Council planning record

Section 73 to continue the extraction of sand, gravel and clay as an extension to the existing Gill Mill site with the retention of processing plant, offices with welfare accommodation, weighbridge, sheeting bay, maintenance and storage facilities, vehicle parking areas, fuel storage, conveyor and haul road system, and existing site access, with the crushing, screening, washing, grading and blending of products for sale, retention and extension of existing water management provision including clean water lagoons and silt ponds, retention and extension of stockpiling areas, merchanting of imported aggregates, a concrete products factory, aggregate bagging plant, installation of wheel wash, erection of concrete batching plant and erection of recycled aggregate plant and the import of inert materials for recycling and non-recyclable waste materials for restoration of worked out mineral voids and the manufacture and sale of soils from site and imported materials. Restoration to a combination of nature conservation, including reed bed, meadows and woodland areas, with ecotourism development and recreational uses including retention of existing office complex building and new footpath and bridleway links with the retention and adaptation of the farm buildings of the Beef Unit Farmstead to provide ancillary development for the management of the restored land as a management centre including offices, stores, educational facilities and provision for a small scale bio mass energy plant primarily for biomass arising on site at Gill Mill Quarry, Standlake Road, Ducklington, Witney, OX29 7PP permitted by planning permission (MW.0093/20), without complying with condition 1 in order to make changes to restoration proposals in phase 3 to include a pond for drainage and the advanced use of Phase 12 for storage

Gill Mill Quarry, Standlake Road, Ducklington,Witney, OX29 7PP

Application DecidedReference: MW.0165/23Oxfordshire County Council

Last published check: 14 Sept 2026, 21:16. Check the council record for more recent changes.

Application location

Gill Mill Quarry, Standlake Road, Ducklington,Witney, OX29 7PP

This record has no verified map location.

Application summary

Status
Application Decided
Application type
Section 73
Received
Not published
Validated
27 Nov 2023
Determination deadline
Not published
Local authority
Oxfordshire County Council

Application overview

Section 73 to continue the extraction of sand, gravel and clay as an extension to the existing Gill Mill site with the retention of processing plant, offices with welfare accommodation, weighbridge, sheeting bay, maintenance and storage facilities, vehicle parking areas, fuel storage, conveyor and haul road system, and existing site access, with the crushing, screening, washing, grading and blending of products for sale, retention and extension of existing water management provision including clean water lagoons and silt ponds, retention and extension of stockpiling areas, merchanting of imported aggregates, a concrete products factory, aggregate bagging plant, installation of wheel wash, erection of concrete batching plant and erection of recycled aggregate plant and the import of inert materials for recycling and non-recyclable waste materials for restoration of worked out mineral voids and the manufacture and sale of soils from site and imported materials. Restoration to a combination of nature conservation, including reed bed, meadows and woodland areas, with ecotourism development and recreational uses including retention of existing office complex building and new footpath and bridleway links with the retention and adaptation of the farm buildings of the Beef Unit Farmstead to provide ancillary development for the management of the restored land as a management centre including offices, stores, educational facilities and provision for a small scale bio mass energy plant primarily for biomass arising on site at Gill Mill Quarry, Standlake Road, Ducklington, Witney, OX29 7PP permitted by planning permission (MW.0093/20), without complying with condition 1 in order to make changes to restoration proposals in phase 3 to include a pond for drainage and the advanced use of Phase 12 for storage

