The works herby permitted shall be begun before the expiration of the five years from the date of this consent. Reason: as required by Section 98 of the Historic Environment (Wales) Act 2023.
The works hereby permitted shall be carried out, and thereafter retained, strictly in accordance with the deposited plans and documents: - • S01- Site and Location Plan - 28/07/2026 • S02 - Existing Floor Plan - 28/07/2026 • S03 - Existing Elevations - 28/07/2026 • LB-301-01 - Floor Plan - 28/07/2026 • LB-310-02A - Proposed Elevations - 28/07/2026 • Double Casement Rev A - 28/07/2026 • Double Doors Rev A - 28/07/2026 • Triple Casement - 28/07/2026 • Single Casement - 28/07/2026 • Single Door Option A - 28/07/2026 • Schedule of materials and finishes - 28/07/2026 • Bat Report - 28/07/2026 • Heritage Impact Statement - 28/07/2026 Reason: as required by Section 90(2) of the Historic Environment (Wales) Act 2023. To ensure the development is carried out in accordance with the approved drawings, for the avoidance of doubt.
All external lighting in connection with the proposed development shall be positioned at low level, hooded, and downward facing, with a light temperature below 2700k and be operated on a PIR activated timer for the lifespan of the development. Reason: To ensure that nocturnal animal species and habitats are adequately protected, and to protect and enhance the character and appearance of the site and its setting within the Pembrokeshire Coast National Park and to accord with policy: Local Development Plan 2 – Policies 1 (National Park Purposes and Duty), 8 (Special Qualities), 10 (sites and species of European importance), 11 (Nationally protected sites and species) and 14 (Conservation of the Pembrokeshire Coast National Park). Section 6 of PPW edition 12.
Prior to the first use or substantial completion of the development hereby approved a bat box must be installed according to the advice given in the bat report and this response. Bat boxes must be made of woodcrete or woodstone. Reason: To ensure that animal and plant species and habitats are adequately protected, and to protect and enhance the character and appearance of the site and its setting within the Pembrokeshire Coast National Park and to accord with policy: Local Development Plan 2 – Policies 1 (National Park Purposes and Duty), 8 (Special Qualities), 10 (sites and species of European importance), 11 (Nationally protected sites and species) and 14 (Conservation of the Pembrokeshire Coast National Park). Section 6 of PPW edition 12.
NRW Advisory: It is recommended that the applicant be informed that all British bat species are European Protected Species by virtue of their listing under Annex IV of EC Directive 92/43/EEC (‘The Habitats Directive’). This Directive has been transposed into British Law under the Conservation of Habitats and Species Regulations 2017. British bats are also protected under Schedule 5 of the Wildlife and Countryside Act (1981) (as amended). It is a criminal offence to intentionally, or recklessly disturb, harm, or kill bats or to destroy a bat 'roost', even if only occasionally used. If bats are encountered on site works should stop immediately and NRW should be contacted (Natural Resources Wales, - General Enquiries: enquiries@naturalresourceswales.gov.uk or 0300 065 3000 Mon-Fri, 8am - 6pm) a licence may then need to be applied for from NRW. Licences are not automatically granted by virtue of a valid planning consent, and it may be possible that the necessary licence application may be refused.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.