Continuation of the development permitted by MW.0130/19 (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1 and 3, in order to allow a maximum annual throughput at the Energy Recovery Facility of 378 000 tonnes
Continuation of the development permitted by MW.0130/19 (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1 and 3, in order to allow a maximum annual throughput at the Energy Recovery Facility of 378 000 tonnes
Reference
MW.0096/22
Agent
Mr Richard Kevan
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.