S73 application to continue the development permitted by R3.0148/22 (new grade separated dumbbell junction, an off-slip to allow northbound traffic to exit on the A34 and an on-slip to allow southbound traffic to enter the A34, sustainable drainage measures, revised access, balancing ponds, lighting columns, planting / landscaping, provision of shared footway and cycleway, vehicle restraint system, bus layby extension, fencing, signalised and unsignalised crossing for active travel users and associated infrastructure works) without complying to condition 1 to reduce the length of the southbound merge slip road and a private access road, refine the northern pond layout and access arrangement, and increase the height of the bridge parapet by 300-400mm.
A34 and A4183 Lodge Hill Interchange, north of Abingdon
S73 application to continue the development permitted by R3.0148/22 (new grade separated dumbbell junction, an off-slip to allow northbound traffic to exit on the A34 and an on-slip to allow southbound traffic to enter the A34, sustainable drainage measures, revised access, balancing ponds, lighting columns, planting / landscaping, provision of shared footway and cycleway, vehicle restraint system, bus layby extension, fencing, signalised and unsignalised crossing for active travel users and associated infrastructure works) without complying to condition 1 to reduce the length of the southbound merge slip road and a private access road, refine the northern pond layout and access arrangement, and increase the height of the bridge parapet by 300-400mm.
Reference
R3.0076/26
Agent
Sharaz Arif
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.