Proposal details

Reference
MW.0165/23
Agent
Lucy Binnie

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 315 of 315

DocumentPublishedAction
Decision Notice Mw.0093.20Application Documents4 Dec 2023View
Approved under MW.0093/20 App 010 Revc Proposed Working Scheme A1Application Documents4 Dec 2023View
Approved under MW.0093/20 Cond 30 Access Signage Datails June 15Application Documents4 Dec 2023View
Approved under MW.0093/20App Tt Zone Drawing No 003 Nov 2014Application Documents4 Dec 2023View
Approved under MW.0093/20 App Futher Info Appendix FApplication Documents4 Dec 2023View
Approved under MW.0093/20 App 009 Revb Restoration Masterplan(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App 017 Restoration Sections Sheet1Application Documents4 Dec 2023View
Approved under MW.0093/20App 3814 Gdl Xx Hw Dr C 006 P4Application Documents4 Dec 2023View
Approved under MW.0093/20 App 3951 Gdl Xx Xx Dr C 001 P2Application Documents4 Dec 2023View
Approved 019 Rights Of Way ProposalsApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Application Form & CertificatesApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Archaeological Works June 2014Application Documents4 Dec 2023View
Approved under MW.0093/20 App Additional Information Appendices A C V5 2 Oct 2013Application Documents4 Dec 2023View
Approved under MW.0093/20 App Amec Letter Dated 11th Sept 2013Application Documents4 Dec 2023View
Approved under MW.0093/20 App Appendix 15 4 Soil Handling GuidelinesApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Appendix EApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Appendix D Occ Minerals And Waste Fz MapsApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Appendix F Sand & Gravel Resource AreasApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Area 14 Survey 26 May 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Appendix A Figure 1 Scoping PlanApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Appendix A Figure 2 Gml 021 Site PlanApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Appendix B Gml Landscape Context ProposalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Sequential Test Final Issued 30 05 2012Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Ea ApprovalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Figure 10a.1 10a.6Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Figure 10b.1 10b.3Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Figure 10c.1 10c.3Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Fra Meeting Minutes 12 01 11Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Fra Site Meeting Notes 18 03 11Application Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Modelled Baseline Flood ExtentsApplication Documents4 Dec 2023View
Approved under MW.0093/20 App C10 Modelling Appendix V1Application Documents4 Dec 2023View
Approved under MW.0093/20 App Chapter 11 Hydrogeology FinalApplication Documents4 Dec 2023View
Approved Chapter 15 Agriculture & FarmingApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Cogges Lane Hedge Reinforcement A2 1250 Cond 12Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 2 3814 Gdl Xx Hw Dr C 005 P4Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 8 Conveyor Crossing Point SchemeApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Chapter 9 Biodiversity FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Chapter 9 AddendumApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Chapter 9 AppendicesApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Fra July 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App Further Info Appendice D June 2013Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 13 Ecoconsult Ecology Walkover Phase 5 Mw.0061.16Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 14 Weed Control Scheme June 2015 Vs 2 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 15 Gml 046 Phase 5 Working Scheme Mw.0062.16Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 15 Working Scheme Phase 5 Final Mw.0062.16Application Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 16 Restoration Scheme Phases 2a And 2b Vs 3 June 2015 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 53 Lake Overflow Details June 2015Application Documents4 Dec 2023View
Approved under MW.0093/20 App Ecoconsult Ecology Walkover Gill Mill Ic Revision 23 09 15Application Documents4 Dec 2023View
Approved under MW.0093/20 App Ex Layout 001 Rev3 April 2013Application Documents4 Dec 2023View
