The development shall begin no later than five years from the date of this decision. Reason: To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 (as amended).
The development shall be carried out in accordance with the following approved plans and documents: [C1035-RPC001 - XX - XX - D - C - 0000 C01. Setting Out. 01/07/24, C1035-RPC001 - XX - XX - D - C - 0001 C01. LV Layout. 01/07/24, C1035-RPC001 - XX - XX - D - C - 0005 C01. Survey Overlay. 01/07/2024, C1035-RPC001 - XX - XX - D - C - 0006 C01. Bay Marking Layout. 01/07/2024, C1035-RPC001 - XX - XX - D - C - 0008 C01. Earthing Drawing. 01/07/24, C1035-RPC001 - XX - XX - D - C - 0004 C01. Feeder Pillar Base. 24/04/24, C1035-RPC001 - XX - XX - D - C - 0002 C01. NS01-MAXI. 24/04/24, C1035-RPC001 - XX - XX - D - C - 0003 C02. Charger Base with AUTEL Maxicharger. 02/05/24, C-SK02. Drainage Standard Details. 25/07/25, C-SK01 C, Engineering Strategy Plan. 04/07/25] Reason: In the interests of amenity and to comply with the requirements of policy GN.1 of the Local Development Plan for Pembrokeshire (Adopted 28th February 2013).
Prior to the substantial completion of the development hereby permitted, the proposed ecological enhancements detailed on the Green Infrastructure Statement. 24/07/25 and illustrated on C-SK01 C, Engineering Strategy Plan. 04/07/25 shall be implemented. The biodiversity enhancement measures to include two bird boxes, shall be installed as approved and retained for as long as the development exists. Reason: In order to comply with The Environment (Wales) Act 2016 to maintain and enhance biodiversity, in accordance with policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
The planting of 2 native hedgerows, with the inclusion of a raingarden as shown on drawing C-SK01 C, Engineering Strategy Plan. 04/07/25 and detailed within the Green Infrastructure Statement shall be carried out in the first planting season following occupation of the development or the completion of the development, whichever is the sooner and any native plants die within a period of 5 years from the date of planting, are removed or become seriously damaged or diseased shall be replaced in the next planting season with another of a similar size and species. Reason: To protect and enhance biodiversity interests and to accord with Policies GN.1 and GN.37 of the Local Development Plan for Pembrokeshire (adopted 28 February 2013).
Having regard to the details of the application proposals, and the relevant provisions of the Local Development Plan for Pembrokeshire (adopted 28 February 2013) as summarised below Policies SP1, SP16, GN1, GN2, GN4, GN,9 and GN37 It is considered that subject to compliance with the conditions attached in this permission, the proposed development would be in accordance with the Development Plan. This informative is intended only to be a summary of the reasons for the granting of planning permission. For further details on the decision, please see the application report under the above reference.
This permission shall not be construed as granting rights to carry out works on, or over, land not within the ownership, or control, of the applicant.
You must obtain the prior written consent of the owner and occupier of any land upon which it is necessary for you to enter in order to construct, externally finish, decorate or in any other way carry out any works in connection with this development including future repairs/maintenance, or to obtain support from adjoining property. This permission does not authorise you to take such action without first obtaining this consent. Your attention is also drawn to the Access of Neighbouring Land Act 1992 and Party Wall Act 1996.
This Decision Notice grants planning permission. You are advised that it does not constitute approval under the Building Regulations.
Any external lighting must be low level, downward facing, hooded and on a short PIR activated timery.
From 7th January 2019, all new developments of more than 1 property or where the construction area that has drainage implications is 100 square meters or more, will require sustainable drainage systems (SuDS) for surface water. The SuDS must be designed and built in accordance with Statutory SuDS Standards published by the Welsh Ministers and SuDS Schemes must be approved by the local authority acting in its SuDS Approving Body (SAB) role, before construction work begins. Pembrokeshire County Council as SuDS Approving Body (SAB) considers that by virtue of the fact that the construction area having drainage implications appears to be in excess of 100 square metres, the proposed works will require SAB approval prior to the commencement of any works on site relating to this application. The applicant can obtain further information in relation to the SAB approval process from the Authorities website at www.pembrokeshire.gov.uk/planning-contacts/sustainable-drainage-approving-body-sab Please contact: SAB Community Services Directorate Infrastructure Division Pembrokeshire County Council County Hall Haverfordwest Pembrokeshire SA61 1TP e-mail: sab@pembrokeshire.gov.uk The SAB team can be contacted by telephone as follows: 01437 776147.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.