Details Pursuant to Condition 19 (Prior to commencement of each phase of restoration details of the location of the temporary perimeter ditches to collect surface water run-off and the location of the temporary settlement lagoon (identified in Para. 9.9 of the Flood Risk Assessment by Abington Consulting dated 13/6/12) shall be submitted to and approved by the Mineral Planning Authority) of Planning Permission P12/S1461/CM (MW.0101/12)
Land next to Sewage Works, Moorend Lane, Thame, OX9 3HW
Details Pursuant to Condition 19 (Prior to commencement of each phase of restoration details of the location of the temporary perimeter ditches to collect surface water run-off and the location of the temporary settlement lagoon (identified in Para. 9.9 of the Flood Risk Assessment by Abington Consulting dated 13/6/12) shall be submitted to and approved by the Mineral Planning Authority) of Planning Permission P12/S1461/CM (MW.0101/12)
Reference
MW.0122/13
Agent
Gill Pawson
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.