Council planning record

Discharge of conditions 6 (colour), 10 (landscaping), 15 (LEMP) and 17 (otter survey) of planning permission 24/0600/PA (Construction of a Battery Energy Storage System (BESS) including Battery Containers and Power Conversion Systems; lighting, security fencing, hard and soft landscaping, drainage, vehicle access/circulation, temporary construction laydown areas, ancillary equipment and other associated infrastructure; and an underground electrical cable connection to the National Grid Substation - Land at Entrance To Pembroke Power Station, Pwllcrochan, Pembroke, SA71 5SS)

Land at Entrance To Pembroke Power Station, Pwllcrochan, Pembroke, SA71 5SS

Decision MadeReference: 25/0542/DCPembrokeshire County Council

Last published check: 4 Oct 2026, 13:01. Check the council record for more recent changes.

Application location

Land at Entrance To Pembroke Power Station, Pwllcrochan, Pembroke, SA71 5SS

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Discharge of Conditions
Received
15 Sept 2025
Validated
Not published
Determination deadline
26 Mar 2026
Local authority
Pembrokeshire County Council

Application overview

Discharge of conditions 6 (colour), 10 (landscaping), 15 (LEMP) and 17 (otter survey) of planning permission 24/0600/PA (Construction of a Battery Energy Storage System (BESS) including Battery Containers and Power Conversion Systems; lighting, security fencing, hard and soft landscaping, drainage, vehicle access/circulation, temporary construction laydown areas, ancillary equipment and other associated infrastructure; and an underground electrical cable connection to the National Grid Substation - Land at Entrance To Pembroke Power Station, Pwllcrochan, Pembroke, SA71 5SS)

Proposal details

Reference
25/0542/DC
Alternative references
PP-14295159
Ward
Hundleton
Agent
Mr Damian Barry RPS Consulting Services
UPRN
MAN000000000606824

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

No documents match this view.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Conditionally Approved
Planning conditions
  1. Condition 6 is partially discharged insofar as the extent of the information: Submission of colour spec, colour scheme plan 0076/A. Condition 10 is partially discharged insofar as the extent of the information: Landscape Strategy 100 Rev M, Arb Impact Assessment V3, Soft Landscape Spec 580, Tree Removal and Protection Plan 712 and 713 Rev D. Condition 15 is partially discharged insofar as the extent of the information: LEMP 30 Jan 2026 Rev M. Condition 17 is partially discharged insofar as the extent of the information: Otter Survey June 2025. These conditions cannot be fully discharged as development shall be undertaken in accordance with the approved details.
  2. This application has been screened in accordance with Natural Resources Wales’ interim advice to Chief Planners dated 25th July 2025.It is considered that this development is unlikely to have a likely significant effect on the Marine SAC as the following criterion applies: No. 1 Any development that does not increase the volume or concentration of wastewater
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.