Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Hundland Hill (Land Near), Birsay, Orkney
Last published check: 13 Oct 2026, 23:02. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceErect four wind turbines (maximum height of 180 metres, maximum generation capacity 26.4 MW total), a substation and maintenance building, create an access, and associated infrastructure including access tracks, underground cabling, crane hardstandings and borrow pit
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsHundland Hill (Land Near), Birsay, Orkney
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Scottish Government receipt acknowledgementCorrespondence · PDF | 11 Feb 2025 | View |
| Roads ServicesConsultation Response · PDF | 23 Sept 2024 | View |
| Historic Environment ScotlandConsultation Response · PDF | 15 Aug 2024 | View |
| Policy Officer - AccessConsultation Response · PDF | 15 Aug 2024 | View |
| Islands archaeologistConsultation Response · PDF | 15 Aug 2024 | View |
| NatureScotConsultation Response · PDF | 5 Aug 2024 | View |
| HIAL (Highlands & Islands Airports Ltd)Consultation Response · PDF | 31 Jul 2024 | View |
| Environmental HealthConsultation Response · PDF | 31 Jul 2024 | View |
| MoD (Ministry of Defence)Consultation Response · PDF | 24 Jul 2024 | View |
| Engineering ServicesConsultation Response · PDF | 22 Jul 2024 | View |
| JRC (Joint Radio Company)Consultation Response · PDF | 17 Jul 2024 | View |
| SEPA (Scottish Environment Protection Agency)Consultation Response · PDF | 17 Jul 2024 | View |
| Policy Officer (Environment)Consultation Response · PDF | 15 Jul 2024 | View |
| Scottish WaterConsultation Response · PDF | 15 Jul 2024 | View |
| NATS (National Air Traffic Services)Consultation Response · PDF | 10 Jul 2024 | View |
| Kirkwall Airport ? Senior PilotConsultation Response · PDF | 10 Jul 2024 | View |
| Neighbour Notification ListNeighbour Notification List · PDF | 10 Jul 2024 | View |
| Arqiva Services LtdConsultation Response · PDF | 10 Jul 2024 | View |
| Consultee ListConsultee List · PDF | 9 Jul 2024 | View |
| UPDATED - Non Technical SummarySupporting Document · PDF | 3 Jul 2024 | View |
| Location PlanDrawing - Amended · PDF | 3 Jul 2024 | View |
| Site PlanDrawing - Amended · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 15 Figure 15_4 Cumulative Shadow Flicker StuSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 3 Figure 3_2 Cumulative DevelopmentsSupporting Document · PDF | 3 Jul 2024 | View |
| Supplementary Environmental Report - Updated June 2024Supporting Document · PDF | 3 Jul 2024 | View |
| Chapter 10 Appendix 10.1Noise Assessment TablesSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_19b A966 Loch of SwanneySupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_20c A966 Hundland Road JunctionSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_21c Vinquin Hill, CostaSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_22c Mid HillSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_23b Kirbuster, Loch of HundlandSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_24b Brough of BirsaySupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_25b Birsay Community HallSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_26cSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6_27b A967 RosemireSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.28c A967 Near QueenaSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.29b Ring of BrodgarSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.30c Cishall Hill, Point of HelliaSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.31b B9057 North-west of DounbySupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.32c Skarra BraeSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.33b Vestra FioldSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.34c A966 West of Abune the HillSupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.35c Westside, RousaySupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.36c Hillock Road, ShapinsaySupporting Document · PDF | 3 Jul 2024 | View |
| UPDATED - Chapter 6 Figure 6.37c Ward HIll, HoySupporting Document · PDF | 3 Jul 2024 | View |
| Supplementary Environmental ReportSupporting Document · PDF | 20 Jun 2024 | View |
| Engineering ServicesConsultation Response · PDF | 8 May 2024 | View |
| Engineering ServicesConsultation Response · PDF | 8 May 2024 | View |
| RSPBConsultation Response · PDF | 29 Jan 2024 | View |
| Islands archaeologistConsultation Response · PDF | 23 Jan 2024 | View |
| Policy Officer - AccessConsultation Response · PDF | 22 Jan 2024 | View |
| HIAL (Highlands & Islands Airports Ltd)Consultation Response · PDF | 22 Jan 2024 | View |
| NatureScotConsultation Response · PDF | 19 Jan 2024 | View |
| Historic Environment ScotlandConsultation Response · PDF | 19 Jan 2024 | View |
| Furtjer Comment - P Avril & V WestrichRepresentation · PDF | 15 Jan 2024 | View |
| MoD (Ministry of Defence)Consultation Response · PDF | 12 Jan 2024 | View |
| Arqiva Services LtdConsultation Response · PDF | 9 Jan 2024 | View |
| SEPAConsultation Response · PDF | 9 Jan 2024 | View |
| NATS (National Air Traffic Services)Consultation Response · PDF | 9 Jan 2024 | View |
| Development and Marine PlanningConsultation Response · PDF | 8 Jan 2024 | View |
| Scottish WaterConsultation Response · PDF | 28 Dec 2023 | View |
