ApprovedCouncil status: Application Decided

Continuation of the development permitted by MW.0085/17 (17/02104/CM) (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1, 8, 9, 12, 25, 34, 42, 45, 46, 58, 60 and 67, in order to allow for a revised restoration scheme for the existing landfill site incorporating amended restoration contours and an extension of time for the completion of restoration from 2020 to 2026

Ardley Energy Recovery Facility, Middleton Stoney Road, Ardley, Oxfordshire, OX27 7AA

Oxfordshire County CouncilReference MW.0130/19Section 73

Last published check: 21 Oct 2026, 22:24. Check the council record for more recent changes.

Status and dates

Last published check: 21 Oct 2026, 22:24 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated11 Dec 2019
  3. ClosedConsultationEnded 28 Nov 2020
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApproved30 Nov 2021

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Valid date

    Published milestoneCouncil source
  2. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source
Application type
Section 73
Documents
153 published

Proposal

Continuation of the development permitted by MW.0085/17 (17/02104/CM) (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1, 8, 9, 12, 25, 34, 42, 45, 46, 58, 60 and 67, in order to allow for a revised restoration scheme for the existing landfill site incorporating amended restoration contours and an extension of time for the completion of restoration from 2020 to 2026

Reference
MW.0130/19
Agent
Avison Young

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Ecology Response Dec 20Application Documents11 Dec 2020View
  • EA Response 03 December 2020Application Documents11 Dec 2020View
  • CDC Acknowledgement Letter 2003027cmApplication Documents11 Dec 2020View
  • Consultation Response - OCC Fire And RescueApplication Documents16 Nov 2020View
  • Consultation Response - Historic EnglandApplication Documents16 Nov 2020View
  • Consultation Response - Natural EnglandApplication Documents16 Nov 2020View
  • Advert in The Oxford Times 29/10/2020Application Documents26 Oct 2020View
  • Landscape CommentsApplication Documents19 Feb 2020View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Approved Appendix 1.1 – Decision Notice ref. MW.0085.17 Decision notice MW.0085/17 Decision Notice MW.0130/19 Advert for decision of MW.0130/19
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.