Council planning record

Proposed internal repairs to include doors, walls, floors, ceilings, cornices, fireplaces, panelling and other decorative timber elements, and structural repairs at basement level. Insertion of a platform lift between basement and first floor levels. Works to improve fire safety including alterations to doors and insertion of fire partitions and curtains. Replacement of MEP services and redecoration throughout. Alterations to internal layout to create new WCs and welfare facilities at basement level. Insertion of a glazed partition and jib door at ground floor level. Installation of new fixed furniture. Removal of modern partitions and mezzanine. Secondary glazing. External repairs to include cleaning and repair of masonry detailing and windows. Roof repairs including replacement slate and leadwork. Alterations to rainwater goods and external drainage. New roof insulation and roof access system. (Revised description).

74 High Street Oxford Oxfordshire OX1 4BG

DecidedReference: 26/00842/LBCOxford City Council

Last published check: 27 Sept 2026, 19:33. Check the council record for more recent changes.

Application location

74 High Street Oxford Oxfordshire OX1 4BG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
2 Apr 2026
Validated
15 Apr 2026
Determination deadline
10 Jun 2026
Local authority
Oxford City Council

Application overview

Proposed internal repairs to include doors, walls, floors, ceilings, cornices, fireplaces, panelling and other decorative timber elements, and structural repairs at basement level. Insertion of a platform lift between basement and first floor levels. Works to improve fire safety including alterations to doors and insertion of fire partitions and curtains. Replacement of MEP services and redecoration throughout. Alterations to internal layout to create new WCs and welfare facilities at basement level. Insertion of a glazed partition and jib door at ground floor level. Installation of new fixed furniture. Removal of modern partitions and mezzanine. Secondary glazing. External repairs to include cleaning and repair of masonry detailing and windows. Roof repairs including replacement slate and leadwork. Alterations to rainwater goods and external drainage. New roof insulation and roof access system. (Revised description).

Proposal details

Reference
26/00842/LBC
Alternative references
PP-14709996
Ward
Holywell Ward
Agent
Mr. Mark Pearce