| SEI Appendix 2.1 SEPA Response To 22.320.TPPMAJSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 3.1 - Community Engagement ProgrammeSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Fig 1.1 - Site Location PlanSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Fig 1.2 - Site Layout PlanSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Fig 2.1 - GWDTE and BuffersSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Fig 2.2 - X section T1 with Hydrogeo ContextSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Information ReportSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Non-Technical SummarySupporting Document · PDF | 21 Dec 2023 | View |
| Appendix 3.2a - Addl CH Visuals - VP1 StennessSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 3.2b - Addl CH Visuals - VP2 Maeshowe PathSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 3.2c - Addl CH Visuals - VP3 Maeshowe NSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 3.3 Figs 1 to 4 - St Magnus Way VisualsSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 3.3 St Magnus Way Seq Cumul AssessmentSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 8.1 - Ornithology Technical ReportSupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 8.3_Updated - HRASupporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 8.4 -HH and SE 131223Supporting Document · PDF | 21 Dec 2023 | View |
| SEI Appendix 8.2 - Collision Risk ModellingSupporting Document · PDF | 21 Dec 2023 | View |
| Consultee ListConsultee List · PDF | 21 Dec 2023 | View |
| Neighbour Notification ListNeighbour Notification List · PDF | 21 Dec 2023 | View |
| RSPBConsultation Response · PDF | 11 Oct 2023 | View |
| Roads ServicesConsultation Response · PDF | 10 Oct 2023 | View |
| NatureScotConsultation Response · PDF | 29 Sept 2023 | View |
| AOC Archaeology Group to OfficerCorrespondence · PDF | 2 Aug 2023 | View |
| NatureScotConsultation Response · PDF | 31 Jul 2023 | View |
| JRC (Joint Radio Company)Consultation Response · PDF | 26 Jun 2023 | View |
| Further Objection - Constantine Wind EnergyRepresentation · PDF | 22 Jun 2023 | View |
| Historic Environment ScotlandConsultation Response · PDF | 20 Jun 2023 | View |
| Islands archaeologistConsultation Response · PDF | 14 Jun 2023 | View |
| NatureScotConsultation Response · PDF | 29 May 2023 | View |
| HIAL (Highlands & Islands Airports Ltd)Consultation Response · PDF | 29 May 2023 | View |
| Further Objection - L SinclairRepresentation · PDF | 25 May 2023 | View |
| Policy Officer - AccessConsultation Response · PDF | 22 May 2023 | View |
| MoD (Ministry of Defence)Consultation Response · PDF | 17 May 2023 | View |
| Extension of timeCorrespondence · PDF | 17 May 2023 | View |
| Extension of timeCorrespondence · PDF | 17 May 2023 | View |
| Policy Officer (Environment)Consultation Response · PDF | 12 May 2023 | View |
| SEPA (Scottish Environment Protection Agency)Consultation Response · PDF | 4 May 2023 | View |
| NATS (National Air Traffic Services)Consultation Response · PDF | 3 May 2023 | View |
| Policy Officer (Environment)Consultation Response · PDF | 2 May 2023 | View |
| Scottish WaterConsultation Response · PDF | 25 Apr 2023 | View |
| Arqiva Services LtdConsultation Response · PDF | 24 Apr 2023 | View |
| UPDATED - Planning StatementSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 3.1 - Community Engagement ProgrammeSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 3.1 - Community Engagement ProgrammeSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 3.2b - Additional Cultural Heritage Visuals VP2 Maeshowe PathSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 3.2c- Additional Cyultural Heritage Visuals - VP3 MaeshoweSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 8.1 Ornithology Technical ReportSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 8.2 0 Collision Risk ModellingSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Appendix 8.3 HRASupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - SEI Fig 2.1 GWDTE and BuffersSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - SEI Fig 2.2 Xsection t1 with Hydrogeo ContextSupporting Document · PDF | 17 Apr 2023 | View |
| UPDATED - Supplementary Environmental Information ReportSupporting Document · PDF | 17 Apr 2023 | View |
| SUPESEDED- Non Technical SummarySupporting Document · PDF | 17 Apr 2023 | View |
| SEPA to applicantCorrespondence · PDF | 11 Apr 2023 | View |
| Officer to Agent - Further Information RequestCorrespondence · PDF | 8 Feb 2023 | View |
| Environmental HealthConsultation Response · PDF | 15 Dec 2022 | View |
| Historic Environment ScotlandConsultation Response · PDF | 8 Dec 2022 | View |
| Roads ServicesConsultation Response · PDF | 2 Dec 2022 | View |
| Engineering ServicesConsultation Response · PDF | 30 Nov 2022 | View |
| Objection - J SylvesterRepresentation · PDF | 16 Nov 2022 | View |
| Islands ArchaeologistConsultation Response · PDF | 15 Nov 2022 | View |
| Policy Officer (Environment)Representation · PDF | 15 Nov 2022 | View |
| NatureScotConsultation Response · PDF | 8 Nov 2022 | View |
| Environmental HealthConsultation Response · PDF | 3 Nov 2022 | View |
| RSPB (Royal Society for the Protection of Birds)Consultation Response · PDF | 2 Nov 2022 | View |
| Further Objection - J & N LeitchRepresentation · PDF | 28 Oct 2022 | View |
| Further Objection - S & J SchofieldRepresentation · PDF | 26 Oct 2022 | View |
| Objection - E SchofieldRepresentation · PDF | 26 Oct 2022 | View |
