The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: OS-01, Site location plan, Scale 1:2500, received 09/09/2025 PA-01-A, Block and sections plans, received 28/05/2026 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Prior to the substantial completion of the development hereby approved, the proposed ecological enhancements comprising of one bat box detailed in the Green Infrastructure Statement and detailed on drawing PA-01-A, Block and sections plans, received 28/05/2026, shall be implemented as approved and thereafter retained. Reason: To protect the wildlife and the ecological interests of the site, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The provision of green infrastructure comprising the planting of seven fruit tree and wildflower seed mix detailed in the Green Infrastructure Statement and shown on drawing number PA-01-A, Block and sections plans, received 28/05/2026 shall be carried out in the first planting season following substantial completion or first use of the development hereby approved, whichever is sooner. Any plants or trees which within a period of 5 years following first use of the development hereby approved, die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below • Policies SP 1 (Sustainable Development), GN.1 (General Development Policy), GN.2 (Sustainable Design) and GN.37 (Protection and Enhancement of Biodiversity). It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
The Slurry Lagoon should be designed and built by a suitably qualified engineer to meet the standards set in The Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 (CoAPR). Under CoAPR it is a requirement to notify Natural Resources Wales of new or substantially altered slurry stores at least 14 days before construction begins. Further information on what we require is available on our website at Natural Resources Wales / Silage and slurry storage. Further information is available at Natural Resources Wales / How to use manures and slurries appropriately and the Code of Good Agricultural Practice guidance.
The applicant is advised to follow the Code of Good Agricultural Practice guidance on reducing ammonia emmissions from agricultural in Wales published in 2019 which can be found at https://www.gov.wales/sites/default/files/publications/2019-04/code-of-good-agricultural-practice-guidance-on-reducing-ammonia-emissions.pdf
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.