Scotland · Local authority

Orkney Islands
Planning applications.

Explore collected planning applications and decisions for Orkney Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,978Searchable applications
140Recorded as pending
96%Approval rate · 10,073 approved or refused records
434Refused applications

9,639 approved · 434 refused · 561 withdrawn. Received dates in our records: 24 Sept 1979 to 5 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas6 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided12/782/LB

    Install secondary glazing

    Little Quildon, Back Road, Stromness, Orkney, KW16 3DU

    Received 6 Dec 2012
  2. Decided12/783/PP

    Removal of wheelchair lift and reinstate the wall

    Sheriff Court, Watergate, Kirkwall, Orkney, KW15 1PD

    Received 10 Dec 2012
  3. Decided12/784/LB

    Amend parking area (currently under construction 06/387/PPF) and install a handrail

    Rosslyn, 1 Franklin Road, Stromness, Orkney, KW16 3AN

    Received 10 Dec 2012
  4. Withdrawn/Returned12/785/PP

    Erect a self catering unit

    Fea (Land Near), Tankerness Hall Road, Tankerness, Orkney, KW17 2QS

    Received 11 Dec 2012
  5. Decided12/786/TPP

    Erect a 500kW wind turbine (max height 46.6m), erect a switchgear enclosure and create an access track

    Rysa (Land Near), Lyness, Orkney

    Received 10 Dec 2012
  6. Decided12/787/TPP

    Erect a 60kW wind turbine (max height 32.6m) and erect switchgear building

    Hunton (Land Near), Stronsay, Orkney

    Received 10 Dec 2012
  7. Decided12/788/PP

    Erect a conservatory

    The Harbour Master's House, Front Road, St Margaret's Hope, South Ronaldsay, Orkney, KW17 2SL

    Received 11 Dec 2012
  8. Decided12/789/PP

    Installation of an exhaust cowl and two external ground mounted heat exchanger units with associated security fencing

    Keelylang Hill (Land Near), Grimbister, Firth

    Received 13 Dec 2012
  9. Decided12/790/PP

    Install an air source heat pump

    Holland House, Church Road, Harray, Orkney, KW17 2LQ

    Received 13 Dec 2012
  10. Decided12/791/PP

    Erect a house with integral garage and install an air source heat pump (amendment to approval of 12/405/PP)

    Lynnfield Hotel (Land Near), Kirkwall, Orkney

    Received 14 Dec 2012
  11. Decided12/792/TPP

    Erect 2 x 60kW wind turbines (max height 32.6m) and erect a substation

    Bonni-Min (Land Near), Westray, Orkney

    Received 14 Dec 2012
  12. Decided12/793/TPP

    Erect 2 x 60kW wind turbines (max height 32.6m), substations and laydown areas

    Sandend (Land Near), Westray, Orkney

    Received 17 Dec 2012
  13. Decided12/794/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Upper Breckan (Land Near), Sanday, Orkney

    Received 18 Dec 2012
  14. Decided12/795/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Saville (Land Near), Oyce Road, Sanday, Orkney

    Received 18 Dec 2012
  15. Decided12/796/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Upperhouse (Land Near), Ortie Road, Sanday, Orkney

    Received 18 Dec 2012
  16. Decided12/799/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Bursie Cottage (Land Near), Ortie Road, Sanday, Orkney

    Received 18 Dec 2012
  17. Decided12/797/PP

    Install 2 air source heat pumps (retrospective)

    15 St Catherine's Place, Kirkwall, Orkney, KW15 1HX

    Received 18 Dec 2012
  18. Decided12/798/LB

    Install 2 air source heat pumps (retrospective)

    15 St Catherine's Place, Kirkwall, Orkney, KW15 1HX,

    Received 18 Dec 2012
  19. Decided12/800/TPP

    Amend planning permission 12/108/TPP to change from a 900kW wind turbine (max height 67m) to a 900kW wind turbine (max height 77m), switchgear building and access track

    Rennibister (Land Near), Firth, Orkney

    Received 19 Dec 2012
  20. Decided12/801/PP

    Install an air source heat pump

    13 Ness Road, Stromness, Orkney, KW16 3DL,

    Received 20 Dec 2012
  21. Decided12/802/PP

    Install 6 air source heat pumps (retrospective)

    96-100 Victoria Street, Stromness

    Received 19 Dec 2012
  22. Decided12/803/TPP

    Erect a 5kW wind turbine (max height 15m)

    West Thrave (Land Near), Rue Road, Sanday, Orkney

    Received 20 Dec 2012
  23. Decided12/804/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Miry Park (Land Near), Sanday, Orkney

    Received 20 Dec 2012
  24. Decided12/805/TPP

    Erect a 5kW wind turbine (max height 17.8m)

    Stiglister On The Hill (Land Near), Coo Road, Sanday, Orkney

    Received 20 Dec 2012

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Orkney Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Orkney Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage