Council planning record

Internal and external alterations to the Champneys north range buildings to include creation of new openings and removal of bomb shelter. Three storey extension to the north elevation to provide lift access to the library (Amended description and revised plans).

Mansfield College Mansfield Road Oxford Oxfordshire OX1 3TF

DecidedReference: 25/03196/LBCOxford City Council

Last published check: 14 Sept 2026, 12:47. Check the council record for more recent changes.

Application location

Mansfield College Mansfield Road Oxford Oxfordshire OX1 3TF

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
1 Dec 2025
Validated
9 Dec 2025
Determination deadline
10 Mar 2026
Local authority
Oxford City Council

Application overview

Internal and external alterations to the Champneys north range buildings to include creation of new openings and removal of bomb shelter. Three storey extension to the north elevation to provide lift access to the library (Amended description and revised plans).

Proposal details

Reference
25/03196/LBC
Alternative references
PP-14434217
Ward
Holywell Ward
Agent
Mrs Dawn Brodie

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 284 of 284

DocumentPublishedAction
Lb decisionDecision · PDF20 Aug 2026View
Committee reportReport · PDF20 Aug 2026View
Proposed south range elevationRevised Drawing · PDF26 Apr 2026View
Proposed demolition ground floorApproved Plan · PDF22 Apr 2026View
Proposed ground floor planApproved Plan · PDF22 Apr 2026View
North range - proposed section ggApproved Plan · PDF26 Mar 2026View
South range - proposed ground floor plan ramparts constraintsApproved Plan · PDF26 Mar 2026View
Revised energy and sustainability assessmentOther · PDF26 Mar 2026View
South range - existing ground floor plan ramparts constraintsRevised Drawing · PDF25 Mar 2026View
South range - proposed - west wing part sectionsRevised Drawing · PDF25 Mar 2026View
Amended cover letterPublic Correspondence · PDF25 Mar 2026View
Basement impact assessmentOther · PDF25 Mar 2026View
Planning and listed building consent submission addendumOther · PDF25 Mar 2026View
Revised planning statementOther · PDF25 Mar 2026View
South range - proposed west wing detailed elevationsRevised Drawing · PDF23 Mar 2026View
Hard landscape layoutApproved Plan · PDF23 Mar 2026View
Cellweb root protection systemRevised Drawing · PDF23 Mar 2026View
Topsoil and tree pit planRevised Drawing · PDF23 Mar 2026View
Cellweb root protection system south east lime treesRevised Drawing · PDF23 Mar 2026View
Colour plan (landscape)Revised Drawing · PDF23 Mar 2026View
Proposed landscape planApproved Plan · PDF23 Mar 2026View
Furniture planRevised Drawing · PDF23 Mar 2026View
North range - proposed ground floor planRevised Drawing · PDF23 Mar 2026View
North range - proposed first floor planApproved Plan · PDF23 Mar 2026View
North range - proposed second floor planApproved Plan · PDF23 Mar 2026View
North range - proposed roof planApproved Plan · PDF23 Mar 2026View
North range - proposed east elevationApproved Plan · PDF23 Mar 2026View
North range - proposed south elevationRevised Drawing · PDF23 Mar 2026View
North range - proposed mews building elevationsRevised Drawing · PDF23 Mar 2026View
North range - proposed northwest addition detail elevations - sheet 1 of 2Approved Plan · PDF23 Mar 2026View
North range - proposed northwest addition detail elevations - sheet 2 of 2Approved Plan · PDF23 Mar 2026View
North range - proposed sections cc + ddApproved Plan · PDF23 Mar 2026View
North range - proposed sections ee + ffApproved Plan · PDF23 Mar 2026View
South range - proposed ground floor plan - east wingRevised Drawing · PDF23 Mar 2026View
South range - proposed first floor plan - east wingRevised Drawing · PDF23 Mar 2026View
South range - proposed second floor plan - east wingRevised Drawing · PDF23 Mar 2026View
South range - proposed third floor plan - east wingRevised Drawing · PDF23 Mar 2026View
South range - proposed roof plan - east wingRevised Drawing · PDF23 Mar 2026View
