Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Shipton-on-Cherwell Quarry, Bunkers Hill, Shipton-on-Cherwell, Kidlington, OX5 3BA
Shipton-on-Cherwell Quarry, Bunkers Hill, Shipton-on-Cherwell, Kidlington, OX5 3BA
This record has no verified map location.
Section 73 application to continue the development permitted by planning permission no. 19/00022/CM (MW.0001/19) (Demolition and recycling on site of derelict buildings, structures and works; Extraction of limestone (as aggregate and building stone) within permitted mineral extraction area; Re-establishment of rail sidings and construction of new vehicular access roads; Importation and deposit of inert materials to raise ground levels above groundwater level to facilitate quarry restoration for commercial habitat creation and amenity use; Construction of Rail Aggregate Depot on 2.6 hectares (6.5 acres) with associated concrete batching plant (class B2) and aggregate storage and ancillary structures; Change of use of 6.1 hectares (15 acres) to Rails Storage Depot comprising of storage of rail freight materials; Temporary change of use of 16.3 hectares (40.2 acres) of disused quarry to class B8 storage and distribution for motor vehicle storage for a period of 15 years operation; and erection of one temporary Class B8 storage building (to include use as motor vehicle Pre-Delivery Inspection (PDI)), including construction of hardstanding, fencing, and other ancillary works (floorspace totalling 3,716 sq.m.) for a period of 15 years operation; Permanent change of use of 2.5 hectares (6.2 acres) of disused quarry to Class B8 storage and distribution, and erection of two Class B8 storage buildings, including construction of hardstanding, fencing and other ancillary works (floorspacing totalling 7,435 sq.m); Establishment of wildlife and geological conservation and restoration areas on 35.7 ha; Change of use of 16.3 hectares (40.2 acres) of disused quarry to forestry timber cropping (after cessation of temporary B8 use); Improvements to A4260/A4095 junctions; Associated landscape and infrastructure works.) without complying with condition 5 (end date for the importation of restoration materials by road) in order to enable the continuation and completion of restoration of the quarry for further 18 months
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Approved under MW.0001/19 Application Form Dated 15.03.16Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 13.08.15Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 07.07.15Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 06.10.16Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Aerial Photograph Ref No. K.0117 09 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Advisory Lorry Routing Dated October 2012Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Transport Statement August 2011Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Supporting Planning Statement Dated August 2011 RevaApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Statement Of Community Involvement Dated August 2006Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Site PhotographsApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Scheme Of Filling Plan Drawing No. K.0117 11 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Reptile ResultsApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Reptile Presence Likely Absence Survey Dated 29.06.15Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Reptile Mitigation Plan Dated March 2016Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Reptile Fencing PositionsApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Reptile Fencing & Schedule 1 Bird Exclusion Zone Plan Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Report On Investigations For And Extension Of Excavations Dated July 2006Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Unit 2 Floorplan Plan Drawing No. K.0117 34 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Unit 2 Elevations Plan Drawing No. K.0117 28 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Unit 1 Floorplan Plan Drawing No. K.0117 33 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Unit 1 Elevations Plan Drawing No. K.0117 27 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Schedule Of Staged Activities And Scheme Pursuant To Condition 26 & 36 Dated 14.04.10Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Pdi Unit Floorplan Plan Drawing No. K.0117 32 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Pdi Unit Elevations Plan Drawing No. K.0117 26 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Geological Exposures Plan Drawing No. K.0117 24 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Excavation Area And Cross Section Locations Plan Drawing No. K.0117 14 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Aggregate Depot Layout Plan Drawing No. K.0117 29 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Aggregate Depot Elevations Plan Drawing No. K.0117 30 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Proposed Access Arrangement Plan Drawing No. K.0117 13 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Primary Contours Existing Levels Darwing No. K.0117 10 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Planningsstatement Dated August 2007Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Planning Statement Ref Crm 007.002 Dated 12.02.10Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Planning Statement Dated 27.11.17Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Planning Application & Ownership Areas Plan Drawing No. Plan 4 Dated July 2011Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Plan Showing Fill And Cut Area & Cross Section Drawing No. K.0117 18 3Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Phased Operational Schedule Dated 27.02.12Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Phase 1 