Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Gill Mill Quarry, Standlake Road, Ducklington,Witney, OX29 7PP
Last published check: 14 Sept 2026, 21:16. Check the council record for more recent changes.
Gill Mill Quarry, Standlake Road, Ducklington,Witney, OX29 7PP
This record has no verified map location.
Section 73 to continue the extraction of sand, gravel and clay as an extension to the existing Gill Mill site with the retention of processing plant, offices with welfare accommodation, weighbridge, sheeting bay, maintenance and storage facilities, vehicle parking areas, fuel storage, conveyor and haul road system, and existing site access, with the crushing, screening, washing, grading and blending of products for sale, retention and extension of existing water management provision including clean water lagoons and silt ponds, retention and extension of stockpiling areas, merchanting of imported aggregates, a concrete products factory, aggregate bagging plant, installation of wheel wash, erection of concrete batching plant and erection of recycled aggregate plant and the import of inert materials for recycling and non-recyclable waste materials for restoration of worked out mineral voids and the manufacture and sale of soils from site and imported materials. Restoration to a combination of nature conservation, including reed bed, meadows and woodland areas, with ecotourism development and recreational uses including retention of existing office complex building and new footpath and bridleway links with the retention and adaptation of the farm buildings of the Beef Unit Farmstead to provide ancillary development for the management of the restored land as a management centre including offices, stores, educational facilities and provision for a small scale bio mass energy plant primarily for biomass arising on site at Gill Mill Quarry, Standlake Road, Ducklington, Witney, OX29 7PP permitted by planning permission (MW.0093/20), without complying with condition 1 in order to make changes to restoration proposals in phase 3 to include a pond for drainage and the advanced use of Phase 12 for storage
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Decision Notice Mw.0093.20Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App 010 Revc Proposed Working Scheme A1Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Cond 30 Access Signage Datails June 15Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20App Tt Zone Drawing No 003 Nov 2014Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Futher Info Appendix FApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App 009 Revb Restoration Masterplan(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App 017 Restoration Sections Sheet1Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20App 3814 Gdl Xx Hw Dr C 006 P4Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App 3951 Gdl Xx Xx Dr C 001 P2Application Documents | 4 Dec 2023 | View |
| Approved 019 Rights Of Way ProposalsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Application Form & CertificatesApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Archaeological Works June 2014Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Additional Information Appendices A C V5 2 Oct 2013Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Amec Letter Dated 11th Sept 2013Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Appendix 15 4 Soil Handling GuidelinesApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Appendix EApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Appendix D Occ Minerals And Waste Fz MapsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Appendix F Sand & Gravel Resource AreasApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Area 14 Survey 26 May 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Appendix A Figure 1 Scoping PlanApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Appendix A Figure 2 Gml 021 Site PlanApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Appendix B Gml Landscape Context ProposalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Sequential Test Final Issued 30 05 2012Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Ea ApprovalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Figure 10a.1 10a.6Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Figure 10b.1 10b.3Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Figure 10c.1 10c.3Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Fra Meeting Minutes 12 01 11Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Fra Site Meeting Notes 18 03 11Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Modelled Baseline Flood ExtentsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App C10 Modelling Appendix V1Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Chapter 11 Hydrogeology FinalApplication Documents | 4 Dec 2023 | View |
| Approved Chapter 15 Agriculture & FarmingApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cogges Lane Hedge Reinforcement A2 1250 Cond 12Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 2 3814 Gdl Xx Hw Dr C 005 P4Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 8 Conveyor Crossing Point SchemeApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Chapter 9 Biodiversity FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Chapter 9 AddendumApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Chapter 9 AppendicesApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Fra July 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Further Info Appendice D June 2013Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 13 Ecoconsult Ecology Walkover Phase 5 Mw.0061.16Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 14 Weed Control Scheme June 2015 Vs 2 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 15 Gml 046 Phase 5 Working Scheme Mw.0062.16Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 15 Working Scheme Phase 5 Final Mw.0062.16Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 16 Restoration Scheme Phases 2a And 2b Vs 3 June 2015 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 53 Lake Overflow Details June 2015Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Ecoconsult Ecology Walkover Gill Mill Ic Revision 23 09 15Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Ex Layout 001 Rev3 April 2013Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Fig 1 And 2(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Fig 1 And 2Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Approved FormsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Drainage Layout Oct 2009(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Drainage Layout Oct 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Gml 021 Site PlanApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Gml 025 Revc Lodge Elevations@500Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Gml 033 Working Scheme A2at2500 MayApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Gml 036 Hydrological Mitigation Measures A2at2500 MayApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Letter Dated 22 Jul 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Lightingreport 20140813Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Lightingsupplementaryinformation 20140922Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Locatin Plan Gml 002Application Documents | 4 Dec 2023 | View |
| App M2500 Recycling Plant PlanApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Peter Brett Let 2 Dec 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Planning Boundary Gml 003Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Planning Statement Final July 2012(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Plant Complex Layout + Lighting Oct 2014Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Plant Plan Gml 005Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant App A PhotosApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant App C FraApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Approved Forms(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Submission 22 Jul 2009Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Tree Report Cond 15 Appendx AApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Working Scheme Phases 2a And 2b 18 08 15 Soils Figs AmendsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Appendix 15 4 Soil Handling Guidelines And Section 6.0 ‘mitigation Of Impacts’Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(2)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(3)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(4)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(5)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Applicationform(6)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Approved Site Plan Gml 021(1)Application Documents | 4 Dec 2023 | View |
| Approved Abstracted Waters Phase 3 Dated February 2018Application Documents | 4 Dec 2023 | View |
| Approved Condition 15 Working Scheme Phase 4 Dated 05.08.19 Version 1.3Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Condition 13 Submission Ecological Walkover Survey And Mitigation Details Dated February 2018Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Condition 15 Working Scheme Phase 3 Dated 26.02.2019 Version 3.Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Condition 53 Lake Overflow Details Phase 4 Dated 5 August 2019 Version 1.1Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Ecoconsult Ecology Walkover Gill Mill Phase 3 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Ecological Walkover Survey And Mitigation Details Dated July 2015 And Approved Pursuant To Condition 62 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Fra App 5Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Fra App 6Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 001Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 002(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 002Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Site Plan Gml 004Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Re Planning Application Mw 0024 22 Gill Mill Cond 17(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Re Planning Application Mw 0024 22 Gill Mill Cond 17Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Scheme For Phase 4 Dated August 2019 And Approved 25.10.2019 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Sections Drawing No. Gml048Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Soil Resource Plan Dated August 2019vApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Tree Survey Report Dated February 2018vcApplication Documents | 4 Dec 2023 | View |
| Approved Gill Mill Clay Deepening Statement Sept 2020 Final Vs 1 0(1)Application Documents | 4 Dec 2023 | View |
| Approved Gill Mill Claygeo Reportrev1 Final RApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gill Mill Cond 16 Restoration P 6 Feb 2022 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gill Mill Cond 53 Lake Overflow Phase 6 Draft Feb 2022 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 073 Phase 6 Restoration Proposals 210222(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Hases 2a And 2b Hydrological Mitigation Measures Drawing No. Gml 036Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Hydrology And Flood Risk And Appendices May 2012)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Phase 4 Hydrological Mitigation Drawing No. Gml 057 Rev Draft Dated December 2018Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Phase 4 Working Scheme Drawing Number Gml 055Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Phases 2a And 2b Restoration Proposals Drawing Nogml 034Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 v Planning, Flood Risk And Hydrology’ DocumentApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Proposed Restoration Plan Drawing No.gml047Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Rare Arable Annual Species Management Plan Dated July 2015 And Approved 19.10.2015 Pursuant To Condition 20 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Re Gill Mill ConditionsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Aftercare Phase 1cApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Aftercare Phase 3Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Aftercare Phase 4Application Documents | 4 Dec 2023 | View |
| Approved under condition 13Approved under condition 13 Redacted Ecoconsult Ecology Walkover Gill Mill Phase 9 01.12.2025(1)Application Documents | 22 May 2026 | View |
| Approved under condition 13 Applicationform(1)(1)Application Documents | 22 May 2026 | View |
| Approved under condition 13 Ecoconsult Gcn Edna Survey Report Gill Mill Phase 9 17.05.2026(1)Application Documents | 22 May 2026 | View |
| Approved under condition 13 Gcn Report 486 2026 Edna Test Results(1)Application Documents | 22 May 2026 | View |
| Approved Chapter 7 DustApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gill Mill Working Scheme Cond 15 Phase 6 Feb 2022 Final With AppApplication Documents | 4 Dec 2023 | View |
