Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
3 Canterbury Road Oxford Oxfordshire OX2 6LU
Last published check: 27 Sept 2026, 13:05. Check the council record for more recent changes.
3 Canterbury Road Oxford Oxfordshire OX2 6LU
This record has no verified map location.
View council mapChange of use of existing rear stable block building to include part demolition, extension at ground and first floor levels and alterations to roof and elevations to create a 1 x 2 bed dwellinghouse (Use Class C3). Formation of pedestrian gated access. Raised boundary wall. Provision of private amenity space, air source heat pump with enclosure, bin and cycle stores, bollards to lane entrance and associated works and landscaping (Amended plans and description)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Ful decisionDecision · PDF | 24 Sept 2026 | View |
| Delegated reportReport · PDF | 24 Sept 2026 | View |
| Existing site planRevised Drawing · PDF | 20 Aug 2026 | View |
| Demolition ground floor planRevised Drawing · PDF | 20 Aug 2026 | View |
| Demolition elevations 1Revised Drawing · PDF | 20 Aug 2026 | View |
| Proposed site planApproved Plan · PDF | 20 Aug 2026 | View |
| Proposed ground floor planApproved Plan · PDF | 20 Aug 2026 | View |
| Proposed first floor planApproved Plan · PDF | 20 Aug 2026 | View |
| Proposed roof planApproved Plan · PDF | 20 Aug 2026 | View |
| Proposed fire escape site planRevised Drawing · PDF | 20 Aug 2026 | View |
| Proposed fire escape strategy gf planRevised Drawing · PDF | 20 Aug 2026 | View |
| Proposed fire escape strategy ff planRevised Drawing · PDF | 20 Aug 2026 | View |
| Proposed drainage strategy gf planRevised Drawing · PDF | 20 Aug 2026 | View |
| Proposed drainage strategy rf planRevised Drawing · PDF | 20 Aug 2026 | View |
| Revised design & access statementReport · PDF | 20 Aug 2026 | View |
| Sap calculationsReport · PDF | 20 Aug 2026 | View |
| Proposed elevations 1Approved Plan · PDF | 20 Aug 2026 | View |
| Proposed elevations 2Approved Plan · PDF | 20 Aug 2026 | View |
| Proposed drainage details (3of 3)Other · PDF | 6 Aug 2026 | View |
| Proposed drainage details (2 of 3)Other · PDF | 6 Aug 2026 | View |
| Proposed drainage details (1 of 3)Other · PDF | 6 Aug 2026 | View |
| Surface water catchment planOther · PDF | 6 Aug 2026 | View |
| Flood exceedance flowsOther · PDF | 6 Aug 2026 | View |
| Proposed drainage plan - general arrangementOther · PDF | 6 Aug 2026 | View |
| Revised drainage strategyOther · PDF | 6 Aug 2026 | View |
| Environment agency -flood mapOther · PDF | 21 Jul 2026 | View |
| Emergence surveyReport · PDF | 8 Jul 2026 | View |
| Trees - trench reportReport · PDF | 14 May 2026 | View |
| Site location planApproved Plan · PDF | 25 Mar 2026 | View |
| Existing elevations 1Revised Drawing · PDF | 25 Mar 2026 | View |
| Existing elevations 2Revised Drawing · PDF | 25 Mar 2026 | View |
| Existing elevations 3Revised Drawing · PDF | 25 Mar 2026 | View |
| Demolition elevations 2Revised Drawing · PDF | 25 Mar 2026 | View |
| Demolition elevations 3Revised Drawing · PDF | 25 Mar 2026 | View |
| Proposed elevations 3Approved Plan · PDF | 25 Mar 2026 | View |
| Tree constraints planOther · PDF | 25 Mar 2026 | View |
| Tree reportReport · PDF | 25 Mar 2026 | View |
| Superseded design & access statementReport · PDF | 25 Mar 2026 | View |
| Heritage statementReport · PDF | 18 Mar 2026 | View |
| Noise impact assessmentOther · PDF | 18 Mar 2026 | View |
| Preliminary bat roost assessmentOther · PDF | 18 Mar 2026 | View |
| Superseded drainage strategyReport · PDF | 17 Mar 2026 | View |
| Energy statementReport · PDF | 27 Feb 2026 | View |
| Existing attic floor planDrawing · PDF | 30 Jan 2026 | View |
| Demolition first floor planDrawing · PDF | 30 Jan 2026 | View |
| Existing roof planDrawing · PDF | 30 Jan 2026 | View |
| Demolition roof planDrawing · PDF | 30 Jan 2026 | View |
| Drawing issue sheetOther · PDF | 30 Jan 2026 | View |
| Existing site planDrawing · PDF | 30 Jan 2026 | View |
| Existing ground floor planDrawing · PDF | 30 Jan 2026 | View |
| Existing sections 1Drawing · PDF | 30 Jan 2026 | View |
| Proposed section 1Drawing · PDF | 30 Jan 2026 | View |
| Application form redactedApplication Form · PDF | 27 Jan 2026 | View |
| Proposed fire escape site planDrawing · PDF | 27 Jan 2026 | View |
| Drawing issue sheetOther · PDF | 27 Jan 2026 | View |
| Cil formOther · PDF | 27 Jan 2026 | View |
| Mechanical, electrical & sustainability riba stage 3 reportOther · PDF | 27 Jan 2026 | View |
| Outline daylight assessmentOther · PDF | 27 Jan 2026 | View |
| Superseded design and access statementOther · PDF | 27 Jan 2026 | View |
| Desktop assessmentOther · PDF | 27 Jan 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.