South range - proposed ground floor plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed first floor plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed second floor plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed third floor plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed roof plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed basement plan - spine wingRevised Drawing · PDF23 Mar 2026View
South range - proposed ground floor plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed first floor plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed second floor plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed third floor plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed roof plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed basement plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed ground floor plan - west wingRevised Drawing · PDF23 Mar 2026View
South range - proposed first floor planRevised Drawing · PDF23 Mar 2026View
South range - proposed second floor planRevised Drawing · PDF23 Mar 2026View
South range - proposed third floor planRevised Drawing · PDF23 Mar 2026View
South range - proposed fourth floor planRevised Drawing · PDF23 Mar 2026View
South range - proposed roof planRevised Drawing · PDF23 Mar 2026View
South range - proposed basement planRevised Drawing · PDF23 Mar 2026View
South range - proposed north and south elevationRevised Drawing · PDF23 Mar 2026View
South range - proposed east and west elevationRevised Drawing · PDF23 Mar 2026View
South range - proposed south quad elevationsRevised Drawing · PDF23 Mar 2026View
South range - proposed porters lodge tower detailed elevationsRevised Drawing · PDF23 Mar 2026View
South range - proposed east wing detailed elevationsRevised Drawing · PDF23 Mar 2026View
South range - proposed spine wing detailed elevationsRevised Drawing · PDF23 Mar 2026View
South range - proposed - building sectionsRevised Drawing · PDF23 Mar 2026View
South range - proposed - tower part sectionsRevised Drawing · PDF23 Mar 2026View
South range - proposed - east wing part sectionsRevised Drawing · PDF23 Mar 2026View
South range - proposed - spine wing part sectionsRevised Drawing · PDF23 Mar 2026View
Proposed block planApproved Plan · PDF23 Mar 2026View
Proposed college ground floor planRevised Drawing · PDF23 Mar 2026View
Proposed mansfield road elevationApproved Plan · PDF23 Mar 2026View
North range - proposed north elevationApproved Plan · PDF23 Mar 2026View
North range - proposed west elevationApproved Plan · PDF23 Mar 2026View
Proposed site sections aa, bb, ccApproved Plan · PDF23 Mar 2026View
Stage 3 proposed drainage plan sheet 01 of 02Revised Drawing · PDF23 Mar 2026View
Stage 3 proposed drainage plan sheet 02 of 02Approved Plan · PDF23 Mar 2026View
Proposed south quad drainage planRevised Drawing · PDF23 Mar 2026View
Proposed south quad ditch rampart overlayRevised Drawing · PDF23 Mar 2026View
Cover letterPublic Correspondence · PDF23 Mar 2026View
Highways response noteOther · PDF23 Mar 2026View
Proposed drainageOther · PDF23 Mar 2026View
Revised flood risk assessment and drainage strategyOther · PDF23 Mar 2026View
Existing floorplansDrawing · PDF19 Dec 2025View
Hard landscape layoutDrawing · PDF9 Dec 2025View
Natural stone paving detailsDrawing · PDF9 Dec 2025View
Cellweb root protection systemDrawing · PDF9 Dec 2025View
Recycled concrete paving small unit paverDrawing · PDF9 Dec 2025View
Recycled concrete paving paversDrawing · PDF9 Dec 2025View
Small unit natural stone paversDrawing · PDF9 Dec 2025View
Resin bonded gravelDrawing · PDF9 Dec 2025View
Typical tree planting detailsDrawing · PDF9 Dec 2025View
Topsoil and tree pit planDrawing · PDF9 Dec 2025View
Existing landscape planDrawing · PDF9 Dec 2025View
Tree removal planDrawing · PDF9 Dec 2025View
Colour planDrawing · PDF9 Dec 2025View
Proposed landscape planDrawing · PDF9 Dec 2025View
Furniture planDrawing · PDF9 Dec 2025View
Tree planting planDrawing · PDF9 Dec 2025View
Main quad section aaDrawing · PDF9 Dec 2025View
West quad section bbDrawing · PDF9 Dec 2025View
West quad section ccDrawing · PDF9 Dec 2025View
South quad section ddDrawing · PDF9 Dec 2025View
Cedar tree section eeDrawing · PDF9 Dec 2025View
Application form redactedApplication Form · PDF1 Dec 2025View
Cil formOther · PDF1 Dec 2025View
Planning statementOther · PDF1 Dec 2025View
North range - proposed demolition ground floor planDrawing · PDF1 Dec 2025View
North range - proposed demolition first floor planApproved Plan · PDF1 Dec 2025View
North range - proposed demolition second floor planApproved Plan · PDF1 Dec 2025View
North range - proposed demolition third floor planApproved Plan · PDF1 Dec 2025View
North range - proposed demolition roof planApproved Plan · PDF1 Dec 2025View
South range - proposed demolition ground floor planDrawing · PDF1 Dec 2025View
South range - proposed demolition first floor planDrawing · PDF1 Dec 2025View
South range - proposed demolition second floor planDrawing · PDF1 Dec 2025View
South range - proposed demolition third floor planDrawing · PDF1 Dec 2025View
South range - proposed demolition roof floor planDrawing · PDF1 Dec 2025View
Proposed block planDrawing · PDF1 Dec 2025View
North range - proposed ground floor planDrawing · PDF1 Dec 2025View
North range - proposed first floor planDrawing · PDF1 Dec 2025View
North range - proposed second floor planDrawing · PDF1 Dec 2025View
North range - proposed roof planDrawing · PDF1 Dec 2025View
North range - proposed northwest addition detail plansApproved Plan · PDF1 Dec 2025View
South range - proposed ground floor planDrawing · PDF1 Dec 2025View
South range - proposed first floor planDrawing · PDF1 Dec 2025View
South range - proposed second floor planDrawing · PDF1 Dec 2025View
South range - proposed third floor planDrawing · PDF1 Dec 2025View
South range - proposed fourth floor planDrawing · PDF1 Dec 2025View
South range - proposed roof planDrawing · PDF1 Dec 2025View
South range - proposed basement planDrawing · PDF1 Dec 2025View
Proposed mansfield road elevationDrawing · PDF1 Dec 2025View
North range - proposed north elevationDrawing · PDF1 Dec 2025View
North range - proposed east elevationDrawing · PDF1 Dec 2025View
North range - proposed northwest addition elevations -Drawing · PDF1 Dec 2025View
North range - existing - former jcr access elevationsDrawing · PDF1 Dec 2025View
North range - proposed - former jcr access elevationsDrawing · PDF1 Dec 2025View
South range - proposed north and south elevationDrawing · PDF1 Dec 2025View
South range - proposed east and west elevationDrawing · PDF1 Dec 2025View
South range - proposed south quad elevationsDrawing · PDF1 Dec 2025View
Proposed site sections aa bb ccDrawing · PDF1 Dec 2025View
North range - proposed sections aa and bbApproved Plan · PDF1 Dec 2025View
North range - proposed sections cc and ddDrawing · PDF1 Dec 2025View
North range - proposed sections ee and ffDrawing · PDF1 Dec 2025View
North range - proposed section ggDrawing · PDF1 Dec 2025View
North range - proposed northwest addition detail sectioApproved Plan · PDF1 Dec 2025View
South range - proposed - building sectionsDrawing · PDF1 Dec 2025View
North range - existing - demolition and alterations -Approved Plan · PDF1 Dec 2025View
North range - proposed - demolition and alterations -Approved Plan · PDF1 Dec 2025View
North range - proposed south elevationDrawing · PDF1 Dec 2025View
North range - proposed west elevationDrawing · PDF1 Dec 2025View
North range - proposed mews building elevationsDrawing · PDF1 Dec 2025View
North range - proposed northwest addition elevations -Drawing · PDF1 Dec 2025View
Existing site location planDrawing · PDF1 Dec 2025View
Proposed site demolition planApproved Plan · PDF1 Dec 2025View
Existing block planDrawing · PDF1 Dec 2025View
North range - existing ground floor planApproved Plan · PDF1 Dec 2025View
North range - existing first floor planApproved Plan · PDF1 Dec 2025View
North range - existing second floor plaApproved Plan · PDF1 Dec 2025View
North range - existing third floor planApproved Plan · PDF1 Dec 2025View
North range - existing roof planApproved Plan · PDF1 Dec 2025View
South range - existing ground floor planDrawing · PDF1 Dec 2025View
South range - proposed ground floor plan - spine wingDrawing · PDF1 Dec 2025View
South range - proposed first floor plan - spine wingDrawing · PDF1 Dec 2025View
South range - proposed second floor plan - spine wingDrawing · PDF1 Dec 2025View
South range - proposed third floor plan - spine wingDrawing · PDF1 Dec 2025View
South range - proposed roof plan - spine wingDrawing · PDF1 Dec 2025View
