Council planning record

Section 73 application to continue the development permitted by planning permission R3.0001/22 (District Council reference: 22/00146/OCC) (Highways accessibility and public realm improvement works to the forecourt, car park, roads and junctions around Banbury Rail Station comprising: Extending the northern end of Tramway Road to provide a connection to Station Approach Road via a compact roundabout; Providing a pedestrian, cycle, bus and taxi only connection between the station forecourt and Tramway Road; Providing a new footway and cycleway from Tramway Road to the station forecourt that includes pedestrian crossings; Prohibiting general vehicular access to the station surface car park and eastern end of Station Approach from Bridge Street; Providing a new vehicle access to the station surface car park from Station Approach Road via Tramway Road; Providing relocated and new vehicle accesses to adjacent commercial buildings and depot off Tramway Road and Station Approach Road; Re-configuration of car parking, including drop off bays at Banbury Rail Station with new service area to the east of the station building; Providing an additional passenger drop off and collection facility on Tramway Road; Providing new bus stops and cycle shelters including cycle ramp access at the station forecourt; Providing new and improved lighting of the station forecourt and the connection between Tramway Road and the station; and New landscaping and associated works) without complying conditions 1 (to amend approved drawings),condition 7 (to amend surface water drainage) and condition 8 (to amend surfacing)

Tramway Road, Station Approach Road, Windsor Street and Bridge Street, Banbury

Application DecidedReference: R3.0058/24Oxfordshire County Council

Last published check: 14 Sept 2026, 20:48. Check the council record for more recent changes.

Application location

Tramway Road, Station Approach Road, Windsor Street and Bridge Street, Banbury

This record has no verified map location.

Application summary

Status
Application Decided
Application type
Section 73
Received
Not published
Validated
22 May 2024
Determination deadline
Not published
Local authority
Oxfordshire County Council

Application overview

Section 73 application to continue the development permitted by planning permission R3.0001/22 (District Council reference: 22/00146/OCC) (Highways accessibility and public realm improvement works to the forecourt, car park, roads and junctions around Banbury Rail Station comprising: Extending the northern end of Tramway Road to provide a connection to Station Approach Road via a compact roundabout; Providing a pedestrian, cycle, bus and taxi only connection between the station forecourt and Tramway Road; Providing a new footway and cycleway from Tramway Road to the station forecourt that includes pedestrian crossings; Prohibiting general vehicular access to the station surface car park and eastern end of Station Approach from Bridge Street; Providing a new vehicle access to the station surface car park from Station Approach Road via Tramway Road; Providing relocated and new vehicle accesses to adjacent commercial buildings and depot off Tramway Road and Station Approach Road; Re-configuration of car parking, including drop off bays at Banbury Rail Station with new service area to the east of the station building; Providing an additional passenger drop off and collection facility on Tramway Road; Providing new bus stops and cycle shelters including cycle ramp access at the station forecourt; Providing new and improved lighting of the station forecourt and the connection between Tramway Road and the station; and New landscaping and associated works) without complying conditions 1 (to amend approved drawings),condition 7 (to amend surface water drainage) and condition 8 (to amend surfacing)

Proposal details

Reference
R3.0058/24
Agent
Mr Bal Tiwana

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 120 of 120

DocumentPublishedAction
Additional Information - Biodiversity Net Gain Assessment Report 17th Sept 24Application Documents20 Sept 2024View
Additional Information - BNG Metric 17thsept24Application Documents20 Sept 2024View
Consultation Response - OCC Ecology September 2024Application Documents26 Sept 2024View
Delegated ReportApplication Documents12 Sept 2025View
Approved Applicationform Updated 22.5.24Application Documents22 May 2024View
Approved 201950-MIL-HGN-ZZ-RP-CH-0010 D04 - Construction Traffic Management Plan.pdfApplication Documents23 Oct 2024View
Approved P6658_Tramway_WSI_031024 Final.pdfApplication Documents23 Oct 2024View
Approved 201950-MIL-HGN-ZZ-DR-CH-0022-P01 Vehicle Tracking HGV(1).pdfApplication Documents23 Oct 2024View
Comment Environmental Health Officer Cherwell District Council 18/06/2024Application Documents18 Jun 2024View
Comment Kevin Cox Thames Valley Police 24/06/2024Application Documents24 Jun 2024View
R3.0058.24 Tramway Banbury Landscape 210624Application Documents27 Jun 2024View
Comments From Occ Archaeologist R3.005824 09.07.24Application Documents10 Jul 2024View
Comments Network Rail 09.06.24 R3005824 Tramway RoadApplication Documents10 Jul 2024View
Comments From Rights Of Way R3005824 Tramway Rd 09.07.24 (25.06.24(1))Application Documents10 Jul 2024View
Local Lead Flood Authority 10.07.24 R3005824 Tramway Rd Improvements Project S73 10.07.24Application Documents10 Jul 2024View
Comments Transport Dc R3005824 10.07.24Application Documents10 Jul 2024View
Comments Cherwell Dc R3005824 15.07.24Application Documents16 Jul 2024View
Comments Historic England R3005824Application Documents16 Jul 2024View
Comments Natural England R005824 190724Application Documents19 Jul 2024View
Updated Comments Landscape R3.0058.24 Tramway Banbury 180724Application Documents19 Jul 2024View
Comments Environment Agency R3005824 18.07.24Application Documents19 Jul 2024View
Comments Llfa Team Tramway Road R3.0058.24 01.08.24Application Documents21 Aug 2024View
Tramway Road Biodiversity Response R3.005824 01.08.24Application Documents21 Aug 2024View
Decision Notice R3.0001/22Application Documents29 May 2024View
Decision Notice R3.0001/22Application Documents22 Oct 2024View
Decision Notice R3005824 (2)Application Documents24 Oct 2024View
Addendum To Surface Water Drainage Strategy 201950 Mil Hgn Zz Rp Ch 0551 D03Application Documents22 May 2024View
Approved P02 Utilities Statement 201950 Mil Hgn Zz Rp Ch 2600Application Documents22 May 2024View
Supporting Document Landscaping detailsApplication Documents22 May 2024View
Layout Plan Proposed Included In Block Plan Of The SiteApplication Documents22 May 2024View
Approved Occ S73 Soc 240424 V02 Statement Of ConformityApplication Documents22 May 2024View
Approved Occ Tsa 030524 V02.2Application Documents22 May 2024View
S73 Tramway Road Consultation Checklist May 2024v2Application Documents22 May 2024View
S73 Tramway Road Covering LetterApplication Documents22 May 2024View
The Location Plan Included In Block Plan Of The SiteApplication Documents22 May 2024View
Approved Tramway Road Das Addendum 18.04.24Application Documents22 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Ol 00002 S3 P01 Tva FinalApplication Documents29 May 2024View
Approved under R3.0001/22 Arboricultural Impact Assessment Ref V19865sbApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp On 00002 S3 P01.1 Noise Assessment FinalApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Os 00001 S3 P01 Sa FinalApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Ot 00001 S3 P01.1 Transport StatmentApplication Documents29 May 2024View
Approved under R3.0001/22 5080987 Mil Hlg Or Dr Eo 1301 P02 Preliminary Lighting LayoutApplication Documents29 May 2024View
Approved under R3.0001/22 Access To Banbury Station Highways Improvement Scheme Street Lighting Design Strategy 02Application Documents29 May 2024View
Approved under R3.0001/22 Tramway Design And Access StatementApplication Documents29 May 2024View
Approved under R3.0001/22 Tramway Planning Statement V2(1)Application Documents29 May 2024View
Approved under R3.0001/22 Tramway Road Covering Letter(1)Application Documents29 May 2024View
Approved under R3.0001/22 Tramway Statement Of Community Involvement V2Application Documents29 May 2024View
Approved under R3.0001/22 Surface Water Drainage StrategyApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Ow 00003 S3 P02.1Application Documents29 May 2024View
Approved under R3.0001/22 Occ Tramway Road Doc 9 Noise Monitoring Survey Cover Letter FinalApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Rp Ch 0010 D02 Construction Traffic Management PlanApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Ska Hgn Zz Rp Ch 2600 P01 Utilities Statement (including Appendices)Application Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Oa 00001 S3 P01.1 Air Quality Report FinalApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Oe 00001 S3 P02 Pea FinalApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Rp Oh 00001 S0 P01.04 Heritage Report FinalApplication Documents29 May 2024View
2024 08 01 Response To S73 Llfa CommentsApplication Documents21 Aug 2024View
Approved 201950 Mil Hgn Zz Rp Ch 0551 D04 Addendum To Surface Water Drainage StrategyApplication Documents21 Aug 2024View
Approved 201950 Mil Hgn Zz Rp Ch 0550 P04 Drainage StrategyApplication Documents23 Oct 2024View
Approved Occ Tramway Noise Monitoring Methodology 070723Application Documents23 Oct 2024View
201950 Mil Hgn Zz Dr Ch 0022 D02 Spa Tramway Rd To Sas Articulated Vehicle(1)Application Documents24 Oct 2024View
Signed S73 Tramway Road Annex 4 Eia Screening Form May 2024v2Application Documents22 May 2024View
Signed S73 Tramway Road Annex 5 Departure Form May 2024Application Documents22 May 2024View
Approved under R3.0001/22 ApplicationformApplication Documents29 May 2024View
Approved under R3.0001/22 Applicationform(1)Application Documents29 May 2024View
Approved under R3.0001/22 Applicationform(2)Application Documents29 May 2024View
EIA FormApplication Documents29 May 2024View
Departure FormApplication Documents29 May 2024View
R3 Agent LetterApplication Documents29 May 2024View
R3 Agent Approval LetterApplication Documents22 Oct 2024View
Approved Drainage Layout Sheet 3 201950 Mil Hgn Zz Dr Ch 0503 D03Application Documents22 May 2024View
Approved Drainage Layout Sheet 2 201950 Mil Hgn Zz Dr Ch 0502 D03Application Documents22 May 2024View
Approved Drainage Layout Sheet 4 201950 Mil Hgn Zz Dr Ch 0504 D03Application Documents22 May 2024View
Approved Tramway Road Lightning Layout 5081131 Mil Hlg Or Dr Eo 1301 P04Application Documents22 May 2024View
Approved Tri Wsp 00 Xx Dr L 3001 P05Application Documents22 May 2024View
Tri Wsp 00 Xx Dr L 3002 P05Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0019 Indicative SectionsApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0020 Hard Soft Landscaping PlanApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0040 D01 Long Sections San Sheet 1of2Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0041 D01 Long Sections San Sheet 2of2Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0042 D01 Long Sections SasApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0043 D01 Long Sections TmwApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0044 D01 Long Sections Rb SrApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0050 D01 Cross Sections San Sheet 1of3Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0051 D01 Cross Sections San Sheet 2of3Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0052 D01 Cross Sections San Sheet 3of3Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0053 D01 Cross Sections SasApplication Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0054 D01 Cross Sections Tmw Sheet 1of2Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0055 D01 Cross Sections Tmw Sheet 2of2Application Documents22 May 2024View
Approved 201950 Mil Hgn S73 Dr Ch 0056 D01 Cross Sections Rb SrApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0003 D03 Ga Tramway Rd ImprovementsApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0020 D02 Spa Station Approach North Enviro 300 BusApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0021 D02 Spa Multiple Areas Bus Refuse VehicleApplication Documents22 May 2024View
201950 Mil Hgn Zz Dr Ch 0022 D02 Spa Tramway Rd To Sas Articulated VehicleApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0023 D02 Spa Tilstone Accesses Articulated VehicleApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0024 D02 Spa Nwr Access Articulated VehicleApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0025 D02 Spa San Bend Bus Refuse VehicleApplication Documents22 May 2024View
Approved 201950 Mil Hgn Zz Dr Ch 0501 D03 Drainage Layout Sheet 1Application Documents22 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0001 P02 Location PlanApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0002 P01 Existing Site LayoutApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0003 P02 Ga Tramway Rd ImprovementsApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Egn Zz Rp La 0001 D02 Dust Management Plan FinalApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0008 P01 Long Section San Sheet 1 Of 2Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0009 P01 Long Section San Sheet 2 Of 2Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0010 P01 Long Sections SasApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0011 P01 Long Section TmwApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0012 P01 Cross Section San Sheet 1 Of 3Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0013 P01 Cross Section San Sheet 2 Of 3Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0014 P01 Cross Section San Sheet 3 Of 3Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0015 P01 Cross Section SasApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0016 P01 Cross Section Tmw Sheet 1 Of 2Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0017 P01 Cross Section Tmw Sheet 2 Of 2Application Documents29 May 2024View
v 201950 Mil Hgn Zz Dr Ch 0019 P01 Indicative SectionsApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0020 P01 Vehicle Tracking San Enviro 300Application Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0021 P01 Vehicle Tracking Coach And Refuse VehicleApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0022 P01 Vehicle Tracking HgvApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0023 P01 Vehicle Tracking TilstoneApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0501 P02 Proposed Drainage DesignApplication Documents29 May 2024View
Approved under R3.0001/22 201950 Mil Hgn Zz Dr Ch 0502 P02 Proposed Drainage DesignApplication Documents29 May 2024View
Approved under R3.0001/22 806433 Wood Xx Xx Fg Oe 00006 S3 P01 Hard And Soft Landscape PlanApplication Documents29 May 2024View
Approved 201950 Mil Egn Zz Rp La 0001 D02 Dust Management Plan Final(1)Application Documents23 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source

Decision & conditions

Approved
Decision Notice R3.0001/22 Decision Notice R3.0001/22 Decision Notice R3005824 (2)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.