| Objection - T SchofieldRepresentation · PDF | 26 Oct 2022 | View |
| Objection - B MitchellRepresentation · PDF | 26 Oct 2022 | View |
| Kirkwall Airport ? Senior PilotConsultation Response · PDF | 25 Oct 2022 | View |
| Supplementary Environmental InformationSupporting Document · PDF | 25 Oct 2022 | View |
| Chapter 8 Appendix 8_1 Ornithology SummarySupporting Document · PDF | 25 Oct 2022 | View |
| Chapter 8 Appendix 8_2Collision Risk Modelling Report: September 2020 ? August 2Supporting Document · PDF | 25 Oct 2022 | View |
| Environmental Health - OfficerCorrespondence · PDF | 24 Oct 2022 | View |
| Objection - H SchofieldRepresentation · PDF | 23 Oct 2022 | View |
| Objection - I McGillRepresentation · PDF | 23 Oct 2022 | View |
| Objection - D DiamondRepresentation · PDF | 23 Oct 2022 | View |
| Objection - N PrestonRepresentation · PDF | 23 Oct 2022 | View |
| Further Objection - H SchofieldRepresentation · PDF | 23 Oct 2022 | View |
| Objection - J CuthbertRepresentation · PDF | 22 Oct 2022 | View |
| Support - S RussellRepresentation · PDF | 21 Oct 2022 | View |
| Objection - Constantine Wind EnergyRepresentation · PDF | 21 Oct 2022 | View |
| Objection - G ArgoRepresentation · PDF | 21 Oct 2022 | View |
| Objection - L SinclairRepresentation · PDF | 21 Oct 2022 | View |
| Objection - R HillRepresentation · PDF | 21 Oct 2022 | View |
| Support - P ArchibaldRepresentation · PDF | 18 Oct 2022 | View |
| Support - K ArchibaldRepresentation · PDF | 18 Oct 2022 | View |
| Support - C TaitRepresentation · PDF | 18 Oct 2022 | View |
| Support - C Archibald & S SinclairRepresentation · PDF | 18 Oct 2022 | View |
| Support - K BrandishRepresentation · PDF | 18 Oct 2022 | View |
| Further Support - C Archibald & S SinclairRepresentation · PDF | 18 Oct 2022 | View |
| Support - M AndersonRepresentation · PDF | 18 Oct 2022 | View |
| Support - C CorbettRepresentation · PDF | 18 Oct 2022 | View |
| Support - C MorganRepresentation · PDF | 18 Oct 2022 | View |
| Support - K DickRepresentation · PDF | 18 Oct 2022 | View |
| Support - D IrvineRepresentation · PDF | 18 Oct 2022 | View |
| Support - A McLeodRepresentation · PDF | 18 Oct 2022 | View |
| Support - N MacCallumRepresentation · PDF | 18 Oct 2022 | View |
| Support - B MacdonaldRepresentation · PDF | 18 Oct 2022 | View |
| SEPA (Scottish Environment Protection Agency)Consultation Response · PDF | 14 Oct 2022 | View |
| Support - K ArchibaldRepresentation · PDF | 12 Oct 2022 | View |
| Support - K MorganRepresentation · PDF | 12 Oct 2022 | View |
| Objection - S & J SchofieldCorrespondence · PDF | 11 Oct 2022 | View |
| Objection - P Avril & V WestrichRepresentation · PDF | 11 Oct 2022 | View |
| Objection - N MarwickRepresentation · PDF | 11 Oct 2022 | View |
| Objection - C MulpeterRepresentation · PDF | 11 Oct 2022 | View |
| Objection - A KellyRepresentation · PDF | 10 Oct 2022 | View |
| BT CommentCorrespondence · PDF | 6 Oct 2022 | View |
| Objection - L SinclairRepresentation · PDF | 6 Oct 2022 | View |
| Objection - P & R MatsonRepresentation · PDF | 6 Oct 2022 | View |
| Objection - J & N LeitchRepresentation · PDF | 6 Oct 2022 | View |
| HIAL (Highlands & Islands Airports Ltd)Consultation Response · PDF | 3 Oct 2022 | View |
| Arqiva Services LtdConsultation Response · PDF | 3 Oct 2022 | View |
| Scottish WaterConsultation Response · PDF | 30 Sept 2022 | View |
| MoD (Ministry of Defence)Consultation Response · PDF | 30 Sept 2022 | View |
| JRC (Joint Radio Company)Consultation Response · PDF | 26 Sept 2022 | View |
| Objection - D BilcliffeRepresentation · PDF | 24 Sept 2022 | View |
| NATS (National Air Traffic Services)Consultation Response · PDF | 23 Sept 2022 | View |
| Consultee ListConsultee List · PDF | 22 Sept 2022 | View |
| Neighbour Notification ListNeighbour Notification List · PDF | 22 Sept 2022 | View |
| Site PlanDrawing · PDF | 13 Sept 2022 | View |
| Site Layout PlanDrawing - Superseded · PDF | 13 Sept 2022 | View |
| Elevations - TurbineDrawing · PDF | 13 Sept 2022 | View |
| Foundation Plan - TurbineDrawing · PDF | 13 Sept 2022 | View |
| Construction CompoundDrawing · PDF | 13 Sept 2022 | View |
| Additional Construction CompoundDrawing · PDF | 13 Sept 2022 | View |
| Substation CompoundDrawing · PDF | 13 Sept 2022 | View |
| 45km Blade tip ZTVDrawing · PDF | 13 Sept 2022 | View |
| Location PlanDrawing - Superseded · PDF | 26 Aug 2022 | View |
| Chapter 1 Figure 1_1 Site Location PlanSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 1 Figure 1_2 Site Layout PlanSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 1 IntroductionSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Figure 10_1 Study Area_NSRs and NMPsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Figure 10_2 Application of Proxy BaselineSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 NoiseSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Figure 11_1 Study AreaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Figure 11_2 Traffic Count LocationsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Figure 11_3 Accident LocationsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Figure 11_4 Abnormal Invisible Loads andSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Transport and AccessSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Geology Peat Hydrology and HydrogeologySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 13 AviationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 14 Socio-economics recreation and toursimSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Figure 15_1 Telecommunications LinkSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Figure 15_2 Shadow Flicker Study AreaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Figure 15_3 Shadow Flicker ResultsSupporting Document · PDF | 26 Aug 2022 | View |