| Drawing No: GML/010 Rev C ‘Proposed Working Scheme’Application Documents | 27 Nov 2023 | View |
| Approved Site Plan Gml 021 Jan 2012Application Documents | 27 Nov 2023 | View |
| Approved Gml 009 Rev B Restoration Masterplan Nov 2011Application Documents | 27 Nov 2023 | View |
| Approved 012 Development Stages Start Phase 3Application Documents | 4 Dec 2023 | View |
| Approved 013 Development Stages Start Phase 6Application Documents | 4 Dec 2023 | View |
| Approved 014 Development Stages Start Phase 8Application Documents | 4 Dec 2023 | View |
| Approved 015 Development Stages Start Phase 10Application Documents | 4 Dec 2023 | View |
| Approved 016 Development Stages Start Phase 12Application Documents | 4 Dec 2023 | View |
| Approved 011 Development Stages Start Phase 1aApplication Documents | 4 Dec 2023 | View |
| Approved 017 Restoration Sections Sheet1(1)Application Documents | 4 Dec 2023 | View |
| Approved 001 Contour PlanApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App 018 Restoration Sections Sheet2 A1(1)Application Documents | 4 Dec 2023 | View |
| Approved 018 Restoration Sections Sheet2 A1Application Documents | 4 Dec 2023 | View |
| Approved App 020 LocationApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Awbs Zone Nov 2014Application Documents | 4 Dec 2023 | View |
| Approved Base Of Mineral May 2012 Gmg003Application Documents | 4 Dec 2023 | View |
| Approved C10 Appendix C Sfra Fz Maps For Gill MillApplication Documents | 4 Dec 2023 | View |
| Approved Chapter 13 Noise Final 24 Feb 2012Application Documents | 4 Dec 2023 | View |
| Approved Chapter 10 Hydrology & Flood Risk FinalApplication Documents | 4 Dec 2023 | View |
| Approved Figure Gm.13.1a Noise Sensitive Receptors And Monitoring LocationsApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Cond 50 Abstracted Waters Scheme Final July 2015 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Gill Mill Lighting October 2014 FinalApplication Documents | 4 Dec 2023 | View |
| Approved Gml 025 Revc Lodge Elevations@500(1)Application Documents | 4 Dec 2023 | View |
| Approved Gml 026 Reva Beef Unit N&s Elevations@750Application Documents | 4 Dec 2023 | View |
| Approved Gml 027 Reva Beef Unit E&w Elevations@750Application Documents | 4 Dec 2023 | View |
| Approved Gml 028 Revb Beef Unit Layout 500 At A3Application Documents | 4 Dec 2023 | View |
| Approved M2500 Recycling Plant Plan(1)Application Documents | 4 Dec 2023 | View |
| Approved Mineralthickness May 2012 Gmg004Application Documents | 4 Dec 2023 | View |
| Approved Planning Statement Final July 2012Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Plant Survey Email 29 May 2009Application Documents | 4 Dec 2023 | View |
| ApprovedRecycled Plant App B FlocculentApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Sm Zone Nov 2014Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 App Transport Statement June 09Application Documents | 4 Dec 2023 | View |
| Approved Gill Mill Cond 17 Aftercare Scheme Phase 6 Feb 2022 FinalApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Barn Owl Mitigation Scheme For Phase 2 Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 24 Of Permission 13 0530p Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved Chapter 9 Of The Environmental Statement, Including Section 9 (site Restoration Scheme) And Table 9.14Application Documents | 4 Dec 2023 | View |
| Approved Chapter 11 Of The Environmental Statement ‘hydrogeology And Ground Conditions’, Including The Mitigation Measures Set Out In Section 6.2 And 8.1Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Conceptual Drainage Layout Plan Drawing No. H8202 001Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Drawing No 3951 Gdl Xx Xx Dr C 003 P1 Proposed Conveyor Crossing 1 Location Plan And SectionsApplication Documents | 4 Dec 2023 | View |
| Approved Ecoconsult Ecology Walkover Gill Mill Phase 6 01.04.2022Application Documents | 4 Dec 2023 | View |
| Approved Existing Layout 2013 Drawing No 001 Rev 1 Dated April 2013Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Figure 1 Recharge Trench LocationApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Figure 2 Recharge Trench Schematic Cross SectionApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Figure 4.6 High Groundwater Level Contours Dated January 2011Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Figure 4.7 Low Groundwater Level Contours Dated January 2011Application Documents | 4 Dec 2023 | View |
