Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land of Southam Road, Banbury, OX16 1ST
Last published check: 22 Sept 2026, 01:38. Check the council record for more recent changes.
Land of Southam Road, Banbury, OX16 1ST
This record has no verified map location.
Full permission for the development of a new 1FE primary school including nursery and SEN provision with details of vehicle access, hard and soft landscaping, car parking, cycle and scooter parking, external play areas, external lighting and boundary treatments
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Approved under condition 9-Email from Alistair Kelly dated 8th JuneApplication Documents | 21 Jul 2020 | View |
| Approved under condition 9-DP agent approval letterApplication Documents | 21 Jul 2020 | View |
| Superseded plan NMA R3.0038/20-Site Sections Plan Drawing Number 0004 Revision P01 dated 24th September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Planting Plan Drawing Number 0011 Revision P01 dated 1st May 2019Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Landscape Illustrative Masterplan Drawing Number 0001 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Fencing General Arrangement Drawing Number 0003 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-BB013 Areas Plan Drawing Number 0007 Revision P01 dated 21st September 2019Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Site Section Drawing Number 0004 Revision P06 dated 14.02.2020Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Planting Plan Drawing Number 0011 Revision P04 dated 14.02.2020.Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Fencing General Arrangement Drawing Number 0003 Revision P08 dated 14.02.2020Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Covering letter from Alistair Kelly dated 18th March 2020Application Documents | 9 Jun 2020 | View |
| Approved under condition 4-Lighting Plan drawing number D36175 AE C prepared by Kingfisher Lighting dated 07.02.2020;Application Documents | 13 May 2020 | View |
| Approved under condition 4-Letter from Alistair Kelly at DPP Planning dated 03.03.2020Application Documents | 13 May 2020 | View |
| Approved under condition 10-Electric Vehicles Charging Point Allowances Report Reference 152265 by RPS dated November 2019Application Documents | 10 Mar 2020 | View |
| Approved under condition 10-Application Form dated 13.12.2019Application Documents | 10 Mar 2020 | View |
| Condition 7 - Approved Proposed External Elevations Plan - Drawing No. 02001 P44Application Documents | 10 Dec 2019 | View |
| Condition 8 - Approval Agents Letter R3.0103/19Application Documents | 13 Nov 2019 | View |
| Approved under R3.0089/19- Remediation Strategy Revision V01 dated 30 08 2019Application Documents | 17 Oct 2019 | View |
| Agent approval letter R3.0089/19Application Documents | 17 Oct 2019 | View |
| Approved under condition 15- Drainage Layout Drawing Number 500 Revision P6 dated 03.10.2018Application Documents | 10 Oct 2019 | View |
| Approved under condition 15- Appendix 3G Ares Finished LevelsApplication Documents | 10 Oct 2019 | View |
| Approved under condition 11-DP agent approval letterApplication Documents | 8 Oct 2019 | View |
| Section 106Application Documents | 25 Jul 2019 | View |
| Approved Underground Utilities Survey Drawing Reference 1815_SR_U(AO-L2) dated 26th August 2018Application Documents | 25 Jul 2019 | View |
| Approved Sustainable Drainage Statement BWB ReferenceLDS-2473-SDS Revision P02 dated March 2019Application Documents | 25 Jul 2019 | View |
| Approved Site Sections Plan Drawing Number152265-ALA-00-XX-DR-L-0004 Revision P01 dated 24th September 2018Application Documents | 25 Jul 2019 | View |
| Approved Proposed Elevation Strategy Drawing Number 02002 Revision P43 dated 4th July 2019;Application Documents | 25 Jul 2019 | View |
| Approved Planting Plan Drawing Number152265 – ALA-00-XX-DR-L-0011 Revision P01 dated 1st May 2019Application Documents | 25 Jul 2019 | View |
| Approved Phase 2 Site Investigation CUR-00-XX-RP-GE-00003 Revision V02 dated 21st November 2018Application Documents | 25 Jul 2019 | View |
| Approved Noise Impact Assessment 0042335 Revision 01 dated 4th February 2019Application Documents | 25 Jul 2019 | View |
| Approved Landscape Maintenance Plan Document Number ALA490PB01 Revision P01 dated 13th May 2019Application Documents | 25 Jul 2019 | View |
| Approved Landscape General Arrangement Drawing Number 152265-ALA-00-XX-DR-L-0002 Revision P02 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Flood Risk Assessment Reference 070026-CUR-00-XX-RP-C-001 Revision 02 dated 6th February 2019Application Documents | 25 Jul 2019 | View |
| Approved Fencing General Arrangement Drawing Number 152265-ALA-00-XX-DR-L-0003 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Existing Services & Utility Search report dated 8th August 2018 Reference BRM08669ISR1Application Documents | 25 Jul 2019 | View |
| Approved Design Criteria for Storm dated 1st May 2019Application Documents | 25 Jul 2019 | View |
| Approved Daylight and Sunlight Assessment dated 14th January 2019 26373801-BRE-001Application Documents | 25 Jul 2019 | View |
| Approved Construction Environmental Management Plan dated March 2019 Issue B;Application Documents | 25 Jul 2019 | View |
| Approved BB103 Areas Plan Drawing Number SOU-ALA-00-XX-DR-L-0007 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Analysis Report Reference REP-SRP-001 Job Number 263738-01 dated 12th December 2018Application Documents | 25 Jul 2019 | View |
| Approved Access and Circulation Plan Drawing Number 152265-ALA-00-XX-DR-L-0005 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Surface Water Management PlanApplication Documents | 23 Jul 2019 | View |
| Proposed Site SectionsApplication Documents | 23 Jul 2019 | View |
| Proposed External ElevationsApplication Documents | 23 Jul 2019 | View |
| Cherwell District Council's consultation response 14th June 2019Application Documents | 8 Jul 2019 | View |
| Email from Tanya Kozak dated 16th May 2019Application Documents | 8 Jul 2019 | View |
| Drainage Consultation Response: 24th June 2019Application Documents | 8 Jul 2019 | View |
| Transport Development Control consultation response dated 11 June 2019Application Documents | 19 Jun 2019 | View |
| Submitted 6th June 2019: Landscape General ArrangementApplication Documents | 7 Jun 2019 | View |
| Banbury Town Council consultation responseApplication Documents | 7 Jun 2019 | View |
| Design Criteria for StormApplication Documents | 20 May 2019 | View |
| Landscaping Specialist's consultation response No 2 dated 14th May 2019Application Documents | 20 May 2019 | View |
| Cherwell District Council's consultation responseApplication Documents | 14 May 2019 | View |
| Natural England consultation responseApplication Documents | 30 Apr 2019 | View |
| Scottish & Southern Electricity Networks consultation replyApplication Documents | 30 Apr 2019 | View |
| Level 01 Coordinated Services Layout Plan - Drawing No. DR-N-5102 P01Application Documents | 3 Apr 2019 | View |
| Superseded: Landscape General Arrangment Plan - Drawing No. DR-L-0002Application Documents | 3 Apr 2019 | View |
| Fencing General Arrangment Plan - Drawing No. DR-L-0003 S2 P01Application Documents | 3 Apr 2019 | View |
| Existing Services and Utility Search Report - Part 3 of 5Application Documents | 3 Apr 2019 | View |
| Preliminary Ecological Appraisal dated 05.09.18Application Documents | 3 Apr 2019 | View |
| Departure FormApplication Documents | 3 Apr 2019 | View |
| BREEAM Pre-Assessment dated November 2018Application Documents | 3 Apr 2019 | View |
| Application form dated 13.03.19Application Documents | 3 Apr 2019 | View |
| Access and Circulation Plan - Drawing No. DR-L-0005 S2 P01Application Documents | 3 Apr 2019 | View |
| Approved under NMA R3.0038/20-Outline Levels Drawing Number 0008 Revision P08 dated 14.02.2020Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Illustrative Masterplan Drawing Number 0001 Revision P07 dated 14.02.2020;Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Drainage Layout Drawing Number 0500 Revision C08 dated 02.06.2020;Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-BB103 Areas Drawing Number 0007 Revision P05 dated 14.02.2020Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Access and Circulation Drawing Number 0005 Revision P05 dated 14.02.2020;Application Documents | 9 Jun 2020 | View |
| Agent approval letter condition 4 R3.0037/20Application Documents | 13 May 2020 | View |
| Approved under condition 4-Lighting Plan drawing number D36175 AE C prepared by Kingfisher Lighting dated 07.02.2020;Application Documents | 13 May 2020 | View |
| Approved under condition 4-Application form dated 03.03.2020Application Documents | 13 May 2020 | View |
| Approved under condition 10-Proposed External Mechanical and Electrical Services Drawing No 152265-RPS-ZZ-XX-DR-N-9601 Revision P02 dated 16.05.2019Application Documents | 10 Mar 2020 | View |
| Approved under condition 10-Covering Letter from Alistair Kelly dated 02.12.2019Application Documents | 10 Mar 2020 | View |
| Condition 7 - Approval Agents letter R3.0102/19Application Documents | 10 Dec 2019 | View |
| Approved under R3.0101/19- Proposed Extension Elevations drawing number 02001 Revision P44 dated 11th November 2019Application Documents | 29 Nov 2019 | View |
| Condition 8 - Approved Fencing General Arrangment Plan - Drawing No. DR-L-0003 S2 RevP04Application Documents | 13 Nov 2019 | View |
| Approved under R3.0087/19- Proposed Elevation Strategy drawing number 152265-STL-XX-ZZ-DR-A-ZZZZ-02002 Revision P44Application Documents | 17 Oct 2019 | View |
| Agent approval letter R3.0087/19Application Documents | 17 Oct 2019 | View |
| Approved under R3.0089/19-Phase 2 Site investigation Revision V02 dated 21 11 2018Application Documents | 17 Oct 2019 | View |
| Approved under condition 15- Sustainable Drainage Statement dated August 2019Application Documents | 10 Oct 2019 | View |
| Approved under condition 15- Attachment 2 to Chris Nunn’s emailApplication Documents | 10 Oct 2019 | View |
| Approved under condition 15- Appendix 3C Woods Hardwick Development Surface WaterApplication Documents | 10 Oct 2019 | View |
| Decision noticeApplication Documents | 25 Jul 2019 | View |
| Approved Secure Line Drawing Number 152265-ALA-00-XX-DR-L-0006 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Proposed Site Sections Drawing Number 03001 Revision P31 dated 13th March 2019Application Documents | 25 Jul 2019 | View |
| Approved Proposed External Elevations Drawing Number 02001 Revision P43 dated 4th July 2019;Application Documents | 25 Jul 2019 | View |
| Approved Preliminary Unexploded Ordance (UXO) Threat Assessment Project Number P6851 Version 1.0Application Documents | 25 Jul 2019 | View |
| Approved Daylight Analysis and Glare StrategyApplication Documents | 25 Jul 2019 | View |
| Approved BREEAM New Construction 2018 Pre-assessment Report Dated November 2018 Reference HLE566010 001RApplication Documents | 25 Jul 2019 | View |
| Approved Application form dated 13.03.19Application Documents | 25 Jul 2019 | View |
| Approved Air Quality Assessment for the proposed development at Southam Road by Lucy Garland dated January 2019Application Documents | 25 Jul 2019 | View |
| xliv. Sustainable Drainage Operation and Maintenance ExpectationsApplication Documents | 23 Jul 2019 | View |
| Proposed Elevation StrategyApplication Documents | 23 Jul 2019 | View |
| Sport England consultation responseApplication Documents | 11 Jun 2019 | View |
| Submitted 6th June 2019: Landscape Maintenance PlanApplication Documents | 7 Jun 2019 | View |
| Interim Travel Plan - Revision 03 Submitted 05/06/2019Application Documents | 6 Jun 2019 | View |
| Environmental Protection Team consultation replyApplication Documents | 20 May 2019 | View |
| Crime Prevention Design consultation responseApplication Documents | 15 May 2019 | View |
| Landscaping Specialist consultation response dated 10th May 2019Application Documents | 14 May 2019 | View |
| Thames Water Utilities Ltd consultation response.Application Documents | 2 May 2019 | View |
| Archaeological Services consultation responseApplication Documents | 30 Apr 2019 | View |
| Advert for Oxford Times on 11/04/19Application Documents | 4 Apr 2019 | View |
| Ventilation & Extraction DetailsApplication Documents | 3 Apr 2019 | View |
| Sustainable Drainage Statement dated March 2019Application Documents | 3 Apr 2019 | View |
| Site Location Plan - Drawing No. DR-L-0010 S2 P01Application Documents | 3 Apr 2019 | View |
| Roof Level Coordinated Services Layout Plan - Drawing No. DR-N-5103 P01Application Documents | 3 Apr 2019 | View |
| SUPERSEDED: Proposed Site Sections Plan - DR-A-ZZZZ-03001-P31Application Documents | 3 Apr 2019 | View |
| SUPERSEDED: Proposed First Floor Plan & Roof Plan - Drawing No. DR-A-ZZZZ-01004-P31Application Documents | 3 Apr 2019 | View |
| SUPERSEDED: Proposed Elevation Strategy Plan - Drawing No. DR-A-ZZZZ-02002-P31Application Documents | 3 Apr 2019 | View |
| Preliminary Ecological Appraisal dated 05.12.18Application Documents | 3 Apr 2019 | View |
| Daylight and Sunlight AssessmentApplication Documents | 3 Apr 2019 | View |
| Outline Levels Plan - Drawing No. DR-L-0008 S2 P01Application Documents | 3 Apr 2019 | View |
| SUPERSEDED: Interim Travel Plan dated 04.03.19Application Documents | 3 Apr 2019 | View |
| Fire Safety Strategy – RIBA Stage 3 dated 13.12.18Application Documents | 3 Apr 2019 | View |
| External Lighting Plan - Drawing No. DR-E-6311 S2 P02Application Documents | 3 Apr 2019 | View |
| Existing Services and Utility Report - Part 4 of 5Application Documents | 3 Apr 2019 | View |
| Existing Services and Utility Search Report - Part 2 of 5Application Documents | 3 Apr 2019 | View |
| EIA ScreeningApplication Documents | 3 Apr 2019 | View |
| Drainage Layout Plan - Drawing No. DR-D-500 S8 P3Application Documents | 3 Apr 2019 | View |
| Design & Access Statement dated March 2019Application Documents | 3 Apr 2019 | View |
| Daylight Analysis and Glare StrategyApplication Documents | 3 Apr 2019 | View |
| SUPERSEDED: Construction Environmental Management Plan dated 21.03.19Application Documents | 3 Apr 2019 | View |
| BB103 Areas Plan - Drawing No. DR-L-0007 S2 P01Application Documents | 3 Apr 2019 | View |
| Air Quality Assessment for the proposed development dated January 2019Application Documents | 3 Apr 2019 | View |
| Approved under condition 9-Planting Plan drawing number 152265-ALA-00-XX-DR-L-0011 Revision C01Application Documents | 21 Jul 2020 | View |
| Approved under condition 9-Drainage Layout drawing number 0500 Revision C08 dated 2nd June 2020Application Documents | 21 Jul 2020 | View |
