England · National park authority

Peak District National Park Authority
Planning applications.

Explore collected planning applications and decisions for Peak District National Park Authority. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
23,502Searchable applications
22Recorded as pending
84%Approval rate · 14,787 approved or refused records
2,310Refused applications

12,477 approved · 2,310 refused · 2,216 withdrawn. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

We haven’t verified direct planning guidance links for this authority yet. Use its official website in Council sources.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas131 mapped area records
Article 4 direction areas26 mapped area records0 identified HMO area records; remaining records unclassified

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decided: GRANTED CONDITIONALLYNP/DDD/0921/1054

    Proposed single storey side extension.

    42 Park Road Bakewell

    Received Not published
  2. Withdrawn: WITHDRAWN DECISIONNP/DDD/0921/1055

    Section 73 application for the variation of condition 2 on NP/DDD/0616/0654

    Unit 12 Rock Mill Business Park The Dale Stoney Middleton

    Received Not published
  3. Decided: GRANTED CONDITIONALLYNP/SM/0921/1056

    Change of use of agricultural building to house biomass heating system and associated flue.

    Summerhill Summerhill Lane Flash

    Received Not published
  4. Decided: WITHDRAWNNP/TPO/0921/1057

    T1 Ash. Fell to ground level. Tree has Ash dieback

    Grove Cottage Weags Bridge Road Grindon

    Received Not published
  5. Decided: ACCEPTNP/TPO/0921/1058

    T1 conifer fell. shading the garden and killing the lawn T2, T3, T4 conifers. Reduce height by 30% over shading property

    The Old Coach House Weags Bridge Road Grindon

    Received Not published
  6. Decided: ACCEPTNP/TPO/0921/1059

    T1 - Aider - crown reduce by 2-3m. G1 - Aider + Cherry - reduce to create more uniform shape and reduce spread/nuisance to neighbours. Pruning to British standard and maintaining the trees natural shape. Remove 2 smaller suppressed trees to favour mature trees.

    36 The Village Holme Holmfirth

    Received Not published
  7. Decided: ACCEPT CONDITIONALLYNP/HPK/1021/1060

    Advertisement consent - Installation of 14 new panels and interventions to replace existing

    SK173892 Land off Derwent Lane Upper Derwent Valley

    Received Not published
  8. Decided: GRANTED CONDITIONALLYNP/SM/1021/1061

    Listed Building consent - Repair, reinstatement and restraint to the east gable of the Hall, to include isolated use of structural members in the form of reinforcement/ battens/ straps and bracketry. Works partially commenced in June 2020 with the replacement of oak lintels above first floor window, following full collapse.

    Alstonefield Hall Church Street Alstonefield

    Received Not published
  9. Decided: GRANTED CONDITIONALLYNP/HPK/1021/1152

    Replace external wooden garage door (210cm wide x 194cm high) with with aluminium framed bi-fold glass doors comprised of three identical sections.

    Keepers Lodge Aston Lane Hope

    Received Not published
  10. Decided: GRANTED CONDITIONALLYNP/DDD/1021/1153

    Proposed replacement building for purposes incidental to a dwelling.

    Woodland View John Bank Lane Ashford In The Water

    Received Not published
  11. Decided: ACCEPTNP/TPO/1021/1154

    Fell to ground level Ash tree with ADD and large stress fracture in lower limb. Also fell to ground level Sycamore tree that is intertwined with the Ash tree.

    Hall Farm Main Road Wardlow SK17 8RP

    Received Not published
  12. Decided: ACCEPTNP/TPO/1021/1155

    T1 Crown raise one branch and two deadwood branches off beech tree over foundation T2 Crown lift sycamore take off bottom three branches over the drive and grass T3 30% crown reduction beech tree on boundary T4 Remove large leaning limb from beech tree over hanging pond T5Remove sycamore tree next to the lodge building to a low stump T6 Remove two branches off sycamore over pond T7 Fell horse chestnut due to rot at the base of the tree. T8 Fell horse chestnut due to rot at the base of the tree.

