Planning application seeking full planning permission for: • The dualling of approximately 3.2km of the A40 carriageway from the existing Hill Farm junction at Witney to the Eynsham Park and Ride site (R3.0057/19) including the construction of two new roundabouts. • An eastbound and westbound bus lane approximately 6.5km in length from the Eynsham Park and Ride site to existing structures at Duke’s Cut waterway (Duke’s Cut Canal Bridge, Earl’s Culvert, Wolvercote Railway Bridge and Wolvercote Canal Bridge); • Capacity and connectivity improvements over the existing structures at Duke’s Cut waterway to enable the proposed eastbound bus lane to extend over the existing structures up to the A34 flyover in the east, forming a connection into Oxford North (Northern Gateway) strategic development site; • Construction of a new signalised junction to the Eynsham Park and Ride site; • New pedestrian/cyclist underpass at Cuckoo Lane (‘the Eynsham Underpass’). Two new pedestrian/cycle bridges at Cassington Halt (Cassington Halt Footbridge North and Cassington Halt Footbridge South); • Widening of Cassington New Bridge; • Demolition and replacement/extension of existing White House Culvert; • Demolition and replacement/extension of Barnard Gate New Culvert; • New and improved shared use footways and cycleways, including new shared use links to National Cycle Network (NCN) Route 5 at Duke’s Cut waterway; • Alterations to existing junctions and property accesses along the A40; • Controlled crossings, external lighting, noise barriers, sustainable drainage systems, landscaping, habitat creation including ecology ponds and associated hibernacula; and • All associated engineering and temporary construction works, site compound and storage areas
A40 HIF2 Smart Corridor (‘HIF2 project’) A40 corridor between Witney and Wolvercote, Oxfordshire
Planning application seeking full planning permission for: • The dualling of approximately 3.2km of the A40 carriageway from the existing Hill Farm junction at Witney to the Eynsham Park and Ride site (R3.0057/19) including the construction of two new roundabouts. • An eastbound and westbound bus lane approximately 6.5km in length from the Eynsham Park and Ride site to existing structures at Duke’s Cut waterway (Duke’s Cut Canal Bridge, Earl’s Culvert, Wolvercote Railway Bridge and Wolvercote Canal Bridge); • Capacity and connectivity improvements over the existing structures at Duke’s Cut waterway to enable the proposed eastbound bus lane to extend over the existing structures up to the A34 flyover in the east, forming a connection into Oxford North (Northern Gateway) strategic development site; • Construction of a new signalised junction to the Eynsham Park and Ride site; • New pedestrian/cyclist underpass at Cuckoo Lane (‘the Eynsham Underpass’). Two new pedestrian/cycle bridges at Cassington Halt (Cassington Halt Footbridge North and Cassington Halt Footbridge South); • Widening of Cassington New Bridge; • Demolition and replacement/extension of existing White House Culvert; • Demolition and replacement/extension of Barnard Gate New Culvert; • New and improved shared use footways and cycleways, including new shared use links to National Cycle Network (NCN) Route 5 at Duke’s Cut waterway; • Alterations to existing junctions and property accesses along the A40; • Controlled crossings, external lighting, noise barriers, sustainable drainage systems, landscaping, habitat creation including ecology ponds and associated hibernacula; and • All associated engineering and temporary construction works, site compound and storage areas
Reference
R3.0151/21
Agent
Annie Taylor
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.