Bridge Farm Quarry, Sutton Courtenay, Abingdon, OX14 4PP
Last published check: 22 Sept 2026, 08:49. Check the council record for more recent changes.
Bridge Farm Quarry, Sutton Courtenay, Abingdon, OX14 4PP
This record has no verified map location.
small extension to Bridge Farm Quarry to extract sand and gravel and restoration to agriculture and lakes with reed fringes
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Condition 41 & 42 - Approved e-mail from Julia Edwards dated 26th July 2018Application Documents | 24 Aug 2018 | View |
| Condition 22 - Approved Phases 6 & 7 Written Scheme of Investigation for an Archaeological Watching BriefApplication Documents | 14 Aug 2018 | View |
| Condition 22 - Agents Approval Letter dated 14/08/18Application Documents | 14 Aug 2018 | View |
| Condition 16 - Agents Approval Letter dated 14/08/18Application Documents | 14 Aug 2018 | View |
| Condition 15 - Approved Proposed Buffer Zones to Watercourses, Trees Plan - Drawing no. S3/HAN/13/2Application Documents | 13 Aug 2018 | View |
| Condition 15 - Agents Approval Letter dated 13/08/18Application Documents | 13 Aug 2018 | View |
| Third Supplemental S. 106 Agreement 31st May 2018Application Documents | 4 Jul 2018 | View |
| Approved Planning StatementApplication Documents | 1 Jun 2018 | View |
| Approved Outline restoration scheme - detail of eastern end of site drawing no. S3.HAN.10.47Application Documents | 1 Jun 2018 | View |
| Approved Further Information Corylus letter dated 30th March 2017Application Documents | 1 Jun 2018 | View |
| Approved Further information - To address feedback from EA January 2017Application Documents | 1 Jun 2018 | View |
| Approved unworked land adjacent to watercourses- drawing n. S3.HAN.10.48Application Documents | 1 Jun 2018 | View |
| Approved Scheme of Working & Restoration - Stage 4 - Drawing No S3.HAN.10.25AApplication Documents | 1 Jun 2018 | View |
| Approved Scheme of Working & Restoration - Stage 2 - Drawing N. S3.HAN.10.23Application Documents | 1 Jun 2018 | View |
| Approved Proposed Extension Area - Drawing No S3.HAN.10.18Application Documents | 1 Jun 2018 | View |
| Approved Further information - Soils & land quality January 2017Application Documents | 1 Jun 2018 | View |
| Approved extent of existing arable areas, stands off and buffers-drawing no. S3/HAN/51Application Documents | 1 Jun 2018 | View |
| Environment Agency second consultation responseApplication Documents | 2 Apr 2017 | View |
| Further Information - Extent of Existing Arable Areas, Stand Offs and Buffers - Drawing no. S3/10/HAN/51Application Documents | 2 Apr 2017 | View |
| Attachment 1 to Southern Gas Networks second responseApplication Documents | 12 Feb 2017 | View |
| Southern Gas Networks second responseApplication Documents | 12 Feb 2017 | View |
| Further information - Unworked land adjacent to water coursesApplication Documents | 1 Feb 2017 | View |
| Further information - Flood storage capaciity volume comparisonApplication Documents | 1 Feb 2017 | View |
| Further information - Soils & land quality January 2017Application Documents | 1 Feb 2017 | View |
| EA comments on Network Rail's 2nd responseApplication Documents | 1 Feb 2017 | View |
| Environment Agency consultation responseApplication Documents | 19 Jan 2017 | View |
| National Grid Consultation responseApplication Documents | 19 Jan 2017 | View |
| SGN consultation reply - plan showing pipes in the areaApplication Documents | 19 Dec 2016 | View |
| Rights of Way replyApplication Documents | 12 Dec 2016 | View |
| CPRE replyApplication Documents | 12 Dec 2016 | View |
| Sutton Courtenay Parish Council replyApplication Documents | 12 Dec 2016 | View |
| County Drainage Engineer replyApplication Documents | 1 Nov 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Proposed Extension Area - Phased Working Scheme - Figure 8Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Visual Assessment Plan (immediate site area) - Figure 6Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Heritage Designations - Figure 4Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Local Landscape Context Plan - Figure 2Application Documents | 18 Oct 2016 | View |
| Cross Sections - Sheet 2 - Drawing No: S3/HAN/10/35Application Documents | 18 Oct 2016 | View |
