Scotland · Local authority

Orkney Islands
Planning applications.

Explore collected planning applications and decisions for Orkney Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,978Searchable applications
140Recorded as pending
96%Approval rate · 10,073 approved or refused records
434Refused applications

9,639 approved · 434 refused · 561 withdrawn. Received dates in our records: 24 Sept 1979 to 5 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas6 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided13/371/PP

    Temporary siting of a portable storage container (Retrospective)

    Workshop G10, 1 Garson Place, Garson Industrial Estate, Stromness, Orkney, KW16 3EE

    Received 11 Sept 2013
  2. Decided13/372/AMC

    Erect a house with integral garage and an air source heat pump (following permission in principle - 12/480/PIP)

    West Links (Site 5) (Land Near), Burray, Orkney

    Received 12 Sept 2013
  3. Decided13/373/PP

    Demolish existing porch, extend a house and alter existing roof covering

    Garson, Sandwick, Orkney, KW16 3JD

    Received 16 Sept 2013
  4. Decided13/374/MARCON

    Screening opinion request to install a subsea telecommunication cable

    Bay Of Tuquoy, Westray To Aikerness, Evie, Orkney

    Received 16 Sept 2013
  5. Decided13/375/PP

    Erect a storage building

    The Orkney Brewery, Quoyloo Road, Sandwick, Orkney, KW16 3LT

    Received 16 Sept 2013
  6. Decided13/376/PP

    Erect a GP shed

    Messigate Farm, Tankerness, Orkney, KW17 2QT

    Received 17 Sept 2013
  7. Decided13/377/TPP

    Erect a 6kW wind turbine (max height 17.8m)

    Brim (Land Near), Birsay, Orkney, KW17 2NS

    Received 18 Sept 2013
  8. Decided13/378/PP

    Erect a slatted court

    Breckowall Farm, Westray, Orkney, KW17 2DW

    Received 18 Sept 2013
  9. Decided13/379/PP

    Demolish stone steps; construct roof, with stone slates and skylights; form door openings; install timber windows and doors; wet harl walls; construct steps with handrail; and install ventilation extractors and exterior lighting

    5 East Road, Kirkwall, Orkney, KW15 1HZ

    Received 18 Sept 2013
  10. Decided13/380/LB

    Demolish stone steps; remove flagstone and timber floors; construct roof, with stone slates and skylights; form three door openings; install timber windows and doors; install concrete lintels and cills; wet harl walls; construct steps with handrail; install ventilation extractors and exterior lighting; and strip rebuild interior

    5 East Road, Kirkwall, Orkney, KW15 1HZ

    Received 18 Sept 2013
  11. Decided13/381/TPP

    Erect 2 x 5kW wind turbines (max height 17.8m)

    The Bungalow & Swanson Cottage (Land Near), Birsay, Orkney, KW17 2NP

    Received 19 Sept 2013
  12. Decided13/382/TPP

    Erect 2 x 5kW wind turbines (max height 17.8m)

    Swannay Farm (Land Near), Birsay, Orkney

    Received 19 Sept 2013
  13. Decided13/383/PP

    Change of use from offices to retail, gallery and offices; relocate section of front railings and gate; erect single storey rear extension with flat roof, parapet, wet render and timber cladding; install air source heat pumps and erect a boundary fence

    33 Albert Street, Kirkwall, Orkney, KW15 1HL

    Received 19 Sept 2013
  14. Decided13/384/LB

    Demolish rear extension, outbuilding and section of side boundary wall; form opening in rear gable; relocate section of front railings and gate; display two advertisements; remove partitions; erect single storey rear extension with flat roof, parapet and wet render and install air source heat pumps

    33 Albert Street, Kirkwall, Orkney, KW15 1HL

    Received 19 Sept 2013
  15. Decided13/385/PP

    Demolish existing house and erect a replacement house with an air source heat pump

    Gutterquoy (Land Near), Durkadale Road, Birsay, Orkney, KW17 2JD

    Received 19 Sept 2013
  16. Decided13/386/APN

    Erect a GP shed

    Brimbanks, Eday, Orkney, KW17 2AA

    Received 19 Sept 2013
  17. Withdrawn/Returned13/387/PP

    Change of use from an agricultural store to a house

    North Tuan, Westray, Orkney

    Received 20 Sept 2013
  18. Decided13/388/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Oyce (Land Near), Sanday, Orkney, KW17 2AZ

    Received 20 Sept 2013
  19. Decided13/389/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Fairhill (Land Near), Stronsay, Orkney, KW17 2AJ

    Received 20 Sept 2013
  20. Decided13/390/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Leabreck (Land Near), Birsay, Orkney, KW17 2ND

    Received 20 Sept 2013
  21. Decided13/391/AMC

    Reinstate derelict building to a house, extend and install an air source heat pump (Following permission in principle - 11/393/PIP)

    Adam Cottage, Harray, Orkney, KW17 2JA

    Received 20 Sept 2013
  22. Decided13/392/PP

    Install an air source heat pump (retrospective), demolish existing sun porch and extend a house

    Northolme, St Ola, Orkney, KW15 1SB

    Received 23 Sept 2013
  23. Decided13/393/TPP

    Erect 20kW wind turbine (max height 22m)

    Hall Of Clestrain (Land Near), Orphir, Orkney, KW17 2RF

    Received 23 Sept 2013
  24. Decided13/394/APN

    Erect a GP shed

    Viera Lodge, Rousay, Orkney, KW17 2PT

    Received 23 Sept 2013

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Orkney Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Orkney Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage