ApprovedCouncil status: Application Decided

Section 73 application to continue the development without complying with Condition 1 (approved plans and documents) of planning permission MW.0063/17 (proposed amendment of an Anaerobic Digestion Facility) to allow for the replacement of the existing digestor tanks roofs with a reinforced high-tensile strength design and installation of a permanent backup generator

Wallingford Anaerobic Digestor Facility

Oxfordshire County CouncilReference MW.0030/23Section 73

Last published check: 14 Nov 2026, 04:37. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 14 Nov 2026, 04:37 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated6 Feb 2023
  3. ClosedConsultationEnded 15 Apr 2023
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApproved9 Jun 2023

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source
Application type
Section 73
Documents
43 published

Proposal

Section 73 application to continue the development without complying with Condition 1 (approved plans and documents) of planning permission MW.0063/17 (proposed amendment of an Anaerobic Digestion Facility) to allow for the replacement of the existing digestor tanks roofs with a reinforced high-tensile strength design and installation of a permanent backup generator

Reference
MW.0030/23
Agent
Imogen Scotney

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Approved Ecological Appraisal Dated 17.11.2011Application Documents23 Feb 2023View
  • Approved Flood Risk Assessment Dated November 2011Application Documents23 Feb 2023View
  • Approved Landscape And Visual Appraisal Version 2 Dated 17.11.2011Application Documents23 Feb 2023View
  • Approved Surface Water Drainage Scheme Dated January 2012Application Documents23 Feb 2023View
  • Approved Revised Elevations Drawing no. B301 1000 C002 Revision 2 dated 18/01/2017;Application Documents23 Feb 2023View
  • Approved Traffic Management General Arrangment Drawing no B301 1000-C013 Revision 3 dated 24/03/2016Application Documents23 Feb 2023View
  • Approved Amended Site Access To Prevent Right Turners General Arrangement Drawing No 9w9706 Cadf Sk001 Dated 13.10.2011Application Documents23 Feb 2023View
  • Approved Amended Site Access To Prevent Right Turners Swept Path Analysis Drawing No 9w9706 Cadf Tr001 Dated 13.10.2011Application Documents23 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Decision Notice MW.0030/23
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.