Approved under MW.0093/20 App Fig 1 And 2(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Fig 1 And 2Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Approved FormsApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Drainage Layout Oct 2009(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Drainage Layout Oct 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App Gml 021 Site PlanApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Gml 025 Revc Lodge Elevations@500Application Documents4 Dec 2023View
Approved under MW.0093/20 App Gml 033 Working Scheme A2at2500 MayApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Gml 036 Hydrological Mitigation Measures A2at2500 MayApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Letter Dated 22 Jul 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App Lightingreport 20140813Application Documents4 Dec 2023View
Approved under MW.0093/20 App Lightingsupplementaryinformation 20140922Application Documents4 Dec 2023View
Approved under MW.0093/20 App Locatin Plan Gml 002Application Documents4 Dec 2023View
App M2500 Recycling Plant PlanApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Peter Brett Let 2 Dec 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App Planning Boundary Gml 003Application Documents4 Dec 2023View
Approved under MW.0093/20 App Planning Statement Final July 2012(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Plant Complex Layout + Lighting Oct 2014Application Documents4 Dec 2023View
Approved under MW.0093/20 App Plant Plan Gml 005Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant App A PhotosApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant App C FraApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Approved Forms(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Submission 22 Jul 2009Application Documents4 Dec 2023View
Approved under MW.0093/20 App Tree Report Cond 15 Appendx AApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Working Scheme Phases 2a And 2b 18 08 15 Soils Figs AmendsApplication Documents4 Dec 2023View
Approved under MW.0093/20 Appendix 15 4 Soil Handling Guidelines And Section 6.0 ‘mitigation Of Impacts’Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(2)Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(3)Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(4)Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(5)Application Documents4 Dec 2023View
Approved under MW.0093/20 Applicationform(6)Application Documents4 Dec 2023View
Approved under MW.0093/20 Approved Site Plan Gml 021(1)Application Documents4 Dec 2023View
Approved Abstracted Waters Phase 3 Dated February 2018Application Documents4 Dec 2023View
Approved Condition 15 Working Scheme Phase 4 Dated 05.08.19 Version 1.3Application Documents4 Dec 2023View
Approved under MW.0093/20 Condition 13 Submission Ecological Walkover Survey And Mitigation Details Dated February 2018Application Documents4 Dec 2023View
Approved under MW.0093/20 Condition 15 Working Scheme Phase 3 Dated 26.02.2019 Version 3.Application Documents4 Dec 2023View
Approved under MW.0093/20 Condition 53 Lake Overflow Details Phase 4 Dated 5 August 2019 Version 1.1Application Documents4 Dec 2023View
Approved under MW.0093/20 Ecoconsult Ecology Walkover Gill Mill Phase 3 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 Ecological Walkover Survey And Mitigation Details Dated July 2015 And Approved Pursuant To Condition 62 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Fra App 5Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Fra App 6Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 001Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 002(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 App Recycled Plant Fra Plan 2247 001 002Application Documents4 Dec 2023View
Approved under MW.0093/20 App Site Plan Gml 004Application Documents4 Dec 2023View
Approved under MW.0093/20 Re Planning Application Mw 0024 22 Gill Mill Cond 17(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 Re Planning Application Mw 0024 22 Gill Mill Cond 17Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Scheme For Phase 4 Dated August 2019 And Approved 25.10.2019 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Sections Drawing No. Gml048Application Documents4 Dec 2023View
Approved under MW.0093/20 Soil Resource Plan Dated August 2019vApplication Documents4 Dec 2023View
Approved under MW.0093/20 Tree Survey Report Dated February 2018vcApplication Documents4 Dec 2023View
Approved Gill Mill Clay Deepening Statement Sept 2020 Final Vs 1 0(1)Application Documents4 Dec 2023View
Approved Gill Mill Claygeo Reportrev1 Final RApplication Documents4 Dec 2023View