| Approved Site & Overburden May 2012 Gmg002Application Documents | 4 Dec 2023 | View |
| Approved Site & Phasing May 2012 Gmg001Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Recharge Trench Scheme Dated 09.07.2015 And Approved 19.10.2015 Pursuant To Condition 51 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Scheme For Phase 1c Dated 13th April 2016 And Approved 03.10.2016 Pursuant To Condition 16 Of Permission 130530pcm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Scheme For Phase 3 Dated May 2018 And Approved 23.08.2018 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Scheme For Phase 5 Dated 11th March 2016 Approved 03.10.2016 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Restoration Scheme Phase 3 Planting Details Dated 06.08.18Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Standoff Protection Scheme Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 23 Of Permission 13 0530pcm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved Technical Note March 2019Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Tree Survey Report Dated February 2018Application Documents | 4 Dec 2023 | View |
| Approved Wood Clay Variation Sssi Letter 12 Aug 2020Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Working Scheme For Phase 4 Dated August 2019 And Approved 25.10.2019 Pursuant To Condition 15 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 071 Phase 6a Working Scheme 210222Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 072 Phase 6b Working Scheme 210222Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 073 Phase 6 Restoration Proposals 210222Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 074 Phase 6 Illustrative Rest Sections A3@250 210222Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 075 Future Eco Tourism Lodges On Phases 4 And 6 200422(1)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Gml 075 Future Eco Tourism Lodges On Phases 4 And 6 200422Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Illustrative Sections Through Phase 2a Lake Edges Drawing No. Gml 039Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Illustrative Sections Through Phase 4 Restored Reedbed Drawing Number Gml 058 Dated January 2019Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Lake Overflow Details For Phase 5 Dated February 2015 And Approved 03.10.2016 Pursuant To Condition 53 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Phase 1c Restoration Plan Drawing No. Gml0 49Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Phase 4 Hydrological Mitigation Drawing Number Gml 057 Rev AApplication Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 v Phases 3 & 4 Soil Resource Plan Dated August 2019Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Predevelopment Works Scheme Dated July 2015 And Approved 19.10.2015 Pursuant To Condition 63 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents | 4 Dec 2023 | View |
| Approved under MW.0093/20 Aftercare Phase 5Application Documents | 4 Dec 2023 | View |
| Approved Application Form Dated 08 09 2020Application Documents | 28 Jan 2025 | View |
| Approved Application Form 19-3-2013Application Documents | 28 Jan 2025 | View |
| Approved Recycling Processing Plant – Application FormApplication Documents | 28 Jan 2025 | View |
| Approved Recycling Processing Plant - Flood Risk Assessment Appendix 6Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Proposed Recycling Plant Proposed Surface Water Drainage Layout - Drawing No: 22476/002/001 Rev CApplication Documents | 29 Jan 2025 | View |
| Approved Recycling Processing Plant - Flood Risk Assessment Appendix 5Application Documents | 29 Jan 2025 | View |
| Approved Recycling Processing Plant - Letter From Smith & Sons Dated 22/07/2009Application Documents | 29 Jan 2025 | View |
| Approved Recycling Processing Plant - Modelled Flood Extents - Drawing No: 22476/001/001Application Documents | 29 Jan 2025 | View |
| Approved Recycling Processing Plant - Proposed Flood Compensation Scheme - Drawing No: 22476/001/002Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Quarry Witney – Site Location Plan Figure 1 dated 06.05.09Application Documents | 29 Jan 2025 | View |
