The continuation of the regeneration of existing industrial site and buildings for waste material recycling facility of 'end of life vehicles' (ELV) including rebuilding one part of the existing building at Menlo Industrial Park, Rycote Lane, Thame, without complying with the requirements of Condition 1, in as much as to be changed in part, to allow an existing structure to be retained.
Menlo Industrial Park, Rycote Lane, Thame, OX9 2JB
The continuation of the regeneration of existing industrial site and buildings for waste material recycling facility of 'end of life vehicles' (ELV) including rebuilding one part of the existing building at Menlo Industrial Park, Rycote Lane, Thame, without complying with the requirements of Condition 1, in as much as to be changed in part, to allow an existing structure to be retained.
Reference
MW.0153/09
Agent
Mr Stone
Sign in to view all collected council fields and recorded changes.
Approved document Samples IP1000/DW100D - Details Pursuant to Condition 6 - External MaterialsApplication Documents5 Feb 2010View
Approved Plan 222:9 (Existing Site Layout and Elevations)Application Documents5 Feb 2010View
Approved Plan 222:14 Rev A dated 24.06.09 (Revised plan showing retention of building)Application Documents5 Feb 2010View
Approved Plan 222:34 (superceding plan 222:33) Drainage details for oil/chemical storage) (Details Pursuant to Condition 8 and 9 of P06/E0815/CM)Application Documents5 Feb 2010View
Approved Plan 222:30 (Details of Reinstatement of Retaining Walls and Site Capping to Hardstand Areas) Details Pursuant to Conditions 8 and 9 of P06/E0815/CM)Application Documents5 Feb 2010View
Drawing No. 222:14 Rev A dated 24 June 2009Application Documents5 Feb 2010View
Delegated Report (signed off 26.08.09)Application Documents5 Feb 2010View
Drawing No 222:15Application Documents5 Feb 2010View
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.