The development shall be carried out in accordance with the following approved plans and documents: 245178-IDL-01-01-DR-A-P2029-S3-P02. Proposed First Floor Plan. 29/05/2025 245178-IDL-01-02-DR-A-P2034-S3-P04. Proposed Roof Plan with Site. 29/05/2025 245178-IDL-01-GF-DR-A-P2028-S3-P03. Proposed Ground Floor Plan. 29/05/2025 245178-IDL-01-XX-DR-A-P3035-S3-P06. Proposed Elevations. 29/05/2025 245178-IDL-01-XX-DR-A-P3036-S3-P05. Proposed Elevations. 29/05/2025 245178-IDL-01-XX-DR-A-P4039-S3-P02. Proposed Building Sections. 29/05/2025 22503EF02 A. Foul Drainage Details. 13/10/25 22503E150 A. Temporary Drainage Layout. 13/10/25 22503E151 A. Temporary SW Drainage Details. 13/06/25 22503EF01 A. Foul Drainage Layout and Details. 13/10/25 22503EF02 A. Foul Drainage Details. 13/10/25 1272.01 Rev C. Soft Landscape Proposals. June 2025 Construction Environmental Management Plan. 28/10/2025 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
This decision notice is not a planning permission; it approves only a non-material amendment to planning permission ref. 25/0662/PA and should be read in conjunction with that permission.
Prior to the substantial completion of the development hereby permitted, the proposed ecological enhancements detailed on the Green Infrastructure Statement and illustrated on 245178-IDL-01-XX-DR-A-P3036-S3-P05. Proposed Elevations. 29/05/2025 and 245178-IDL-01-XX-DR-A-P3035-S3-P06. Proposed Elevations. 29/05/2025 shall be implemented. The biodiversity enhancement measures to include a two bird boxes and two bat boxes, shall be installed as approved and retained for as long as the development exists. Reason: In order to comply with The Environment (Wales) Act 2016 to maintain and enhance biodiversity, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.