| Approved Proposed Recycling Plant at Gill Mill Quarry Witney – Flood Risk Assessment – Project Ref 22476/001 dated July 2009Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Proposed Recycling Plant – Location Plan – Drawing No: GML/022 dated Nov 2008Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Quarry Witney – Site Location Plan Figure 2 dated 06.05.09Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Proposed Recycling Plant – Site Plan GML/004 dated Nov 2008Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Proposed Recycling Plant – Planning Application Boundary GML/003 dated Nov 2008Application Documents | 29 Jan 2025 | View |
| Approved Gill Mill Proposed Recycling Plant – Illustrative Washing Plant GML/005 dated Nov 2008Application Documents | 29 Jan 2025 | View |
| Approved Processing Plant for Recycled Aggregates Supporting Statement dated December 2008Application Documents | 29 Jan 2025 | View |
| ApprovedArea 14 Survey 26th May 2009 Drawing No 001Application Documents | 29 Jan 2025 | View |
| Approved Recycling Processing Plant Appendix A – PhotographsApplication Documents | 29 Jan 2025 | View |
| Approved Ecological Walkover Survey And Mitigation Details For Phase 8 Dated July 2023 And Approved 01 11 2023 Pursuant To Condition 13Application Documents | 3 Feb 2025 | View |
| Approved Ecoconsult Bat Survey Report Gill Mill Phase 8 Tree 17.07.2023Application Documents | 3 Feb 2025 | View |
| Approved Ecological Walkover Survey and Mitigation Details for Phase 7 dated July 2022 and approved 06/03/2023 pursuant to condition 13 of permission 20/03176/CM (MW.0093/20)Application Documents | 3 Feb 2025 | View |
| Approved Arboricultural Report Survey Gill Mill Phases 7 and 8 (October 2022)Application Documents | 3 Feb 2025 | View |
| Approved Working Scheme For Phase 7 Dated January 2023 Condition 15Application Documents | 3 Feb 2025 | View |
| Approved Drawing No Gml 079 Phase 7a Working Scheme (january 2023)Application Documents | 3 Feb 2025 | View |
| Approved Drawing No Gml 080 Phase 7b Working Scheme (january 2023)Application Documents | 3 Feb 2025 | View |
| Approved Cond 15Application Documents | 3 Feb 2025 | View |
| Approved Gill Mill Working Scheme Cond 15 Phase 7 Final Jan 2023Application Documents | 3 Feb 2025 | View |
| Approved Gill Mill Working Scheme Cond 15 Phase 6 Feb 2022 Final With App(1)Application Documents | 4 Feb 2025 | View |
| Phases 2A & 2B Working Scheme - Drawing No: GML 033 -Phases 2A & 2B Working Scheme - Drawing No: GML 033Application Documents | 6 Feb 2025 | View |
| Working Scheme for Phase 2 dated 1st July 2015 and approved 25/10/2019 pursuant to Condition 15 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents | 6 Feb 2025 | View |
| Location Plan and Sections Proposed Crossings 1-3 - Drawing No: 3951-GDL- XX-XX-DR-C-001 P2Application Documents | 6 Feb 2025 | View |
| Phases 2a & 2b Hydrological Mitigation Measures Drawing No Gml 036Application Documents | 6 Feb 2025 | View |
| Tree Survey Report Dated February 2018(1)Application Documents | 6 Feb 2025 | View |
| Appendix A: Nicholsons Tree Report Working Scheme for Phase 3 dated February 2019 and approved 25/10/2019 pursuant to Condition 15 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents | 6 Feb 2025 | View |
| Letter From Mike Carey (amec) To Lesley Tims Dated 11 September 2013Application Documents | 6 Feb 2025 | View |
| Additional Information 41533 Wod Xx Xx Rp Ow 0001 A P02 Monitoring Report 2018 Final Min (gill Mill Quarry Complex Hydrological Monitoring Review No. 13 (2018))Application Documents | 6 Feb 2025 | View |
| Additional Information Agent Email To Ecology Occ (8th April 2022)Application Documents | 6 Feb 2025 | View |
| Restoration Scheme for Phase 2 dated 17th June -and approved 19/10/2015 pursuant to Condition 16 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents | 6 Feb 2025 | View |
| 8475 001 R 01 V01 Stability Risk Assessment For Proposed Mineral Extraction Adjacent To Pylon Infrastructure (august 2022)Application Documents | 6 Feb 2025 | View |
| Additional Information Including Appendices A F) Submission Dated September 2013Application Documents | 6 Feb 2025 | View |
| App Cond 15 Working Scheme Phase 5 Final Mw.0062.16(2)Application Documents | 6 Feb 2025 | View |
| Programme Of Archaeological Works’ Prepared By Oxford Archaeology Dated June 2014Application Documents | 6 Feb 2025 | View |
