Council planning record

Demolition of isolated shed.

Red Brick Shed, Hakin Point, Milford Haven, Pembrokeshire, SA73 3DG

Decision MadeReference: 25/0852/PNPembrokeshire County Council

Last published check: 1 Oct 2026, 15:49. Check the council record for more recent changes.

Application location

Red Brick Shed, Hakin Point, Milford Haven, Pembrokeshire, SA73 3DG

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Pr Notf
Received
15 Dec 2025
Validated
Not published
Determination deadline
12 Feb 2026
Local authority
Pembrokeshire County Council

Application overview

Demolition of isolated shed.

Proposal details

Reference
25/0852/PN
Ward
Milford Hakin
Parish
HT_Milford_Haven
Agent
Mr Meirion Williams
UPRN
MAN000000000609703

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Dispatch date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Unconditionally Approved
Planning conditions
  1. This decision relates only to the plans and documents identified below: • Application for prior notification of proposed demolition, received 23/12/2025 • Heritage Impact Assessment/Statement, received 23/12/2025 • Bat Potential Roosting Feature Assessment by Kite Ecology, March 2024 • Drawing No’s. 9466 E01, LP01. P01 ad PSP01
  2. It is recommended that the applicant be informed that all British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (‘The Habitats Directive’). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations 2017. British bats are also protected under Schedule 5 of the Wildlife and Countryside Act (1981) (as amended). It is recommended that the applicant and contractors be informed of the possibility of encountering bats unexpectedly during works. If bats are encountered on site works should stop immediately an NRW should be contacted (Natural Resources Wales, - General Enquiries: enquiries@naturalresourceswales.gov.uk or 0300 065 3000 Mon-Fri, 8am - 6pm) a licence may then need to be applied for from NRW. Licences are not automatically granted by virtue of a valid planning consent and it may be possible that the necessary licence application may be refused.
  3. Due to the age of the building, there is potential that asbestos containing materials (ACM) will be present within the building. It is the responsibility of owners/developers to ensure safe development particularly if any asbestos is present. The existing building should be assessed for asbestos materials prior to demolition. ACM Footnote: Asbestos cement sheet and textured coating (artex) materials may be removed by non-licensed contractors, but should be done in accordance with the guidance: https://www.hse.gov.uk/pubns/guidance/a14.pdf HSE - Asbestos: Asbestos essentials Most other asbestos materials must be removed by a contractor licensed by the Health and Safety Executive. If at any stage during the refurbishment process asbestos is suspected, the work should stop immediately, and the material should be investigated.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.