Condition 5 - External lighting Condition 5 requires details of proposed external lighting to be submitted for written approval prior to installation. The application submission advises that no external lighting is proposed. Accordingly this information is considered acceptable in that it safeguards the interests of the amenity and appearance of the area and serves to protect the wildlife and the ecological interests of the site in accordance with policies GN.1, GN.2 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) and as such can be treated as fully discharged. This condition will remain fully satisfied for as long as the development exists without external illumination. Should external lighting be proposed during the lifetime of the development, to comply with the requirements of this condition full details of the proposed external lighting shall need to be submitted and approved in writing by the local planning authority prior to installation.
Condition 6 - Surface water disposal Condition 6 requires details of a scheme for the disposal of surface water to be submitted prior to occupation of the approved development. Details are to include results of an assessment of the site potential for disposing of surface water by means of a sustainable drainage system. The following information has been submitted: - 21-0038-SAB Letter of SUDs approval from SAB team dated 19th July 2021; - 21118/MS/SA Maintenance Schedule for soakaways by Roger Casey Associates dated 23rd June 2021. - 21118/MS/FSS Maintenance Schedule for Filter strips and swales by Roger Casey Associates dated 23rd June 2021. - 21118/MS/PP Maintenance Schedule for Permeable Pavements by Roger Casey Associates dated 23rd June 2021. - 21118/MS/A Maintenance Schedule for SuDS Support (ancillary) structures by Roger Casey Associates dated 23rd June 2021. - Dwelling Cellular Soakaway results by Roger Casey Associates dated 23rd June 2021. - Dwelling Swale Soakaway results by Roger Casey Associates dated 23rd June 2021. - Percolation test results by Roger Casey Associates dated 15th June 2021 - 21118/01 Existing topographic survey by Roger Casey Associates dated 23rd June 2021. - 21118/02 Proposed surface water drainage plan by Roger Casey Associates dated 23rd June 2021. - 21118/03 Typical Construction details drainage by Roger Casey Associates dated 23rd June 2021. The information proposes acceptable arrangements for the disposal of surface water associated with the development and that the site is capable of disposing of surface water effectively via the proposed SuDS. This is considered sufficient to ensure that a satisfactory means of drainage would be provided thereby according with Policy GN.1 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013). This condition is partially discharged. It shall be fully satisfied upon completion of the development in accordance with these approved details and their retention as installed for as long as the development exists.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.