Habitat Drawing No. D.001Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Noise And Vibration Monitoring Locations K.0118 27 1aApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Letter From Veronique Bensadou Dated 24.06.10 Plan Crm.003.004 001 (proposed Contour Plan Dated June 2010)Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Interim Restored Uses Masterplan Drawing No. K.0117 48 5Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Interim Landscape Masterplan Drawing No. K.0117 22 44Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Groundwater Monitoring Plan Ref. Jer7612 Rev4 Dated September 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Final Restored Uses Masterplan Drawing No. K.0117 53 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Final Landscape Masterplan Drawing No. K.0118 78 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Ecological Mitigation And Management Plan Pursuant To Condition 41Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 9 Plan Drawing No. K.0117 52 1Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 8 Plan Drawing No. K.0117 25 8dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 7 Plan Drawing No. K.0117 07 5Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 6 Plan Drawing No. K.0117 25 6dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 5 Plan Drawing No. K.0117 25 5dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 4 Plan Drawing No. K.0117 25 4dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 3 Plan Drawing No. K.0117 25 3dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 2 Plan Drawing No. K.0117 25 2eApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Phase 1 Plan Drawing No. K.0117 25 1dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Development Construction Programme Baseline Plan Drawing No. K.0117 25 0dApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Desk Study Report & Site Remediation Strategy Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Design And Access Statement Dated August 2007Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cross Sections Through Northern Part Of Quarry Drawing No. K.0117 15 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cross Sections Through Eastern Part Of Quarry Plan Drawing No. K.0117 16 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cross Sections 6, 7, 8 & 9 Plan Drawing No. K.0117 21 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cross Sections 3, 4 & 5 Plan Drawing No. K.0117 20 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cross Sections 1 & 2 Plan Drawing No. K.0117 19 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Covering Letter Dated 06.10.16Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Cover Letter Dated 20.12.18Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Contours And Proposed Direction Of Quarry Development Plan Drawing No. K.0117 17 2Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 44 Storage Of Limestone Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 41 Translocation Of Reptiles May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 37 Lighting Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 35b Disposal Of Foul Sewage Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 35a Surface Water Drainage Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 16 Dust Dated May 2009Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 15 Advisory Lorry Routeing (may 2009)Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Condition 10 Surfacing Of Access (may 2009)Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Breeding & Winter Survey ResultsApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Bat Survey SummaryApplication Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Approved Planning Statement (amended 28.06.16)Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 27.11.17Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 22.08.11Application Documents | 16 Jan 2025 | View |
| Approved under MW.0001/19 Application Form Dated 20.12.18Application Documents | 16 Jan 2025 | View |
| Consultation Response Network RailApplication Documents | 6 Feb 2025 | View |
| Consultation Response Prow OccApplication Documents | 6 Feb 2025 | View |
| Consultation Response West Oxon Dc PlanningApplication Documents | 6 Feb 2025 | View |
| Consultation Response Natural EnglandApplication Documents | 6 Feb 2025 | View |
| Consultation Response (Feb 2025) - Shipton-on-Cherwell and Thrupp Parish CouncilApplication Documents | 25 Feb 2025 | View |
| Consultation Response (Feb 2025)- Public Health OCCApplication Documents | 25 Feb 2025 | View |
| Consultation Response (Feb 2025) - Cherwell DCApplication Documents | 26 Feb 2025 | View |
| Consultation Response - Biodiversity OCCApplication Documents | 31 Mar 2025 | View |
| Consultation Response (07May25) - EAApplication Documents | 8 May 2025 | View |
| Additional Information (22May25) - Bat Box NoteApplication Documents | 22 May 2025 | View |
| Consultation Response (19Jun25) - Biodiversity OCCApplication Documents | 16 Jun 2025 | View |
| Consultation Response (09Apr25) - Landscape OCCApplication Documents | 3 Oct 2025 | View |
| Consultation Response (01Oct25) - Highways OCCApplication Documents | 3 Oct 2025 | View |
| M&W AdvertApplication Documents | 16 Jan 2025 | View |
| Application FormApplication Documents | 15 Jan 2025 | View |
| Consultation Response (Feb 2025) - Environmental Health Officer Cherwell District Council 14/02/2025Application Documents | 14 Feb 2025 | View |
| Planning Statement Dec 24Application Documents | 15 Jan 2025 | View |
| Departure FormApplication Documents | 15 Jan 2025 | View |
| EIAApplication Documents | 15 Jan 2025 | View |
| EIA FormApplication Documents | 17 Jan 2025 | View |
| Departure FormApplication Documents | 17 Jan 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.