| SUPERSEDED Environmental Statement Part 2 - Technical Ecology ReportApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Agricultural Land ClassificationApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Noise AssessmentApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Representative Minimum Groundwater Contours - Drawing No: SCHYDRO1607-9-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Base of Terrace Gravels Aquifer/Top of Gault Clay - Drawing No: SCHYDRO1607-7-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Possible Historic Land Use - Drawing No: SCHYDRO1607-5-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Regional Sand & Gravel Resources, Historical Mineral Extraction & Backfilling - Drawing No: SCHYDRO1607-3-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Proposed Restoration Scheme & Surface Water Management Scheme - Drawing No: SCHYDRO1607-18-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Environment Agency Flood Map - Drawing No: SCHYDRO1607-16-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - 2001 (pre-extraction) Topographic Survey - Drawing No: SCHYDRO1607-13-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Licenced Water Abstraction - Drawing No: SCHYDRO1607-11-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Site Location - Drawing No: SCHYDRO1607-1-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - AppendicesApplication Documents | 18 Oct 2016 | View |
| Application Plan - Drawing No: S3/HAN/10/28Application Documents | 18 Oct 2016 | View |
| Planning StatementApplication Documents | 18 Oct 2016 | View |
| DP approval letter MW.0077/18Application Documents | 3 Oct 2018 | View |
| Approved DP condition 19- Approved Drawing no. S3HAN1332 Condition 19 - Outfall fromExisting Site and outfall from Phase 7 into the River ThamesApplication Documents | 3 Oct 2018 | View |
| Approved DP condition 19- Approved Drawing no. S3 HAN1310 Condition 19 - Details of Outfall Channel from PhaseApplication Documents | 3 Oct 2018 | View |
| Approved DP condition 19- Details of Drainage Works for the Control of Water Levels and the Discharge from the Proposed Lakes at BridgeApplication Documents | 3 Oct 2018 | View |
| Condition 41 & 42 - Approved Riverfields Landscaping and Aftercare Scheme Plan - Drawing no. S55m.179Application Documents | 24 Aug 2018 | View |
| Approved Cross Sections - Sheet 1 - Drawing No S3.HAN.10.34Application Documents | 1 Jun 2018 | View |
| Transport Development Control responseApplication Documents | 29 May 2017 | View |
| Network Rail further response April 2017Application Documents | 26 Apr 2017 | View |
| Town Planning Technician (Network Rail) ReplyApplication Documents | 25 Apr 2017 | View |
| Didcot Town Council second responseApplication Documents | 13 Apr 2017 | View |
| Further Information Otter Report - Applied Ecology Ltd March 2017Application Documents | 2 Apr 2017 | View |
| Historic England second responseApplication Documents | 14 Feb 2017 | View |
| Further information - Covering email - Attachment 1Application Documents | 14 Feb 2017 | View |
| Further information - Covering emailApplication Documents | 14 Feb 2017 | View |
| Further information - Covering email 2 - Attachment 2Application Documents | 14 Feb 2017 | View |
| Attachment 3 to Southern Gas Networks second responseApplication Documents | 12 Feb 2017 | View |
| Further information - To address feedback from EA regarding re-location of an overflow trench as required by NR January 2017Application Documents | 1 Feb 2017 | View |
| Further information - Outline restoration schemeApplication Documents | 1 Feb 2017 | View |
| Further information - Technical Ecology Report January 2017Application Documents | 1 Feb 2017 | View |
| Revised Departure FormApplication Documents | 18 Jan 2017 | View |
| SGN consultation reply - gas plant safety measuresApplication Documents | 19 Dec 2016 | View |
| SGN consultation replyApplication Documents | 19 Dec 2016 | View |
| Natural England ReplyApplication Documents | 12 Dec 2016 | View |
| HSE replyApplication Documents | 12 Dec 2016 | View |
| Environmental Protection Team reply - Vale of White Horse District CouncilApplication Documents | 12 Dec 2016 | View |
| Arboricultural Officer consultation replyApplication Documents | 12 Dec 2016 | View |
| Scheme of Working & Restoration - Stage 5 - Drawing No: S3/HAN/10/26AApplication Documents | 18 Oct 2016 | View |