| SUPERSEDED -Chapter 15 Figure 15_4 Cumulative Shadow Flicker StuSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Other Issues including telecomms shadow fSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 16 Schedule of MitigationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 17 Summary of Residual EffectsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 2 Figure 2_1 Design IterationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 2 Site Selection and AlternativesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_1 Environmental Constraints withiSupporting Document · PDF | 26 Aug 2022 | View |
| SUPERSEDED -Chapter 3 Figure 3_2 Cumulative DevelopmentsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_3 Typical Turbine ElevationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_4 Typical Turbine FoundationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_5 Crane HardstandingSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_6 Indicative TracksSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_7 Main Construction CompoundSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_8 Additional Construction CompounSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Figure 3_9 Substation CompoundSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Proposed Development DescriptionSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 4 Approach to EIASupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 5 Planning Policy FrameworkSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_1 Study AreaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_10 PVRSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_11 PVR 45kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_12 CWFSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_13 CZTV Burgar HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_14 CZTV Hammars HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_15 CZTV Costa HeadSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_16 CZTV QuanternessSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_17 CZTV Hammars Hill ExtSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_18a Light PollutionSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_18b Hub Lighting ZTVSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_18c Light Intensity ZTVSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_19a-g VP 1 - Loch of SwanneySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_2 BT ZTV 45kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_20 VP 2 A966, Hundland Road junctionSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_21a-k VP3 Vinquin HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_22a-g VP4 Mid HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_23 VP 5 Kitrbuster Loch of HundlandSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_25 VP 7 Birsay Community HallSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_26 a-e VP 8 A967 TwattSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_27 VP 9 A967 Near RossmireSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_28a-e VP 10 A967 QueenaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_29 VP 11Ring of BrodgarSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_3 BT ZTV 20kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_30a-g VP 12 Vishall Hill, Point of HelliaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_31a-e VP 13 B9067 NW of DounbySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4 HH ZTV 45kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_5 HH ZTV 20kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_6 LCA ZTVSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_7 CCA ZTVSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_8 LD ZTVSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_9 LD ZTV 20kmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Landscape and Visual Impact AssessmentSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 EcologySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Figure 7_1 Site LocationSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Figure 7_2 Designated SitesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Figure 7_3 NVC ResultsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Figure 7_4 Phase 1 Corresponding HabitatsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Figure 7_5 GWDTESupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Figure 8_1 Nisthill VP Locations and ViewsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Figure 8_2 Nisthill Designated SitesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Figure 8_3 Habitat Management AreaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Cultural HeritageSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_1 Recorded Heritage Assets and thSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_2 Recorded Heritage Assets and thSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_3 Designated Heritage Assets andSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_4 Nationally Important Heritage ASupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_5 Nationally Important Heritage ASupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_6 HONO WHS Linga Fiold ScheduledSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_7 Extract from MacKenze Map 1750Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_8 Extract from 1st Edition OrdnanSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_9 Extract from Ordnance Survey MaSupporting Document · PDF | 26 Aug 2022 | View |
| Non-Technical SummarySupporting Document · PDF | 26 Aug 2022 | View |
| Planning StatementSupporting Document · PDF | 26 Aug 2022 | View |
| Turbine Planning Permission MAJApplication Form · PDF | 26 Aug 2022 | View |
| Chapter 6 LVIA Appendix 6_4 Residential Visual AmeniSupporting Document · PDF | 26 Aug 2022 | View |
| Design and Access StatementSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Appendix 10_1 Consultation RecordSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Appendix 10_2 Noise Site Survey RecordSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Appendix 10_3 Baseline Data SheetSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 10 Appendix 10_4 RNLsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Appendix 11_1 Transport Assessment AppendSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Appendix 11_1 Transport Assessment AppendSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 11 Appendix 11_1 Transport AssessmentSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 1Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 2Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 3Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 4Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 5Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 6Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 7Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Figure 8Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 Peat Landslide Hazard and RSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_1 PLHRA Appendix 2 DataSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_2 Peat Management Plan AnnexSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_2 Peat Management PlanSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_2 PMP Figure 1Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_2 PMP Figure 2Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 12 Appendix 12_2 Peat Management Plan FigureSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Appendix 15_1 Meteorological DataSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 15 Appendix 15_2 Potential Shadow PeriodsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 3 Appendix 3_1 Outline CEMPSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 4 Appendix 4_1 Scoping ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 4 Appendix 4_2 Scoping OpinionSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 4 Appendix 4_3 PAN FormSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Appendix 6_1 LVIA MethodologySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Appendix 6_2 LVIA NSASupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Appendix 6_3 LVIA Visable Aviation LightinSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_32a-e VP 14 Skara BraeSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_33a-d VP 15 Vestra FioldSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_34a-e VP16 A966 Anunc-the-HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_35a-e VP 17 Westside, RousaySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_36a-g VP 18Hillock Road, ShapinsaySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_37a-g VP 19 Ward Hill, HoySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_1 RVAA VP1Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_10 RVAA VP10Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_11 RVAA VP11Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_12 RVAA VP12Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_13 RVAA VP13Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_14 RVAA VP14Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_16 RVAA VP16Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_17 RVAA VP17Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_18 RVAA VP18Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_19 RVAA VP19Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_2 RVAA VP2Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_20 RVAA VP20Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_21 RVAA VP21Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_22 RVAA VP22Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_23 RVAA VP23Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_24 RVAA VP24Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_25 RVAA VP25Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_26 RVAA VP26Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_27 RVAA VP27Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_28 RVAA VP28Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_29 RVAA VP29Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_3 RVAA VP3Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_30 RVAA VP30Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_31 RVAA VP31Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_32 RVAA