| Aftercare Scheme for Phase 8 dated August 2023 and approved 18/12/2023 pursuant to Condition 17 of permission 20/03176/CM (MW.0093/20) includingApplication Documents | 6 Feb 2025 | View |
| Extra Info From Agents 8th December 2023Application Documents | 6 Feb 2025 | View |
| Bird Hide Details for Phase 8 dated 29/08/23 and approved 08/11/2023 pursuant to condition 21 of permission 20/03176/CM (MW.0093/20) including:Application Documents | 6 Feb 2025 | View |
| Restoration Proposals drawing number GML_056 Revision A dated July 2019Application Documents | 6 Feb 2025 | View |
| Restoration Scheme for Phase 5 dated 11th March 2016 approved 03/10/2016 pursuant to Condition 16 of permission 13/0530/P/CM (MW.0050/13) includingApplication Documents | 7 Feb 2025 | View |
| Aftercare Scheme for Phase 1c dated 25th April 2016 and approved 03/10/2016 pursuant to Condition 17 of permission 13/0530/P/CM (MW.0050/13)Application Documents | 7 Feb 2025 | View |
| Aftercare Scheme for Phase 3 dated February 2018 and approved 23/08/2018 pursuant to Condition 17 of permission 13/0530/P/CM (MW.0050/13)Application Documents | 7 Feb 2025 | View |
| Access Signage Details Scheme Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 30 Of Permission 130530pcm (mw.0050.13)Application Documents | 7 Feb 2025 | View |
| Abstracted Waters Scheme for Phase 4 dated January 2019 and approved 03/07/2019 pursuant to condition 50 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents | 7 Feb 2025 | View |
| Lake Overflow Details for Phase 4 approved dated August 2018 and approved 28/10/2018 pursuant to condition 53 of permission 13/0530/P/CM (MW.0050/13)Application Documents | 7 Feb 2025 | View |
| Ecological Walkover Survey and Mitigation Details dated July 2015 and approved 19/10/2015 pursuant to condition 62 of permission 13/0530/P/CM (MW.0050/13)Application Documents | 7 Feb 2025 | View |
| Approved Gill Mill Phase 6 Cond 50 FinalApplication Documents | 7 Feb 2025 | View |
| Figure 2 Recharge Trench Schematic Cross SectionApplication Documents | 11 Feb 2025 | View |
| Appendix A - Settlement Tank details dated 03/01/19Application Documents | 11 Feb 2025 | View |
| Condition 13 Submission Ecological Walkover Survey And Mitigation Details Dated February 2018(1)Application Documents | 11 Feb 2025 | View |
| Gml 093 Phase 8 Illustrative Rest Sections A3 220823Application Documents | 11 Feb 2025 | View |
| Gill Mill Cond 53 Lake Overflow Phase 8 Final August 2023Application Documents | 11 Feb 2025 | View |
| Approved Nicholsons Arboricultural Report Survey Phase 7 And 8, Gill Mill Quarry, Ducklington, Oxfordshire (18 23october 2022)Application Documents | 14 Feb 2025 | View |
| Approved Condition 16 Restoration Scheme Phase 7 (january 2023)Application Documents | 14 Feb 2025 | View |
| Approved Condition 16 Restoration Scheme Phase 7 (january 2023Application Documents | 14 Feb 2025 | View |
| Approved Drawing No. Gml 082 Phase 7 Illustrative Sections Through Phase 7 Reed Beds (january 2023)Application Documents | 14 Feb 2025 | View |
| Approved S106 Plan B (june 2014)Application Documents | 14 Feb 2025 | View |
| Approved Drawing No. Gml 094 Phase 4 Screen Hide Details (august 2023)Application Documents | 14 Feb 2025 | View |
| Approved Abstracted Waters Scheme for Phase 7 dated January 2023 and approved 06/03/2023 pursuant to condition 50 of permission 20/03176/CM (MW.0093/20) includingApplication Documents | 24 Feb 2025 | View |
| Approved Drawing No.GML_086 Phase 8 Restoration Proposals (May 2023)Application Documents | 24 Feb 2025 | View |
| Approved Drawing No. GML_093 Phase 8 Illustrative Sections through Phase 8 Reed Beds (August 2023)Application Documents | 24 Feb 2025 | View |
| Approved Stability Risk Assessment for Proposed Mineral Extraction Adjacent to Pylon Infrastructure (August 2022)Application Documents | 24 Feb 2025 | View |
| Approved Nicholsons Arboricultural Report Survey Gill Mill Phase 7 and 8 (October 2022)Application Documents | 24 Feb 2025 | View |
| Approved Condition 16 Restoration Scheme Phase 8 (August 2023)Application Documents | 24 Feb 2025 | View |
| Gill Mill Cond 53 Lake Overflow Phase 7 Final Jan 2023Application Documents | 24 Feb 2025 | View |
| Gml 081 Phase 7 Restoration Proposals 250123(1)Application Documents | 24 Feb 2025 | View |
| Gill Mill Cond 53 Lake Overflow Phase 8 Final August 2023(1)Application Documents | 24 Feb 2025 | View |
| Gml 073 Phase 6 Restoration Proposals Feb 22Application Documents | 24 Feb 2025 | View |
| Gill Mill Cond 53 Lake Overflow Phase 6 Draft Feb 2022 Final(1)Application Documents | 24 Feb 2025 | View |
| Gml 085 Phase 8b Working Scheme 220823Application Documents | 24 Feb 2025 | View |
| Gml 084 Phase 8a Working Scheme 220823Application Documents | 24 Feb 2025 | View |
| Gill Mill Phase 8 Cond 50 Final August 2023Application Documents | 24 Feb 2025 | View |
| Ecological Walkover Survey and Mitigation Details for Phase 3 dated September 2017 and approved 13/07/2018 pursuant to condition 13 of permission 13/0530/P/CM (MW.0050/13)Application Documents | 26 Feb 2025 | View |
| App Cond 50 Abstracted Waters Phase 5 Mw.0067.16Application Documents | 26 Feb 2025 | View |
| Comment Cllr Fenton Mw016523 Gill MillApplication Documents | 11 Dec 2023 | View |
| Mw016523 Comment Environmental HealthApplication Documents | 14 Dec 2023 | View |
| Comments Rights Of Way Mw.016523Application Documents | 22 Dec 2023 | View |
| Comments MOD 11.01.24Application Documents | 11 Jan 2024 | View |
| Comments Natural England 11.01.24Application Documents | 11 Jan 2024 | View |
| Comments Landscape 18.01.24Application Documents | 18 Jan 2024 | View |
| Mw.0165.23 Gill Mill S73 Biodiversity Response Jan24Application Documents | 2 Feb 2024 | View |
| Comments Environment Agency Mw016523 12.04.24Application Documents | 12 Apr 2024 | View |
| Comments Environment Agency Mw016523 071024Application Documents | 8 Oct 2024 | View |
| Comments Environment Agency Mw016523 181224Application Documents | 18 Dec 2024 | View |
| Mw.0165.23 Gill Mill S73 Biodiversity Response Jan25Application Documents | 15 Jan 2025 | View |
| Decision Notice for MW.0165/23Application Documents | 4 Feb 2025 | View |
| Approved ApplicationformApplication Documents | 27 Nov 2023 | View |
| Approved Arboricultural Impact Assessment Gill Mill - Phase 12 02.11.23Application Documents | 27 Nov 2023 | View |
| Approved under MW.0093/20 Soil Resource Plan Dated August 2019Application Documents | 4 Dec 2023 | View |
| Response To Environment Agency From Agent 10.06.24Application Documents | 12 Jun 2024 | View |
| Approved Amended Gill Mill Pond And Phase 12 S73 Statement Amend 9 Jul 2024Application Documents | 3 Sept 2024 | View |
| DELEGATED REPORTApplication Documents | 29 Jan 2025 | View |
| Approved under 16 Gill Mill Cond 16 Restoration Phase 9 Amend Sept 2025Application Documents | 9 Dec 2025 | View |
| Approved under 15 Gill Mill Cond 15 Phase 9 Working Scheme July 2025 With AppendixApplication Documents | 10 Dec 2025 | View |
| Approved under cond 17 Gill Mill Cond 17 Aftercare Scheme Phase 9 Amend Jan 2026Application Documents | 28 Jan 2026 | View |
| Departure FormApplication Documents | 5 Dec 2023 | View |
| EIAApplication Documents | 5 Dec 2023 | View |
| Approved under 16 Applicationform(7)Application Documents | 9 Dec 2025 | View |
| Approved under 15 Applicationform(8)Application Documents | 10 Dec 2025 | View |
| Approved under cond 17 Applicationform(9)Application Documents | 28 Jan 2026 | View |
| MW ADVERTApplication Documents | 5 Dec 2023 | View |
| M&W Agents Approval LetterApplication Documents | 29 Jan 2025 | View |
| Approved under 16 D.p Approval Agents Letter Mw.0067 25Application Documents | 9 Dec 2025 | View |
| Approved under 15 D.p Approval Agents Letter Mw.0066 25(2)Application Documents | 10 Dec 2025 | View |
| Approved under cond 17 D.p Approval Agents Letter Mw.0068 25Application Documents | 28 Jan 2026 | View |
| Approved Gml 093 Phase 12 Layout Sept 2023Application Documents | 27 Nov 2023 | View |
| Gml 054 Phase 3 Restoration Proposals Rev A A2 At 2500 Jul 20Application Documents | 27 Nov 2023 | View |
| Approved Ecoconsult Pea Survey Report Gill Mill Quarry Phase 12 03.10.2023Application Documents | 27 Nov 2023 | View |
| Approved under 16 Gml 103 Reva Phase 9 Restoration ProposalsApplication Documents | 9 Dec 2025 | View |
| Approved under 16 Gml 104 Reva Phase 9 Illustrative Rest Sections A3@250Application Documents | 9 Dec 2025 | View |
| Approved under 15 Gml 102 Phase 9 Working Scheme 100625Application Documents | 10 Dec 2025 | View |
| Variation of Permission MW.0093/20 – To vary restoration details of Phase 3 and operational use of Phase 12 Final 16 Nov 2023Application Documents | 27 Nov 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.