Approved under MW.0093/20 Gill Mill Cond 16 Restoration P 6 Feb 2022 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 Gill Mill Cond 53 Lake Overflow Phase 6 Draft Feb 2022 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 Gml 073 Phase 6 Restoration Proposals 210222(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 Hases 2a And 2b Hydrological Mitigation Measures Drawing No. Gml 036Application Documents4 Dec 2023View
Approved under MW.0093/20 Hydrology And Flood Risk And Appendices May 2012)Application Documents4 Dec 2023View
Approved under MW.0093/20 Phase 4 Hydrological Mitigation Drawing No. Gml 057 Rev Draft Dated December 2018Application Documents4 Dec 2023View
Approved under MW.0093/20 Phase 4 Working Scheme Drawing Number Gml 055Application Documents4 Dec 2023View
Approved under MW.0093/20 Phases 2a And 2b Restoration Proposals Drawing Nogml 034Application Documents4 Dec 2023View
Approved under MW.0093/20 v Planning, Flood Risk And Hydrology’ DocumentApplication Documents4 Dec 2023View
Approved under MW.0093/20 Proposed Restoration Plan Drawing No.gml047Application Documents4 Dec 2023View
Approved under MW.0093/20 Rare Arable Annual Species Management Plan Dated July 2015 And Approved 19.10.2015 Pursuant To Condition 20 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Re Gill Mill ConditionsApplication Documents4 Dec 2023View
Approved under MW.0093/20 Aftercare Phase 1cApplication Documents4 Dec 2023View
Approved under MW.0093/20 Aftercare Phase 3Application Documents4 Dec 2023View
Approved under MW.0093/20 Aftercare Phase 4Application Documents4 Dec 2023View
Approved under condition 13Approved under condition 13 Redacted Ecoconsult Ecology Walkover Gill Mill Phase 9 01.12.2025(1)Application Documents22 May 2026View
Approved under condition 13 Applicationform(1)(1)Application Documents22 May 2026View
Approved under condition 13 Ecoconsult Gcn Edna Survey Report Gill Mill Phase 9 17.05.2026(1)Application Documents22 May 2026View
Approved under condition 13 Gcn Report 486 2026 Edna Test Results(1)Application Documents22 May 2026View
Approved Chapter 7 DustApplication Documents4 Dec 2023View
Approved under MW.0093/20 Gill Mill Working Scheme Cond 15 Phase 6 Feb 2022 Final With AppApplication Documents4 Dec 2023View
Drawing No: GML/010 Rev C ‘Proposed Working Scheme’Application Documents27 Nov 2023View
Approved Site Plan Gml 021 Jan 2012Application Documents27 Nov 2023View
Approved Gml 009 Rev B Restoration Masterplan Nov 2011Application Documents27 Nov 2023View
Approved 012 Development Stages Start Phase 3Application Documents4 Dec 2023View
Approved 013 Development Stages Start Phase 6Application Documents4 Dec 2023View
Approved 014 Development Stages Start Phase 8Application Documents4 Dec 2023View
Approved 015 Development Stages Start Phase 10Application Documents4 Dec 2023View
Approved 016 Development Stages Start Phase 12Application Documents4 Dec 2023View
Approved 011 Development Stages Start Phase 1aApplication Documents4 Dec 2023View
Approved 017 Restoration Sections Sheet1(1)Application Documents4 Dec 2023View
Approved 001 Contour PlanApplication Documents4 Dec 2023View
Approved under MW.0093/20 App 018 Restoration Sections Sheet2 A1(1)Application Documents4 Dec 2023View
Approved 018 Restoration Sections Sheet2 A1Application Documents4 Dec 2023View
Approved App 020 LocationApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Awbs Zone Nov 2014Application Documents4 Dec 2023View
Approved Base Of Mineral May 2012 Gmg003Application Documents4 Dec 2023View
Approved C10 Appendix C Sfra Fz Maps For Gill MillApplication Documents4 Dec 2023View
Approved Chapter 13 Noise Final 24 Feb 2012Application Documents4 Dec 2023View
Approved Chapter 10 Hydrology & Flood Risk FinalApplication Documents4 Dec 2023View
Approved Figure Gm.13.1a Noise Sensitive Receptors And Monitoring LocationsApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Cond 50 Abstracted Waters Scheme Final July 2015 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Gill Mill Lighting October 2014 FinalApplication Documents4 Dec 2023View
Approved Gml 025 Revc Lodge Elevations@500(1)Application Documents4 Dec 2023View
Approved Gml 026 Reva Beef Unit N&s Elevations@750Application Documents4 Dec 2023View
Approved Gml 027 Reva Beef Unit E&w Elevations@750Application Documents4 Dec 2023View
Approved Gml 028 Revb Beef Unit Layout 500 At A3Application Documents4 Dec 2023View
Approved M2500 Recycling Plant Plan(1)Application Documents4 Dec 2023View
Approved Mineralthickness May 2012 Gmg004Application Documents4 Dec 2023View
Approved Planning Statement Final July 2012Application Documents4 Dec 2023View
