: 25040/101, Rev 1, Proposed block plan, dated 19/11/2025 25040/02, Rev 1, Proposed layout, dated 19/11/2025 Kite Ecology, Bat potential roosting feature assessment, Final Report, January 2026 Design and access statement, received 05/02/2026 Green Infrastructure statement, received 05/02/2026
  2. The application site compises of a semi-detached property, flanked by neighbouring properties to the east and west. The proposed development, would introduce a first floor extension to the rear, which would project by 4.7 metres from the existing dwelling and span the length of the rear elevation. The scale of the proposed first floor extension would result in an overshadowing and overbearing impact detrimental to the amenity of the neighbouring dwelling to the east. As such, it is considered that the proposal would not accord with Policy SP 1 (Sustainable Development), criterion 1 and 2 of Policy GN. 1 (General Development Policy) and criteria 1 and 2 of Policy GN.2 (Sustainable Design) of the Local Development Plan for Pembrokeshire (adopted 23rd February 2013).
  3. The proposed development would result in an increase to the overall height of the garage to approximatley 6 m, which appears excessive. The proposal by reason of its design and scale is poor in design terms, in particular the asymmetric roof is visually intrusive and out of keeping with the height of garages in the locality. In this respect, the design and appearance would not be compatible with the character of the site and would fail to achieve a good design that contributes positively to the existing built form. As such, it is considered that the proposal would not accord with Policy SP 1 (Sustainable Development), criterion 1 and 2 of Policy GN. 1 (General Development Policy) and criteria 1 and 2 of Policy GN.2 (Sustainable Design) of the Local Development Plan for Pembrokeshire (adopted 23rd February 2013).
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.