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 141 of 141

DocumentPublishedAction
Delegated reportReport · PDF24 Jun 2026View
DecisionDecision · PDF24 Jun 2026View
Document issue recordOther · PDF15 Apr 2026View
First floor planApproved Plan · PDF15 Apr 2026View
Ground floor details sheet 1Approved Plan · PDF15 Apr 2026View
Ground floor planApproved Plan · PDF15 Apr 2026View
Basement drainage planApproved Plan · PDF15 Apr 2026View
Basement details sheet 1Approved Plan · PDF15 Apr 2026View
Basement planApproved Plan · PDF15 Apr 2026View
Second floor planApproved Plan · PDF15 Apr 2026View
Ground floor - proposed small power & data strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed containment layoutApproved Plan · PDF15 Apr 2026View
Ground floor - proposed containment layoutApproved Plan · PDF15 Apr 2026View
Ground floor ? proposed heating services layout sheet 1Approved Plan · PDF15 Apr 2026View
Ground floor ? proposed ventilation services layout sheet 1Approved Plan · PDF15 Apr 2026View
Ground floor ? proposed ventilation services layout sheet 1Approved Plan · PDF15 Apr 2026View
First floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed small power & data strategy layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed small power & data strategy layoutApproved Plan · PDF15 Apr 2026View
Ground floor ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Ground floor ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Ground floor ? proposed domestic water services layout sheet 1Approved Plan · PDF15 Apr 2026View
First floor - proposed containment layoutApproved Plan · PDF15 Apr 2026View
First floor - proposed containment layoutApproved Plan · PDF15 Apr 2026View
Frist floor ? proposed heating services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed heating services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed ventilation services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed domestic water services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed domestic water services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Frist floor ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Second floor - proposed small power & data strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
Second floor - proposed containment layoutApproved Plan · PDF15 Apr 2026View
Second floor ? proposed heating services layout sheet 1Approved Plan · PDF15 Apr 2026View
Second floor ? proposed ventilation services layout sheet 1Approved Plan · PDF15 Apr 2026View
Second floor ? proposed domestic water services layout sheet 1Approved Plan · PDF15 Apr 2026View
Second floor ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Basement level - proposed small power & data strategy layoutApproved Plan · PDF15 Apr 2026View
Basement level - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Basment level - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Basement level - proposed security strategy layoutApproved Plan · PDF15 Apr 2026View
Basment level - proposed containment layoutApproved Plan · PDF15 Apr 2026View
Basement level ? proposed heating services layout sheet 1Approved Plan · PDF15 Apr 2026View
Basement level ? proposed ventilation services layout sheet 1Approved Plan · PDF15 Apr 2026View
Basement level ? proposed domestic water services layout sheet 1Approved Plan · PDF15 Apr 2026View
Basement level ? proposed above ground drainage services layout sheet 1Approved Plan · PDF15 Apr 2026View
Roof level - proposed small power & data layoutApproved Plan · PDF15 Apr 2026View
Roof level - proposed lighting strategy layoutApproved Plan · PDF15 Apr 2026View
Roof level - proposed fire alarm strategy layoutApproved Plan · PDF15 Apr 2026View
Application form redactedApplication Form · PDF2 Apr 2026View
Existing ga south planning elevationApproved Plan · PDF2 Apr 2026View
Existing ga west planning elevationApproved Plan · PDF2 Apr 2026View
Existing ga planning section a-aApproved Plan · PDF2 Apr 2026View
Existing ga planning section b-bApproved Plan · PDF2 Apr 2026View
Existing ga planning section c-cApproved Plan · PDF2 Apr 2026View
Site location planApproved Plan · PDF2 Apr 2026View
Existing site block planApproved Plan · PDF2 Apr 2026View
Existing ga ground floor planApproved Plan · PDF2 Apr 2026View
Existing ga first floor planning planApproved Plan · PDF2 Apr 2026View
Existing ga second floor planning planApproved Plan · PDF2 Apr 2026View
Existing ga mezzanine floor planning planApproved Plan · PDF2 Apr 2026View
Existing ga basement floor planning planApproved Plan · PDF2 Apr 2026View
Existing ga roof planning planApproved Plan · PDF2 Apr 2026View
Existing ga north planning elevationApproved Plan · PDF2 Apr 2026View
Existing ga east planning elevationApproved Plan · PDF2 Apr 2026View
Proposed ga ground floor planning planApproved Plan · PDF2 Apr 2026View
Demolition ground floor planApproved Plan · PDF2 Apr 2026View
Proposed ground floor fire life safety planApproved Plan · PDF2 Apr 2026View
Proposed ga ground floor - floor finishes + wall types planApproved Plan · PDF2 Apr 2026View
Proposed ga first floor planning planApproved Plan · PDF2 Apr 2026View
Demolition first floor planApproved Plan · PDF2 Apr 2026View
Proposed first floor fire life safety planApproved Plan · PDF2 Apr 2026View
Proposed first floor - floor finishes + wall types planApproved Plan · PDF2 Apr 2026View
Proposed ga second floor planning planApproved Plan · PDF2 Apr 2026View
Demolition second floor planApproved Plan · PDF2 Apr 2026View
Proposed second floor fire life safety planApproved Plan · PDF2 Apr 2026View
Proposed second floor - floor finishes + wall types planApproved Plan · PDF2 Apr 2026View
Proposed ga basement floor planning planApproved Plan · PDF2 Apr 2026View
Demolition basement floor planApproved Plan · PDF2 Apr 2026View
Proposed basement floor fire life safety planApproved Plan · PDF2 Apr 2026View
Proposed basement floor - floor finishes + wall types planApproved Plan · PDF2 Apr 2026View
Proposed ga roof planning planApproved Plan · PDF2 Apr 2026View
Demolition roof planApproved Plan · PDF2 Apr 2026View
Proposed external works ga roof planApproved Plan · PDF2 Apr 2026View
Proposed external works ga north elevationApproved Plan · PDF2 Apr 2026View
Proposed external works ga east elevationApproved Plan · PDF2 Apr 2026View
Proposed external works ga south elevationApproved Plan · PDF2 Apr 2026View
Proposed external works ga west elevationApproved Plan · PDF2 Apr 2026View
Proposed ga section a-aApproved Plan · PDF2 Apr 2026View
Proposed ga section b-bApproved Plan · PDF2 Apr 2026View
Proposed ga section c-cApproved Plan · PDF2 Apr 2026View
Proposed waterproofing treatment typesApproved Plan · PDF2 Apr 2026View
Proposed typical roof insulation detailApproved Plan · PDF2 Apr 2026View
Teaching space - internal elevations n/sApproved Plan · PDF2 Apr 2026View
Library - internal elevations n/sApproved Plan · PDF2 Apr 2026View
Library - internal elevations e/wApproved Plan · PDF2 Apr 2026View
Window scheduleApproved Plan · PDF2 Apr 2026View
Proposed window secondary glazing type 01 detailsApproved Plan · PDF2 Apr 2026View
Proposed window secondary glazing type 02 detailsApproved Plan · PDF2 Apr 2026View
Existing doors - (types, legends) sheet 1Approved Plan · PDF2 Apr 2026View
Existing doors - (types, legends) sheet 2Approved Plan · PDF2 Apr 2026View
Existing doors - (types, legends) sheet 3Approved Plan · PDF2 Apr 2026View
Existing doors - (types, legends) sheet 4Approved Plan · PDF2 Apr 2026View
Door scheduleDrawing · PDF2 Apr 2026View
Proposed doors - (types, legends) sheetApproved Plan · PDF2 Apr 2026View
Proposed doors - (types, legends) sheet 2Approved Plan · PDF2 Apr 2026View
Teaching space - internal elevations e/wApproved Plan · PDF2 Apr 2026View
Proposed structure - wall chase for electrical servicesApproved Plan · PDF2 Apr 2026View
Remedial details - basement door openingApproved Plan · PDF2 Apr 2026View
Proposed steel box frameApproved Plan · PDF2 Apr 2026View
New lintels over basement brick archApproved Plan · PDF2 Apr 2026View
General notesDrawing · PDF2 Apr 2026View
Structural and civil specificationOther · PDF2 Apr 2026View
Heritage impact assessmentOther · PDF2 Apr 2026View
Outline performance specificationOther · PDF2 Apr 2026View
Room data sheetOther · PDF2 Apr 2026View
Proposed room areas scheduleApproved Plan · PDF2 Apr 2026View
Existing room areas scheduleApproved Plan · PDF2 Apr 2026View
Design and access statement - part 1Other · PDF2 Apr 2026View
Design and access statement - part 2Other · PDF2 Apr 2026View
Design and access statement - part 3Other · PDF2 Apr 2026View
Design and access statement - part 4Other · PDF2 Apr 2026View
Cil formOther · PDF2 Apr 2026View
Riba stage 3 reportOther · PDF2 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
Decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.