| Scheme of Working & Restoration - Stage 3 - Drawing No: S3/HAN/10/24Application Documents | 18 Oct 2016 | View |
| Scheme of Working & Restoration - Stage 1 - Drawing No: S3/HAN/10/22Application Documents | 18 Oct 2016 | View |
| Proposed Extension Area - Drawing No: S3/HAN/10/18Application Documents | 18 Oct 2016 | View |
| Contents ListApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 3 - Non Technical SummaryApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 1 - 3Application Documents | 18 Oct 2016 | View |
| Approved DP condition 19- Approved Drawing no. S3HAN134 Condition 19 - Outfall Ditch, Culvert and Sluice LayoutApplication Documents | 3 Oct 2018 | View |
| Approved DP condition 19- Approved Drawing no. S3HAN1332 Condition 19 - Outfall fromExisting Site and outfall from Phase 7 into the River ThamesApplication Documents | 3 Oct 2018 | View |
| Approved DP condition 19-Approved Drawing no. S3 HAN 13 3 1 Condition 19 - Outfall from Phase 6 Lake to Sutton Courtenay BrookApplication Documents | 3 Oct 2018 | View |
| Approved DP condition 19- Drawing no. S3HAN1311 Condition 19 - Location of proposed channelsApplication Documents | 3 Oct 2018 | View |
| Condition 41 & 42 - Approved Landscaping & Outline Aftercare (Ref. Planning Conditions 41 & 42) File Ref. S055.a Dated July 2017Application Documents | 24 Aug 2018 | View |
| Condition 41 & 42 - Agents Approval letter dated 24/08/18Application Documents | 24 Aug 2018 | View |
| Condition 22 - Approved Phase 5 Written Scheme of Investigation Archaeological ExcavationApplication Documents | 14 Aug 2018 | View |
| Condition 16 - Approved Condition 16 Method Statement dated July 2017Application Documents | 14 Aug 2018 | View |
| Condition 15 - Approved Specification for Boundary Fencing - Barbed Wire Plan Drawing no. FDS-6Application Documents | 13 Aug 2018 | View |
| Condition 15 - Approved Method Statement for the protection of woodland, trees etc. (Revised 11/07/18)Application Documents | 13 Aug 2018 | View |
| Routeing Agreement 31st May 2018Application Documents | 4 Jul 2018 | View |
| Planning Obligation 31st May 2018Application Documents | 4 Jul 2018 | View |
| Decision noticeApplication Documents | 1 Jun 2018 | View |
| Approved Outline restoration scheme drawing no. S3.HAN.10.21 REV. FApplication Documents | 1 Jun 2018 | View |
| Approved Further Information Otter Report - Applied Ecology Ltd March 2017Application Documents | 1 Jun 2018 | View |
| Approved Further information - To address feedback from EA regarding re-location of an overflow trench as required by NR January 2017Application Documents | 1 Jun 2018 | View |
| Approved Dust Control Scheme10.07.07Application Documents | 1 Jun 2018 | View |
| Approved Scheme of Working & Restoration - Stage 5 - Drawing No S3.HAN.10.26AApplication Documents | 1 Jun 2018 | View |
| Approved Scheme of Working & Restoration - Stage 3 - Drawing No. S3.HAN.10.24Application Documents | 1 Jun 2018 | View |
| Approved Scheme of Working & Restoration - Stage 1 - Drawing No S3.HAN.10.22Application Documents | 1 Jun 2018 | View |
| Approved Further information - Flood storage capaciity volume comparisonApplication Documents | 1 Jun 2018 | View |
| Approved Cross Sections - Sheet 2 - Drawing No S3.HAN.10.35Application Documents | 1 Jun 2018 | View |
| Approved Application Plan - Drawing No S3.HAN.10.28Application Documents | 1 Jun 2018 | View |
| Approved application form dates 15.09.16Application Documents | 1 Jun 2018 | View |
| County Ecology Officer response May 2017Application Documents | 2 Jun 2017 | View |
| Environment Agency response May 2017Application Documents | 2 Jun 2017 | View |
| Natural England further response April 2017Application Documents | 26 Apr 2017 | View |
| National Grid further response April 2017Application Documents | 26 Apr 2017 | View |
| Signed Site Memo & Location of Site NoticesApplication Documents | 25 Apr 2017 | View |
| Environment Agency response April 2017Application Documents | 10 Apr 2017 | View |
| Southern Fas Networks further responseApplication Documents | 7 Apr 2017 | View |
| County Archaeologist responseApplication Documents | 7 Apr 2017 | View |
| Further Information Corylus letter dated 30th March 2017Application Documents | 2 Apr 2017 | View |
| Further information - Covering email - Attachment 2Application Documents | 14 Feb 2017 | View |