VP32Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_33 RVAA VP33Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_34 RVAA VP34Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_35 RVAA VP35Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_36 RVAA VP36Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_37 RVAA VP37Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_38 RVAA VP38Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_39 RVAA VP39Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_4 RVAA VP4Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_40 RVAA VP40Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_41 RVAA VP41Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_42 RVAA VP42Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_43 RVAA VP43Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_44 RVAA VP44Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_45 RVAA VP45Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_46 RVAA VP46Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_47 RVAA VP47Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_48 RVAA VP48Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_49 RVAA VP49Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_5 RVAA VP5Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_50 RVAA VP50Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_51 RVAA VP51Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_52 RVAA VP52Supporting Document · PDF | 26 Aug 2022 | View |
| Nisthill Wind Farm Volume 4 Chapter 6 Figure 6_4_53 RVAA VP53Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_54 RVAA VP54Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_55 RVAA VP55Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_56 RVAA VP56Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_6 RVAA VP6Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_7 RVAA VP7Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_8 RVAA VP8Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_9 RVAA VP9Supporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Appendix 7_1 Extended Phase 1 ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 7 Appendix 7_2 NVC Survey ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1 Ornithology Summary ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_1 Figure 1 VP Locations and VSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_2 Figure 2 Nisthill DesignateSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_4 Figure 4 SE and PE FlightliSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_5 Figure 5 RH WS GW FlightlinSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_6 Figure 6 Skua FlightlinesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_8 Figure 8a Wader TerritoriesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_1_8 Figure 8b Wader TerritoriesSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_2 Collision Risk Modelling RepoSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_2_1 Figure 1 Great Skua FlightsSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_2_2 Figure 2 Red Throated DiverSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 Appendix 8_3 HRASupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Appendix 9_1 Gazetteer ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Appendix 9_2 Archaeology and Cultural HeriSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Appendix 9_3 Detailed Setting AssessmentSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_10 CH VP Howana GrunaSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_12 CH VP Knowe of RowiegarSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_13 CH VP NisthouseSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_15 CH VP MittensSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_16 CH VP Park HolmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_17 CH VP Stoney HolmSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_18 CH VP Vinquin Hill BrochSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_19 CH VP Earls PalaceSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_20 CH VP Brough of BirsaySupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_21 CH VP Eynhallow ChurchSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_22 CH VP Aiker NessSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_23 CH VP Knowe of YarsoSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_24 CH VP Midhowe BrochSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_25 CH VP Ring of BrodgarSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_26 CH VP Maes HoweSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_27 CH VP StennessSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_28 CH VP Skara BraeSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 9 Figure 9_29 CH VP Linga FioldsSupporting Document · PDF | 26 Aug 2022 | View |
| Pre-Application Consultation ReportSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 6 Figure 6_4_15 RVAA VP15Supporting Document · PDF | 26 Aug 2022 | View |
| EIA Contents PageSupporting Document · PDF | 26 Aug 2022 | View |
| Figure 6_24a-e VP6 Brough of BirsaySupporting Document · PDF | 26 Aug 2022 | View |
| Figure 9_11 CH VP HundlandSupporting Document · PDF | 26 Aug 2022 | View |
| Figure 9_14 CH VP Hundland HillSupporting Document · PDF | 26 Aug 2022 | View |
| Chapter 8 OrnithologySupporting Document · PDF | 26 Aug 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.