Approved under MW.0093/20 App Plant Survey Email 29 May 2009Application Documents4 Dec 2023View
ApprovedRecycled Plant App B FlocculentApplication Documents4 Dec 2023View
Approved under MW.0093/20 App Sm Zone Nov 2014Application Documents4 Dec 2023View
Approved under MW.0093/20 App Transport Statement June 09Application Documents4 Dec 2023View
Approved Gill Mill Cond 17 Aftercare Scheme Phase 6 Feb 2022 FinalApplication Documents4 Dec 2023View
Approved under MW.0093/20 Barn Owl Mitigation Scheme For Phase 2 Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 24 Of Permission 13 0530p Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved Chapter 9 Of The Environmental Statement, Including Section 9 (site Restoration Scheme) And Table 9.14Application Documents4 Dec 2023View
Approved Chapter 11 Of The Environmental Statement ‘hydrogeology And Ground Conditions’, Including The Mitigation Measures Set Out In Section 6.2 And 8.1Application Documents4 Dec 2023View
Approved under MW.0093/20 Conceptual Drainage Layout Plan Drawing No. H8202 001Application Documents4 Dec 2023View
Approved under MW.0093/20 Drawing No 3951 Gdl Xx Xx Dr C 003 P1 Proposed Conveyor Crossing 1 Location Plan And SectionsApplication Documents4 Dec 2023View
Approved Ecoconsult Ecology Walkover Gill Mill Phase 6 01.04.2022Application Documents4 Dec 2023View
Approved Existing Layout 2013 Drawing No 001 Rev 1 Dated April 2013Application Documents4 Dec 2023View
Approved under MW.0093/20 Figure 1 Recharge Trench LocationApplication Documents4 Dec 2023View
Approved under MW.0093/20 Figure 2 Recharge Trench Schematic Cross SectionApplication Documents4 Dec 2023View
Approved under MW.0093/20 Figure 4.6 High Groundwater Level Contours Dated January 2011Application Documents4 Dec 2023View
Approved under MW.0093/20 Figure 4.7 Low Groundwater Level Contours Dated January 2011Application Documents4 Dec 2023View
Approved Site & Overburden May 2012 Gmg002Application Documents4 Dec 2023View
Approved Site & Phasing May 2012 Gmg001Application Documents4 Dec 2023View
Approved under MW.0093/20 Recharge Trench Scheme Dated 09.07.2015 And Approved 19.10.2015 Pursuant To Condition 51 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Scheme For Phase 1c Dated 13th April 2016 And Approved 03.10.2016 Pursuant To Condition 16 Of Permission 130530pcm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Scheme For Phase 3 Dated May 2018 And Approved 23.08.2018 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Scheme For Phase 5 Dated 11th March 2016 Approved 03.10.2016 Pursuant To Condition 16 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Restoration Scheme Phase 3 Planting Details Dated 06.08.18Application Documents4 Dec 2023View
Approved under MW.0093/20 Standoff Protection Scheme Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 23 Of Permission 13 0530pcm (mw.0050.13)Application Documents4 Dec 2023View
Approved Technical Note March 2019Application Documents4 Dec 2023View
Approved under MW.0093/20 Tree Survey Report Dated February 2018Application Documents4 Dec 2023View
Approved Wood Clay Variation Sssi Letter 12 Aug 2020Application Documents4 Dec 2023View
Approved under MW.0093/20 Working Scheme For Phase 4 Dated August 2019 And Approved 25.10.2019 Pursuant To Condition 15 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 071 Phase 6a Working Scheme 210222Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 072 Phase 6b Working Scheme 210222Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 073 Phase 6 Restoration Proposals 210222Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 074 Phase 6 Illustrative Rest Sections A3@250 210222Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 075 Future Eco Tourism Lodges On Phases 4 And 6 200422(1)Application Documents4 Dec 2023View
Approved under MW.0093/20 Gml 075 Future Eco Tourism Lodges On Phases 4 And 6 200422Application Documents4 Dec 2023View
Approved under MW.0093/20 Illustrative Sections Through Phase 2a Lake Edges Drawing No. Gml 039Application Documents4 Dec 2023View
Approved under MW.0093/20 Illustrative Sections Through Phase 4 Restored Reedbed Drawing Number Gml 058 Dated January 2019Application Documents4 Dec 2023View
Approved under MW.0093/20 Lake Overflow Details For Phase 5 Dated February 2015 And Approved 03.10.2016 Pursuant To Condition 53 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Phase 1c Restoration Plan Drawing No. Gml0 49Application Documents4 Dec 2023View
Approved under MW.0093/20 Phase 4 Hydrological Mitigation Drawing Number Gml 057 Rev AApplication Documents4 Dec 2023View