| Further information - Covering email 2 - Attachment 1Application Documents | 14 Feb 2017 | View |
| Further information - Covering email 2Application Documents | 14 Feb 2017 | View |
| Attachment 2 to Southern Gas Networks second responseApplication Documents | 12 Feb 2017 | View |
| VoWH DC Environmental Protection Team further responseApplication Documents | 12 Feb 2017 | View |
| Further information - Outline restoration scheme - detail of eastern end of siteApplication Documents | 1 Feb 2017 | View |
| Further information - To address feedback from EA January 2017Application Documents | 1 Feb 2017 | View |
| Network Rail 2nd consultation responseApplication Documents | 19 Jan 2017 | View |
| National Grid holding consultation replyApplication Documents | 19 Dec 2016 | View |
| Ecology Officer consultation replyApplication Documents | 19 Dec 2016 | View |
| Environmental Strategy Officer consultation responseApplication Documents | 19 Dec 2016 | View |
| Didcot Town Council replyApplication Documents | 12 Dec 2016 | View |
| Network Rail replyApplication Documents | 12 Dec 2016 | View |
| MOD ReplyApplication Documents | 12 Dec 2016 | View |
| Historic England ReplyApplication Documents | 12 Dec 2016 | View |
| Vale of White Horse District Council replyApplication Documents | 12 Dec 2016 | View |
| Archaeology consultation replyApplication Documents | 12 Dec 2016 | View |
| Environmental Health Officer reply - SODCApplication Documents | 12 Dec 2016 | View |
| Oxford Green Belt Network replyApplication Documents | 15 Nov 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Outline Restoration Scheme - Figure 9Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Viewpoints Within the Wider Landscape - Figure 7Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Landscape Character Types - Figure 5Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Site Context Plan - Figure 3Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Location Plan - Figure 1Application Documents | 18 Oct 2016 | View |
| Cross Sections - Sheet 1 - Drawing No: S3/HAN/10/34Application Documents | 18 Oct 2016 | View |
| Scheme of Working & Restoration - Stage 4 - Drawing No: S3/HAN/10/25AApplication Documents | 18 Oct 2016 | View |
| Scheme of Working & Restoration - Stage 2 - Drawing No: S3/HAN/10/23Application Documents | 18 Oct 2016 | View |
| SUPERSEDED Outline Restoration Scheme - Drawing No: S3/HAN/10/21EApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Desk Based AssessmentApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Stability Analysis Adjacent to Railway Bridge Farm Extension 2016Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Routeing AgreementApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 2 - Dust Control SchemeApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Representative Average Groundwater Contours - 19/11/2010 - Drawing No: SCHYDRO1607-8-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Inferred Isopachytes of In Situ Mineral Thickness - Drawing No: SCHYDRO1607-6-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Landfill Sites within 5km - Drawing No: SCHYDRO1607-4-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Regional Geology - Drawing No: SCHYDRO1607-2-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Environment Agency Surface Water Flood Map - Drawing No: SCHYDRO1607-17-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Environment Agency Fluvial Flood Map - Drawing No: SCHYDRO1607-15-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Local Hydrological Setting - Drawing No: SCHYDRO1607-14-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Environmental Receptors within 5km - Drawing No: SCHYDRO1607-12-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 7 - Representative Maximum Groundwater Contours - Drawing No: SCHYDRO1607-10-BApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8 - Viewpoints Sheets 1 - 9Application Documents | 18 Oct 2016 | View |
| Statement of Community InvolvementApplication Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 8Application Documents | 18 Oct 2016 | View |
| Environmental Statement Part 1 - Chapter 4 - 6Application Documents | 18 Oct 2016 | View |
| Application FormApplication Documents | 18 Oct 2016 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.