ApprovedCouncil status: Application Decided

Continuation of the development permitted by MW.0044/08 (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1 and 3, in order to allow an import of 326 300 tonnes per annum to the Energy Recovery Facility

Ardley Energy Recovery Facility, Middleton Stoney Road, Ardley, Oxfordshire, OX27 7AA

Oxfordshire County CouncilReference MW.0085/17Section 73

Last published check: 22 Oct 2026, 11:03. Check the council record for more recent changes.

Status and dates

Last published check: 22 Oct 2026, 11:03 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated9 Oct 2017
  3. ClosedConsultationEnded 9 Nov 2017
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApproved22 Jun 2018

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source
Application type
Section 73
Documents
113 published

Proposal

Continuation of the development permitted by MW.0044/08 (the construction and operation of an energy from waste and combined heat and power facility together with associated office, visitor centre and bottom ash recycling facilities, new access road and weighbridge facilities and the continuation of landfill operations and landfill gas utilisation with consequent amendments to the phasing and final restoration landform of the landfill surface, water attenuation features and improvements to the existing household waste recycling centre) without complying with conditions 1 and 3, in order to allow an import of 326 300 tonnes per annum to the Energy Recovery Facility

Reference
MW.0085/17
Agent
Joanna Freyther

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Approved Letter from Grant Scott to David Periam dated 19th March 2014Application Documents1 Feb 2019View
  • Approved No. 2.3Application Documents1 Feb 2019View
  • Approved item 7A planning support statement comments,Application Documents1 Feb 2019View
  • Approved Planning Drawing South West Pond 4262 20 02 01 13 CL G 1415Application Documents8 Jan 2019View
  • Approvedletter from Rob Durham dated 9th August 2013Application Documents8 Jan 2019View
  • Approved Data Collection document by HerongrangeApplication Documents8 Jan 2019View
  • Approved_No.3.2Application Documents8 Jan 2019View
  • Approved_No.2.2Application Documents8 Jan 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Original application MW.0044.08 decision notice inc approved NMA letters Decision Notice with NMA letter dated 08/04/19 Decision Notice With NMA Agent Letter Approval MW.006.20
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.