WithdrawnCouncil status: Application Decided

A flood alleviation scheme to reduce flood risk in Oxford, comprising: Construction of a new two stage channel from the confluence of the Botley and Seacourt Streams, extending south easterly to north Kennington; Floodwalls to the north of Botley Road, at Seacourt Park and Ride and adjacent to Bullstake Close allotments; Floodgates at Helen Road, Henry Road and Seacourt Park and Ride; Flood defences at New Hinksey between Abingdon Road in the west and the River Thames in the East, Ferry Hinksey Road and north of South Hinksey; Control Structures at Bulstake Stream, Eastwyke Ditch, Hinksey Pond, Redbridge Stream and Cold Harbour; Bridges and culverts to cross highways and footpaths maintaining access routes; Spillways, embankments, low flow control structure, modifications to Seacourt Stream, ford crossings, channel clearance, ditch widening and deepening, removal of weir and installation of telemetry cabinets; Repairs to existing walls along Osney Stream and in Hinksey Park. The creation of new and improved habitat for flora, fauna and fisheries, and change of use of land to provide exchange for existing open space. Works will include extraction of some sand and gravel for reuse on the site and exportation from the site

North of the A420 Botley Road to south of the A423 ring road, running predominantly between the A34 to the west & the Oxford to London railway line to the east, including land between the A4144 Abingdon Road to the to the west & the River Thames...

Oxfordshire County CouncilReference MW.0028/18Planning Application

Last published check: 21 Oct 2026, 23:25. Check the council record for more recent changes.

Status and dates

Last published check: 21 Oct 2026, 23:25 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated23 Apr 2018
  3. ClosedConsultationEnded 22 Jan 2019
  4. Not publishedTarget decision dateNo date on council record
  5. ClosedWithdrawnApplication Decided

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Valid date

    Published milestoneCouncil source
  2. Consults Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Target committee date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Determination Date

    Published milestoneCouncil source
Application type
Planning Application
Documents
451 published

Proposal

A flood alleviation scheme to reduce flood risk in Oxford, comprising: Construction of a new two stage channel from the confluence of the Botley and Seacourt Streams, extending south easterly to north Kennington; Floodwalls to the north of Botley Road, at Seacourt Park and Ride and adjacent to Bullstake Close allotments; Floodgates at Helen Road, Henry Road and Seacourt Park and Ride; Flood defences at New Hinksey between Abingdon Road in the west and the River Thames in the East, Ferry Hinksey Road and north of South Hinksey; Control Structures at Bulstake Stream, Eastwyke Ditch, Hinksey Pond, Redbridge Stream and Cold Harbour; Bridges and culverts to cross highways and footpaths maintaining access routes; Spillways, embankments, low flow control structure, modifications to Seacourt Stream, ford crossings, channel clearance, ditch widening and deepening, removal of weir and installation of telemetry cabinets; Repairs to existing walls along Osney Stream and in Hinksey Park. The creation of new and improved habitat for flora, fauna and fisheries, and change of use of land to provide exchange for existing open space. Works will include extraction of some sand and gravel for reuse on the site and exportation from the site

Reference
MW.0028/18
Agent
Mr Harding

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Superseded - Landscape and Habitat Management Plan Area 4 Sheet 5 of 6 - Drg No. 155 Rev 07Application Documents2 May 2018View
  • Superseded - Landscape and Habitat Management Plan Area 4 Sheet 4 of 6 - Drg No. 154 Rev 07Application Documents2 May 2018View
  • Superseded - Landscape and Habitat Management Plan Area 3 Sheet 3 of 6 - Drg No. 153 Rev 07Application Documents2 May 2018View
  • Superseded - Landscape and Habitat Management Plan Area 1 Sheet 1 of 6 - Drg No. 151 Rev 07Application Documents2 May 2018View
  • Superseded - General Scheme Overview - Drg No. 0027 Rev P01Application Documents2 May 2018View
  • Superseded - GA of New Channel Between Devil's Backbone to Coldharbour Bridge - Drg No. 4200 Rev P03Application Documents2 May 2018View
  • GA of Modifications to Hinksey Drain Between Oar Bridges to A423 Railbridge - Drg No. 4460 Rev P04Application Documents2 May 2018View
  • GA of Floodwall at Osney Mead Industrial Estate - Drg No. 3420 Rev P03Application Documents2 May 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.