South range - proposed basement plan - spine wingDrawing · PDF1 Dec 2025View
South range - existing first floor planDrawing · PDF1 Dec 2025View
South range - existing second floor planDrawing · PDF1 Dec 2025View
South range - existing third floor planDrawing · PDF1 Dec 2025View
South range - existing roof floor planDrawing · PDF1 Dec 2025View
North range - existing north and south elevationsApproved Plan · PDF1 Dec 2025View
North range - existing east and west elevationsApproved Plan · PDF1 Dec 2025View
Existing mansfield road elevationDrawing · PDF1 Dec 2025View
South range - existing north and south elevationsDrawing · PDF1 Dec 2025View
South range - existing east and west elevationsDrawing · PDF1 Dec 2025View
North range - existing sections aa + bbApproved Plan · PDF1 Dec 2025View
North range - existing sections cc + ddApproved Plan · PDF1 Dec 2025View
North range - existing sections ee + ffApproved Plan · PDF1 Dec 2025View
South range - existing site sections aa and bbDrawing · PDF1 Dec 2025View
South range - existing site sections cc + dd + eeDrawing · PDF1 Dec 2025View
Proposed college ground floor planDrawing · PDF1 Dec 2025View
South range - proposed first floor plan - west wingDrawing · PDF1 Dec 2025View
South range - proposed second floor plan - west wingDrawing · PDF1 Dec 2025View
South range - proposed third floor plan - west wingDrawing · PDF1 Dec 2025View
South range - proposed roof plan - west wingDrawing · PDF1 Dec 2025View
South range - proposed basement plan - west wingDrawing · PDF1 Dec 2025View
South range - proposed porters lodge tower detailed eleDrawing · PDF1 Dec 2025View
South range - proposed east wing detailed elevationsDrawing · PDF1 Dec 2025View
South range - proposed spine wing detailed elevationsDrawing · PDF1 Dec 2025View
South range - proposed west wing detailed elevationsDrawing · PDF1 Dec 2025View
South range - proposed - tower part sectionsDrawing · PDF1 Dec 2025View
South range - proposed - east wing part sectionsDrawing · PDF1 Dec 2025View
South range - proposed - spine wing part sectionsDrawing · PDF1 Dec 2025View
South range - proposed - west wing part sectionsDrawing · PDF1 Dec 2025View
South range - existing ground floor plan ramparts consDrawing · PDF1 Dec 2025View
South range - proposed ground floor plan ramparts consDrawing · PDF1 Dec 2025View
South range - proposed ground floor plan - east wingDrawing · PDF1 Dec 2025View
South range - proposed first floor plan - east wingDrawing · PDF1 Dec 2025View
South range - proposed second floor plan - east wingDrawing · PDF1 Dec 2025View
South range - proposed third floor plan - east wingDrawing · PDF1 Dec 2025View
South range - proposed roof plan - east wingDrawing · PDF1 Dec 2025View
South range - proposed ground floor plan - west wingDrawing · PDF1 Dec 2025View
Construction logistics and management plan part 2Other · PDF1 Dec 2025View
Construction logistics and management plan part 3Other · PDF1 Dec 2025View
Site waste management planOther · PDF1 Dec 2025View
Daylight and sunlight report - internalOther · PDF1 Dec 2025View
Daylight and sunlight report appendices part 1Other · PDF1 Dec 2025View
Daylight and sunlight report appendices part 2Other · PDF1 Dec 2025View
Daylight and sunlight report appendices part 3Other · PDF1 Dec 2025View
Daylight and sunlight reportOther · PDF1 Dec 2025View
Air quality assessmentOther · PDF1 Dec 2025View
Arboricultural method statementOther · PDF1 Dec 2025View
Archaeological desk based assessment - baseline part 1Other · PDF1 Dec 2025View
Archaeological desk based assessment - baseline part 2Other · PDF1 Dec 2025View
Archaeological desk based assessment addendumOther · PDF1 Dec 2025View
Brownfield runoff calculationsOther · PDF1 Dec 2025View
Construction logistics and management plan part 1Other · PDF1 Dec 2025View
Ground investigations report part 3Other · PDF1 Dec 2025View
Ground investigations report part 4Other · PDF1 Dec 2025View
Ground investigations report part 5Other · PDF1 Dec 2025View
Ground investigations report part 6Other · PDF1 Dec 2025View
Health impact assessmentOther · PDF1 Dec 2025View
Demolition justification statementOther · PDF1 Dec 2025View
Design and access statement part 1Other · PDF1 Dec 2025View
Design and access statement part 2Other · PDF1 Dec 2025View
