The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: 3256/1 Existing and Proposed Elevations dated 04/08/2025 3256/2 Location Plan dated 04/08/2025 3256/3 Block Plan dated 04/08/2025 Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Prior to completion of the development hereby approved at least one bird or bat box shall be installed on an elevation positioned away from external lighting and away from the light spill of any window or door. The bat or bird box shall be retained thereafter. Reason: To accord with the duty to maintain and enhance biodiversity and promote ecosystem resilience and to comply with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
The proposed green infrastructure enhancements detailed within the Green Infrastructure Statement shall be maintained in accordance with the approved details. Reason: To maintain and enhance biodiversity, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP 1, GN.1, GN.2 and GN.37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
All British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (‘The Habitats Directive’). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations 2017. British bats are also protected under Schedule 5 of the Wildlife and Countryside Act (1981) (as amended). Therefore, all works must proceed with caution, and should any bats be found, all works should stop, and a competent bat consultant and/ or Natural Resources Wales contacted for advice. It is a criminal offence to intentionally, or recklessly disturb, harm, or kill bats or to destroy a bat 'roost', even if only occasionally used. If bats are encountered on site works should stop immediately an NRW should be contacted (Natural Resources Wales, - General Enquiries: enquiries@naturalresourceswales.gov.uk or 0300 065 3000 Mon-Fri, 8am - 6pm) a licence may then need to be applied for from NRW. Licences are not automatically granted by virtue of a valid planning consent and it may be possible that the necessary licence application may be refused.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.