Approved under MW.0093/20 v Phases 3 & 4 Soil Resource Plan Dated August 2019Application Documents4 Dec 2023View
Approved under MW.0093/20 Predevelopment Works Scheme Dated July 2015 And Approved 19.10.2015 Pursuant To Condition 63 Of Permission 13 0530 P Cm (mw.0050.13)Application Documents4 Dec 2023View
Approved under MW.0093/20 Aftercare Phase 5Application Documents4 Dec 2023View
Approved Application Form Dated 08 09 2020Application Documents28 Jan 2025View
Approved Application Form 19-3-2013Application Documents28 Jan 2025View
Approved Recycling Processing Plant – Application FormApplication Documents28 Jan 2025View
Approved Recycling Processing Plant - Flood Risk Assessment Appendix 6Application Documents29 Jan 2025View
Approved Gill Mill Proposed Recycling Plant Proposed Surface Water Drainage Layout - Drawing No: 22476/002/001 Rev CApplication Documents29 Jan 2025View
Approved Recycling Processing Plant - Flood Risk Assessment Appendix 5Application Documents29 Jan 2025View
Approved Recycling Processing Plant - Letter From Smith & Sons Dated 22/07/2009Application Documents29 Jan 2025View
Approved Recycling Processing Plant - Modelled Flood Extents - Drawing No: 22476/001/001Application Documents29 Jan 2025View
Approved Recycling Processing Plant - Proposed Flood Compensation Scheme - Drawing No: 22476/001/002Application Documents29 Jan 2025View
Approved Gill Mill Quarry Witney – Site Location Plan Figure 1 dated 06.05.09Application Documents29 Jan 2025View
Approved Proposed Recycling Plant at Gill Mill Quarry Witney – Flood Risk Assessment – Project Ref 22476/001 dated July 2009Application Documents29 Jan 2025View
Approved Gill Mill Proposed Recycling Plant – Location Plan – Drawing No: GML/022 dated Nov 2008Application Documents29 Jan 2025View
Approved Gill Mill Quarry Witney – Site Location Plan Figure 2 dated 06.05.09Application Documents29 Jan 2025View
Approved Gill Mill Proposed Recycling Plant – Site Plan GML/004 dated Nov 2008Application Documents29 Jan 2025View
Approved Gill Mill Proposed Recycling Plant – Planning Application Boundary GML/003 dated Nov 2008Application Documents29 Jan 2025View
Approved Gill Mill Proposed Recycling Plant – Illustrative Washing Plant GML/005 dated Nov 2008Application Documents29 Jan 2025View
Approved Processing Plant for Recycled Aggregates Supporting Statement dated December 2008Application Documents29 Jan 2025View
ApprovedArea 14 Survey 26th May 2009 Drawing No 001Application Documents29 Jan 2025View
Approved Recycling Processing Plant Appendix A – PhotographsApplication Documents29 Jan 2025View
Approved Ecological Walkover Survey And Mitigation Details For Phase 8 Dated July 2023 And Approved 01 11 2023 Pursuant To Condition 13Application Documents3 Feb 2025View
Approved Ecoconsult Bat Survey Report Gill Mill Phase 8 Tree 17.07.2023Application Documents3 Feb 2025View
Approved Ecological Walkover Survey and Mitigation Details for Phase 7 dated July 2022 and approved 06/03/2023 pursuant to condition 13 of permission 20/03176/CM (MW.0093/20)Application Documents3 Feb 2025View
Approved Arboricultural Report Survey Gill Mill Phases 7 and 8 (October 2022)Application Documents3 Feb 2025View
Approved Working Scheme For Phase 7 Dated January 2023 Condition 15Application Documents3 Feb 2025View
Approved Drawing No Gml 079 Phase 7a Working Scheme (january 2023)Application Documents3 Feb 2025View
Approved Drawing No Gml 080 Phase 7b Working Scheme (january 2023)Application Documents3 Feb 2025View
Approved Cond 15Application Documents3 Feb 2025View
Approved Gill Mill Working Scheme Cond 15 Phase 7 Final Jan 2023Application Documents3 Feb 2025View
Approved Gill Mill Working Scheme Cond 15 Phase 6 Feb 2022 Final With App(1)Application Documents4 Feb 2025View
Phases 2A & 2B Working Scheme - Drawing No: GML 033 -Phases 2A & 2B Working Scheme - Drawing No: GML 033Application Documents6 Feb 2025View
Working Scheme for Phase 2 dated 1st July 2015 and approved 25/10/2019 pursuant to Condition 15 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents6 Feb 2025View
Location Plan and Sections Proposed Crossings 1-3 - Drawing No: 3951-GDL- XX-XX-DR-C-001 P2Application Documents6 Feb 2025View
Phases 2a & 2b Hydrological Mitigation Measures Drawing No Gml 036Application Documents6 Feb 2025View
Tree Survey Report Dated February 2018(1)Application Documents6 Feb 2025View
Appendix A: Nicholsons Tree Report Working Scheme for Phase 3 dated February 2019 and approved 25/10/2019 pursuant to Condition 15 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents6 Feb 2025View
Letter From Mike Carey (amec) To Lesley Tims Dated 11 September 2013Application Documents6 Feb 2025View
Additional Information 41533 Wod Xx Xx Rp Ow 0001 A P02 Monitoring Report 2018 Final Min (gill Mill Quarry Complex Hydrological Monitoring Review No. 13 (2018))Application Documents6 Feb 2025View
Additional Information Agent Email To Ecology Occ (8th April 2022)Application Documents6 Feb 2025View
Restoration Scheme for Phase 2 dated 17th June -and approved 19/10/2015 pursuant to Condition 16 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents6 Feb 2025View
8475 001 R 01 V01 Stability Risk Assessment For Proposed Mineral Extraction Adjacent To Pylon Infrastructure (august 2022)Application Documents6 Feb 2025View
Additional Information Including Appendices A F) Submission Dated September 2013Application Documents6 Feb 2025View
App Cond 15 Working Scheme Phase 5 Final Mw.0062.16(2)Application Documents6 Feb 2025View
Programme Of Archaeological Works’ Prepared By Oxford Archaeology Dated June 2014Application Documents6 Feb 2025View
Aftercare Scheme for Phase 8 dated August 2023 and approved 18/12/2023 pursuant to Condition 17 of permission 20/03176/CM (MW.0093/20) includingApplication Documents6 Feb 2025View
Extra Info From Agents 8th December 2023Application Documents6 Feb 2025View
Bird Hide Details for Phase 8 dated 29/08/23 and approved 08/11/2023 pursuant to condition 21 of permission 20/03176/CM (MW.0093/20) including:Application Documents6 Feb 2025View
Restoration Proposals drawing number GML_056 Revision A dated July 2019Application Documents6 Feb 2025View
Restoration Scheme for Phase 5 dated 11th March 2016 approved 03/10/2016 pursuant to Condition 16 of permission 13/0530/P/CM (MW.0050/13) includingApplication Documents7 Feb 2025View
Aftercare Scheme for Phase 1c dated 25th April 2016 and approved 03/10/2016 pursuant to Condition 17 of permission 13/0530/P/CM (MW.0050/13)Application Documents7 Feb 2025View
Aftercare Scheme for Phase 3 dated February 2018 and approved 23/08/2018 pursuant to Condition 17 of permission 13/0530/P/CM (MW.0050/13)Application Documents7 Feb 2025View
Access Signage Details Scheme Dated June 2015 And Approved 19.10.2015 Pursuant To Condition 30 Of Permission 130530pcm (mw.0050.13)Application Documents7 Feb 2025View
Abstracted Waters Scheme for Phase 4 dated January 2019 and approved 03/07/2019 pursuant to condition 50 of permission 13/0530/P/CM (MW.0050/13) including:Application Documents7 Feb 2025View
Lake Overflow Details for Phase 4 approved dated August 2018 and approved 28/10/2018 pursuant to condition 53 of permission 13/0530/P/CM (MW.0050/13)Application Documents7 Feb 2025View
Ecological Walkover Survey and Mitigation Details dated July 2015 and approved 19/10/2015 pursuant to condition 62 of permission 13/0530/P/CM (MW.0050/13)Application Documents7 Feb 2025View
Approved Gill Mill Phase 6 Cond 50 FinalApplication Documents7 Feb 2025View
Figure 2 Recharge Trench Schematic Cross SectionApplication Documents11 Feb 2025View
Appendix A - Settlement Tank details dated 03/01/19Application Documents11 Feb 2025View
Condition 13 Submission Ecological Walkover Survey And Mitigation Details Dated February 2018(1)Application Documents11 Feb 2025View
Gml 093 Phase 8 Illustrative Rest Sections A3 220823Application Documents11 Feb 2025View
Gill Mill Cond 53 Lake Overflow Phase 8 Final August 2023Application Documents11 Feb 2025View
Approved Nicholsons Arboricultural Report Survey Phase 7 And 8, Gill Mill Quarry, Ducklington, Oxfordshire (18 23october 2022)Application Documents14 Feb 2025View
Approved Condition 16 Restoration Scheme Phase 7 (january 2023)Application Documents14 Feb 2025View
Approved Condition 16 Restoration Scheme Phase 7 (january 2023Application Documents14 Feb 2025View
Approved Drawing No. Gml 082 Phase 7 Illustrative Sections Through Phase 7 Reed Beds (january 2023)Application Documents14 Feb 2025View
Approved S106 Plan B (june 2014)Application Documents14 Feb 2025View
Approved Drawing No. Gml 094 Phase 4 Screen Hide Details (august 2023)Application Documents14 Feb 2025View
Approved Abstracted Waters Scheme for Phase 7 dated January 2023 and approved 06/03/2023 pursuant to condition 50 of permission 20/03176/CM (MW.0093/20) includingApplication Documents24 Feb 2025View
Approved Drawing No.GML_086 Phase 8 Restoration Proposals (May 2023)Application Documents24 Feb 2025View
Approved Drawing No. GML_093 Phase 8 Illustrative Sections through Phase 8 Reed Beds (August 2023)Application Documents24 Feb 2025View
Approved Stability Risk Assessment for Proposed Mineral Extraction Adjacent to Pylon Infrastructure (August 2022)Application Documents24 Feb 2025View