Design and access statement part 3Other · PDF1 Dec 2025View
Design and access statement part 4Other · PDF1 Dec 2025View
Ecological impact assessment and biodiversity net gain assessmentOther · PDF1 Dec 2025View
Flood exceedance pathways planDrawing · PDF1 Dec 2025View
Ground investigation report - proposed developmentOther · PDF1 Dec 2025View
Ground investigations report part 1Other · PDF1 Dec 2025View
Ground investigations report part 2Other · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix fOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix gOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix hOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix i part 1Other · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix i part 2Other · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix jOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix kOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix lOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy reportOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix aOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix bOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix cOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix dOther · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix e part 1Other · PDF1 Dec 2025View
Flood risk assessment and drainage strategy - appendix e part 2Other · PDF1 Dec 2025View
Landscape design statement pa01 part 5Other · PDF1 Dec 2025View
Landscape design statement pa01 part 6Other · PDF1 Dec 2025View
Landscape design statement pa01 part 7Other · PDF1 Dec 2025View
Landscape design statement pa01 part 8Other · PDF1 Dec 2025View
Landscape design statement pa01 part 9Other · PDF1 Dec 2025View
Heritage assessment - whole college assessment part 1Other · PDF1 Dec 2025View
Heritage assessment - whole college impacts part 2Other · PDF1 Dec 2025View
Existing impermeable areasDrawing · PDF1 Dec 2025View
Proposed impermeable areasDrawing · PDF1 Dec 2025View
Landscape and visual impact assessment appendices part 1Other · PDF1 Dec 2025View
Landscape and visual impact assessment appendices part 2Other · PDF1 Dec 2025View
Landscape and visual impact assessment appendices part 3Other · PDF1 Dec 2025View
Landscape and visual impact assessmentOther · PDF1 Dec 2025View
Landscape design statement pa01 part 1Other · PDF1 Dec 2025View
Landscape design statement pa01 part 2Other · PDF1 Dec 2025View
Landscape design statement pa01 part 3Other · PDF1 Dec 2025View
Landscape design statement pa01 part 4Other · PDF1 Dec 2025View
Proposed south range basement drainage planDrawing · PDF1 Dec 2025View
Proposed surface water drainage calculationsOther · PDF1 Dec 2025View
Statement of community involvement - appendicesOther · PDF1 Dec 2025View
Statement of community involvementOther · PDF1 Dec 2025View
Sustainability and energy statementOther · PDF1 Dec 2025View
Transport assessmentOther · PDF1 Dec 2025View
Travel planOther · PDF1 Dec 2025View
Tree constraints planDrawing · PDF1 Dec 2025View
Tree protection planDrawing · PDF1 Dec 2025View
Tree protection planDrawing · PDF1 Dec 2025View
Aerial and ground tree survey reportOther · PDF1 Dec 2025View
Utility statementOther · PDF1 Dec 2025View
Noise impact assessmentOther · PDF1 Dec 2025View
Proposed drainage details - sheet 1 of 4Drawing · PDF1 Dec 2025View
Proposed drainage details - sheet 2 of 4Drawing · PDF1 Dec 2025View
Proposed drainage details - sheet 3 of 4Drawing · PDF1 Dec 2025View
Proposed drainage details - sheet 4 of 4Drawing · PDF1 Dec 2025View
Stage 3 proposed drainage plan - sheet 01 of 02Drawing · PDF1 Dec 2025View
Stage 3 proposed drainage plan - sheet 02 of 02Drawing · PDF1 Dec 2025View
Proposed south quad drainage planDrawing · PDF1 Dec 2025View
Cover letterOther · PDF1 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Last Site Notice Posted Date

    Published milestoneCouncil source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Standard Consultation Date

    Published milestoneCouncil source
  10. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Actual Committee Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
Lb decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.