| Decision notice R3.0034.19 with NMA agent R3.0038.20 & R3.0087/20Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Secure Line Drawing Numbe 0006 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Outline Levels Drawing Number 0008 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Landscape General Arrangement Drawing Number 0002 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Drainage Layout Drawing Number 500 Revision P3 dated 3rd October 2018Application Documents | 9 Jun 2020 | View |
| Superseded plan NMA R3.0038/20-Access and Circulation Plan Drawing Number 0005 Revision P01 dated 21st September 2018Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Secure Line Drawing Number 0006 Revision P05 dated 14.02.2020Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Landscape General Arrangement Drawing Number 0002 Revision P06 dated 14.02.2020;Application Documents | 9 Jun 2020 | View |
| Approved under NMA R3.0038/20-Application form dated 18th March 2020Application Documents | 9 Jun 2020 | View |
| DP approval agent letter Condition 4 R3.0037/20Application Documents | 13 May 2020 | View |
| Approved under condition 4-Letter from Alistair Kelly at DPP Planning dated 03.03.2020Application Documents | 13 May 2020 | View |
| Approved under condition 4-Application form dated 03.03.2020Application Documents | 13 May 2020 | View |
| DP Agent approval letterApplication Documents | 10 Mar 2020 | View |
| Agent approval letter R3.0101/19Application Documents | 29 Nov 2019 | View |
| Approved under R3.0087/19-External Materials Sample Board drawing number 152265-STL-XX-XX-DR-A-ZZZZ-02003Application Documents | 17 Oct 2019 | View |
| Approved under condition 15- Email from Chris Nunn dated 05.09.2019Application Documents | 10 Oct 2019 | View |
| Approved under condition 15- Attachment 1 to Chris Nunn’s emailApplication Documents | 10 Oct 2019 | View |
| Approved under condition 11 -Secured by Design (SBD) New School 2014 application and checklist’Application Documents | 8 Oct 2019 | View |
| Approved Ventilation and Extraction detailsApplication Documents | 25 Jul 2019 | View |
| Approved Transport Assessment Referenc 069218-CUR-00-XX-RP-TP-10001 Revision 01 dated 4th March 2019Application Documents | 25 Jul 2019 | View |
| Approved Surface Water Management Plan dated 26th June 2019 by Bower & KirklandApplication Documents | 25 Jul 2019 | View |
| Approved Site Location Plan Drawing Number152265-ALA-00-XX-DR-L-0010 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Roof Level Coordinated Services Layout Document Number 152265-RPS-ZZ-RF-DR-N-5103 Revision P01 dated 5th December 2018Application Documents | 25 Jul 2019 | View |
| Approved Proposed First Floor Plan and Roof Plan Drawing Number 01004 Revision P43 dated 7th July 2019Application Documents | 25 Jul 2019 | View |
| Approved Planning Statement dated March 2019 Re 3258LoApplication Documents | 25 Jul 2019 | View |
| Approved Outline Levels Drawing Number 152265-ALA-00-XX-DR-L-0008 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Level 01 Coordinated Services Layout Document Number 152265-RPS-ZZ-01-DR-N-5102 Revision P01 dated 5th December 2018Application Documents | 25 Jul 2019 | View |
| Approved Landscape Illustrative Masterplan Drawing Numbe 152265-ALA-00-XX-DR-L-0001 Revision P01 dated 21st September 2018Application Documents | 25 Jul 2019 | View |
| Approved Interim Travel Plan Referen069218-CUR-00-XX-RP-TP-10002 Revision 03 dated 5th June 2019Application Documents | 25 Jul 2019 | View |
| Approved Fire Safety Strategy – RIBA Stage 3 TX125617 Issue 01 dated December 2018Application Documents | 25 Jul 2019 | View |