Approved Nicholsons Arboricultural Report Survey Gill Mill Phase 7 and 8 (October 2022)Application Documents24 Feb 2025View
Approved Condition 16 Restoration Scheme Phase 8 (August 2023)Application Documents24 Feb 2025View
Gill Mill Cond 53 Lake Overflow Phase 7 Final Jan 2023Application Documents24 Feb 2025View
Gml 081 Phase 7 Restoration Proposals 250123(1)Application Documents24 Feb 2025View
Gill Mill Cond 53 Lake Overflow Phase 8 Final August 2023(1)Application Documents24 Feb 2025View
Gml 073 Phase 6 Restoration Proposals Feb 22Application Documents24 Feb 2025View
Gill Mill Cond 53 Lake Overflow Phase 6 Draft Feb 2022 Final(1)Application Documents24 Feb 2025View
Gml 085 Phase 8b Working Scheme 220823Application Documents24 Feb 2025View
Gml 084 Phase 8a Working Scheme 220823Application Documents24 Feb 2025View
Gill Mill Phase 8 Cond 50 Final August 2023Application Documents24 Feb 2025View
Ecological Walkover Survey and Mitigation Details for Phase 3 dated September 2017 and approved 13/07/2018 pursuant to condition 13 of permission 13/0530/P/CM (MW.0050/13)Application Documents26 Feb 2025View
App Cond 50 Abstracted Waters Phase 5 Mw.0067.16Application Documents26 Feb 2025View
Comment Cllr Fenton Mw016523 Gill MillApplication Documents11 Dec 2023View
Mw016523 Comment Environmental HealthApplication Documents14 Dec 2023View
Comments Rights Of Way Mw.016523Application Documents22 Dec 2023View
Comments MOD 11.01.24Application Documents11 Jan 2024View
Comments Natural England 11.01.24Application Documents11 Jan 2024View
Comments Landscape 18.01.24Application Documents18 Jan 2024View
Mw.0165.23 Gill Mill S73 Biodiversity Response Jan24Application Documents2 Feb 2024View
Comments Environment Agency Mw016523 12.04.24Application Documents12 Apr 2024View
Comments Environment Agency Mw016523 071024Application Documents8 Oct 2024View
Comments Environment Agency Mw016523 181224Application Documents18 Dec 2024View
Mw.0165.23 Gill Mill S73 Biodiversity Response Jan25Application Documents15 Jan 2025View
Decision Notice for MW.0165/23Application Documents4 Feb 2025View
Approved ApplicationformApplication Documents27 Nov 2023View
Approved Arboricultural Impact Assessment Gill Mill - Phase 12 02.11.23Application Documents27 Nov 2023View
Approved under MW.0093/20 Soil Resource Plan Dated August 2019Application Documents4 Dec 2023View
Response To Environment Agency From Agent 10.06.24Application Documents12 Jun 2024View
Approved Amended Gill Mill Pond And Phase 12 S73 Statement Amend 9 Jul 2024Application Documents3 Sept 2024View
DELEGATED REPORTApplication Documents29 Jan 2025View
Approved under 16 Gill Mill Cond 16 Restoration Phase 9 Amend Sept 2025Application Documents9 Dec 2025View
Approved under 15 Gill Mill Cond 15 Phase 9 Working Scheme July 2025 With AppendixApplication Documents10 Dec 2025View
Approved under cond 17 Gill Mill Cond 17 Aftercare Scheme Phase 9 Amend Jan 2026Application Documents28 Jan 2026View
Departure FormApplication Documents5 Dec 2023View
EIAApplication Documents5 Dec 2023View
Approved under 16 Applicationform(7)Application Documents9 Dec 2025View
Approved under 15 Applicationform(8)Application Documents10 Dec 2025View
Approved under cond 17 Applicationform(9)Application Documents28 Jan 2026View
MW ADVERTApplication Documents5 Dec 2023View
M&W Agents Approval LetterApplication Documents29 Jan 2025View
Approved under 16 D.p Approval Agents Letter Mw.0067 25Application Documents9 Dec 2025View
Approved under 15 D.p Approval Agents Letter Mw.0066 25(2)Application Documents10 Dec 2025View
Approved under cond 17 D.p Approval Agents Letter Mw.0068 25Application Documents28 Jan 2026View
Approved Gml 093 Phase 12 Layout Sept 2023Application Documents27 Nov 2023View
Gml 054 Phase 3 Restoration Proposals Rev A A2 At 2500 Jul 20Application Documents27 Nov 2023View
Approved Ecoconsult Pea Survey Report Gill Mill Quarry Phase 12 03.10.2023Application Documents27 Nov 2023View
Approved under 16 Gml 103 Reva Phase 9 Restoration ProposalsApplication Documents9 Dec 2025View
Approved under 16 Gml 104 Reva Phase 9 Illustrative Rest Sections A3@250Application Documents9 Dec 2025View
Approved under 15 Gml 102 Phase 9 Working Scheme 100625Application Documents10 Dec 2025View
Variation of Permission MW.0093/20 – To vary restoration details of Phase 3 and operational use of Phase 12 Final 16 Nov 2023Application Documents27 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source

Decision & conditions

Approved
Decision Notice Mw.0093.20 Decision Notice for MW.0165/23
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.