Works to various tress as specified by Steve Kennerley in the Marston Conservation Area (as amended).1 Leylandii Fell (all): dense Leylandii hedge of ~7 trees which overhang garage and obstruct light to other trees on multiple properties2 Rowan Prune: Raise canopy to 3m to improve light to nearby small trees3 Maple Prune: Raise canopy to 3m to improve light to nearby small trees4 Elder Prune: Raise canopy to 3m to improve light to nearby small trees5 Cedar Fell: Half dead from previously adjacent/overhanging Leylandii (as amended 29.06.2026)6 Yew Prune: Remove low hanging branches to raise canopy to 2.5m7 Scots Pine Fell: Tree damaged from bark ring (previous owner)
33 Oxford Road Old Marston Oxford Oxfordshire OX3 0PQ
Oxford City CouncilReference 26/01170/CATWorks to Trees in Conservation Area
Last published check: 27 Sept 2026, 18:19. Check the council record for more recent changes.
Works to various tress as specified by Steve Kennerley in the Marston Conservation Area (as amended).1 Leylandii Fell (all): dense Leylandii hedge of ~7 trees which overhang garage and obstruct light to other trees on multiple properties2 Rowan Prune: Raise canopy to 3m to improve light to nearby small trees3 Maple Prune: Raise canopy to 3m to improve light to nearby small trees4 Elder Prune: Raise canopy to 3m to improve light to nearby small trees5 Cedar Fell: Half dead from previously adjacent/overhanging Leylandii (as amended 29.06.2026)6 Yew Prune: Remove low hanging branches to raise canopy to 2.5m7 Scots Pine Fell: Tree damaged from bark ring (previous owner)
Reference
26/01170/CAT
Alternative references
PP-14931069
Ward
Marston Ward
Parish
Old Marston Parish Council
Agent
Steve Kennerley
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.