| Approved External Lighting Drawing Number 6311 Revision P02 dated January 2019Application Documents | 25 Jul 2019 | View |
| Approved Drainage Layout Drawing Number D-500 Revision P3 dated 3rd October 2018;Application Documents | 25 Jul 2019 | View |
| Approved Design and Access Statement dated March 2019Application Documents | 25 Jul 2019 | View |
| Proposed First Floor Plan and Roof PlanApplication Documents | 23 Jul 2019 | View |
| ADDITIONAL INFORMATION: Entrance area_ Submitted 16th May 2019Application Documents | 8 Jul 2019 | View |
| Drainage consultation response: 14th June 2019Application Documents | 8 Jul 2019 | View |
| Local Member Consultation responseApplication Documents | 23 Jun 2019 | View |
| Transport Development Control's consultation response dated 7th May 2019Application Documents | 19 Jun 2019 | View |
| Submitted 6th June 2019: Planting PlanApplication Documents | 7 Jun 2019 | View |
| Protected Species Officer consultation responseApplication Documents | 7 Jun 2019 | View |
| Construction Environmental Management Plan (Revision B) Submitted 05/06/2019Application Documents | 6 Jun 2019 | View |
| Transport Assessment dated 04.03.19Application Documents | 3 Apr 2019 | View |
| Site Sections Plan - Drawing No. DR-L-0004 S2 P01Application Documents | 3 Apr 2019 | View |
| Secure Line Plan - Drawing No. DR-L-0006 S2 P01Application Documents | 3 Apr 2019 | View |
| Underground Utilities Survey - Drawing No. 1815_SR_T(A0-L1)Application Documents | 3 Apr 2019 | View |
| SUPERSEDED: Proposed Ground Floor Plan - Drawing No. DR-A-ZZZZ-01003-P31Application Documents | 3 Apr 2019 | View |
| SUPERDEDED: Proposed External Elevations Plan - Drawing No. DR-A-ZZZZ-02001-P31Application Documents | 3 Apr 2019 | View |
| Preliminary Unexploded Ordance (UXO) Threat AssessmentApplication Documents | 3 Apr 2019 | View |
| Planning Statement dated March 2019Application Documents | 3 Apr 2019 | View |
| Phase 2 Site Investigation dated November 2018Application Documents | 3 Apr 2019 | View |
| Noise Impact Assessment dated February 2019Application Documents | 3 Apr 2019 | View |
| Landscape Illustrative Masterplan - Drawing No. DR-L-0001 S2 P01Application Documents | 3 Apr 2019 | View |
| Flood Risk Assessment dated 06.02.19Application Documents | 3 Apr 2019 | View |
| Existing Services and Utility Report - Part 5 of 5Application Documents | 3 Apr 2019 | View |
| Existing Services and Utility Search Report - Part 1 of 5Application Documents | 3 Apr 2019 | View |
| Document Issue SheetApplication Documents | 3 Apr 2019 | View |
| Climate Based Daylight Modelling Analysis ReportApplication Documents | 3 Apr 2019 | View |
| Approved under condition 14-DP Approval Agent LetterApplication Documents | 4 Jan 2021 | View |
| Approved under condition 14-Community Use Proposal For Cherry Fields Primary School, Wardington Road, Banbury Dated 01.12.20Application Documents | 4 Jan 2021 | View |
| Approved under R3.0060/21 Cherry Fields Primary School, Banbury Verification Report Revision P01 Issue Date16.02.2021Application Documents | 8 Jun 2021 | View |
| Approved Under R3.0060/21 Covering Letter Dated 24.03.2021Application Documents | 8 Jun 2021 | View |
| Approved Under R3.0060/21 Application Form Dated 24.03.2021Application Documents | 8 Jun 2021 | View |
| R3.0060/21 D.P Approval Agents LetterApplication Documents | 8 Jun 2021 | View |
| R3.0006/21 D.P. Approval Agents LetterApplication Documents | 25 Feb 2022 | View |
| Condition 5 Approved Cherry Fields Primary School (19/00642/OCC and R3.00334/19) Full Travel Plan Revision P03 dated 09/02/2022Application Documents | 25 Feb 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.