    Moorfield House, Moorfield, Glossop, SK13 7PP

    Received Not published
  13. Decided: GRANTED CONDITIONALLYNP/HPK/1021/1158

    Redevelopment of brownfield site to provide two new open market dwellings.

    Land at Brough Brough

    Received Not published
  14. Decided: AMENDMENTS ACCEPTEDNP/NMA/1021/1159

    Non Material Amendment - Variation of condition 7 on NP/DDD/0619/0658 to allow the historic buildings recording to be carried out in phases.

    Ashford Hall Baslow Road Ashford In The Water

    Received Not published
  15. Decided: AMENDMENTS ACCEPTEDNP/NMA/1021/1160

    Non Material Amendment - variation of condition 7 on NP/DDD/0619/0659 to allow the historic buildings recording to be carried out in phases.

    Ashford Hall Baslow Road Ashford In The Water

    Received Not published
  16. Decided: ACCEPTNP/TPO/1021/1161

    T1 is a silver birch growing next to the property. The branches are now touching the properties wall ass well as the roof. I am requesting that we do a crown lift to take the lower branches away from the building and then prune a 5 meter clearance away from the roof. T2 is a walnut which is planted next to the boundary wall and overhanging the neighbouring garden. I am requesting to remove the two branches highlighted to prevent damage to the wall and help appease the neighbours who are starting to complain about it taking over their garden. T3 is a silver birch that has been planted too close to both the boundary wall and the neighbouring walnut. I am requesting to remove it fully to make more room for the walnut to develop.

    2 South View, Pilsley, Bakewell, DE45 1UG

    Received Not published
  17. Decided: GRANTED CONDITIONALLYNP/DDD/1021/1162

    S.73 for the removal or variation of condition 2 on NP/DDD/1219/1344

    Rock Mill Business Park Unit 12 The Dale Stoney Middleton

    Received Not published
  18. Decided: GRANTED CONDITIONALLYNP/HPK/1021/1164

    Conversion of part of the garage to living acommodation, for a one bedroom holiday let. Installation of new glazing and doors into existing openings (one opening relocated to aid structural integrety of the building).

    The Barn Shatton Lane Bamford

    Received Not published
  19. Decided: CONDITION/S PARTLY DISCHARGEDNP/DIS/1021/1166

    Discharge of condition 3 (A) on NP/S/0120/0078

    Thornseat Delf Nr. Low Bradfield

    Received Not published
  20. Decided: GRANTED CONDITIONALLYNP/DDD/1021/1167

    Removal and replacement of 3no antennas and associated ancillary works thereto.

    Telecommunications Site 63680/DED003 Slade Hill Farm Off Slipperlow Lane Taddington

    Received Not published
  21. Withdrawn: WITHDRAWN DECISIONNP/DDD/1021/1168

    Seeking listed building consent to provide temporary scaffolding to support the full front elevation, as we are advised the front wall is unstable and we need to prevent collapse pending the full repair which will be a separate application.

    2 Bridge Street Bakewell

    Received Not published
  22. Decided: REFUSEDNP/SM/1021/1169

    Erection of an agricultural processing building designed to house the machinery which is used to process straw and other products in conjunction with the applicants animal bedding business.

    Yew Tree Farm Royal Oak Road Wetton

    Received Not published
  23. Decided: CONDITION/S PARTLY DISCHARGEDNP/DIS/1021/1170

    Discharge of Conditions 10, 11, 12, 13, 15 and 16 on NP/DDD/0120/0101

    Barn opposite Ore House Winster

    Received Not published
  24. Decided: GRANTED CONDITIONALLYNP/DDD/1021/1171

    Retrospective planning application for the change of use from agriculture to class E.

    West Hills Farm Buckdale Lane Winster

    Received Not published

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Peak District National Park Authority

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Peak District National Park Authority, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage