ApprovedCouncil status: Application Decided

Details pursuant to Condition 17 Details of Sustainable Drainage Systems in the A4130 widening and the Didcot Science Bridge Sections of the development (partial discharge) of: a. planning permission no. R3.0138/21, and separately b. planning permission no. R3.0025/26 (a s73 permission approved on 06/08/2026, being after the date this application was validated).

A linear site comprising a corridor between the A34 Milton Interchange and the B4015 north of Clifton Hampden including part of the A4130 east of the A34 Milton Interchange, land between Didcot and the former Didcot A Power Station and the Great Western Mainline, land to the north of Didcot where it crosses a private railway sidings and the River Thames to the west of Appleford-on-Thames before joining the A415 west of Culham Station, land to the south of Culham Science Centre through to a connection with the B4015 north of Clifton Hampden

Oxfordshire County CouncilReference R3.0041/26Details Pursuant

Last published check: 14 Nov 2026, 04:35. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 14 Nov 2026, 04:35 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated16 Mar 2026
  3. ClosedConsultationEnded 14 Apr 2026
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApproved2 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision date

    Published milestoneCouncil source
  4. Determination Date

    Published milestoneCouncil source
Application type
Details Pursuant
Documents
120 published

Proposal

Details pursuant to Condition 17 Details of Sustainable Drainage Systems in the A4130 widening and the Didcot Science Bridge Sections of the development (partial discharge) of: a. planning permission no. R3.0138/21, and separately b. planning permission no. R3.0025/26 (a s73 permission approved on 06/08/2026, being after the date this application was validated).

Reference
R3.0041/26
Agent
Emily Pugh

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Didcot Science Bridge Detailed Design Drainage Maintenance Plan Ref 60730614 Acm 00 All Rp D 05004 Rev P02 dated 06/02/26Application Documents27 Mar 2026View
  • Approved Email Information From Paul Swannel 26.06.26Application Documents14 Sept 2026View
  • Approved Hewrat Update Report 2Application Documents14 Sept 2026View
  • Approved Preliminary Sources Study Report A4130 Widening Part 1Application Documents14 Sept 2026View
  • Approved Hewrat Update Report 1Application Documents14 Sept 2026View
  • Approved Preliminary Sources Study Report A4130 Widening Part 2Application Documents14 Sept 2026View
  • Approved Preliminary Sources Study Report A4130 Widening Part 3Application Documents14 Sept 2026View
  • Approved Preliminary Sources Study Report A4130 Widening Part 4Application Documents14 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Decision Notice For R3.0138/21
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.