Council planning record

Erect 6 wind turbines (maximum height 149.9 metres, maximum wind farm capacity 50MW), erect a meteorological mast (maximum height 90 metres) and a substation, construct access tracks, crane hardstandings, underground cabling, transformers, and a slipway and jetty, create a borrow pit, and associated infrastructure

Faray, Orkney

DecidedReference: 21/240/TPPMAJOrkney Islands

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Turbine Planning Permission MAJ
Received
3 Jun 2021
Validated
24 Jun 2021
Determination deadline
Not published
Local authority
Orkney Islands

Application overview

Erect 6 wind turbines (maximum height 149.9 metres, maximum wind farm capacity 50MW), erect a meteorological mast (maximum height 90 metres) and a substation, construct access tracks, crane hardstandings, underground cabling, transformers, and a slipway and jetty, create a borrow pit, and associated infrastructure

Proposal details

Reference
21/240/TPPMAJ
Alternative references
100398361-001
Ward
North Isles
Agent
Jenny Hazzard

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Faray, Orkney

This record has no verified map location.

View council map

Documents 203 of 203

DocumentPublishedAction
External DecisionDecision Notice · PDF21 Dec 2021View
Reference of Application to Scottish MinistersDecision Notice · PDF15 Oct 2021View
Policy OfficerConsultation Response · PDF5 Oct 2021View
SEPA (Scottish Environment Protection Agency)Consultation Response · PDF17 Sept 2021View
Historic Environment ScotlandConsultation Response · PDF13 Sept 2021View
NatureScot (formerly SNH)Consultation Response · PDF1 Sept 2021View
Engineering ServicesConsultation Response · PDF5 Aug 2021View
Marine ServicesConsultation Response · PDF5 Aug 2021View
LoganairConsultation Response · PDF4 Aug 2021View
NatureScot - Extension of TimeConsultation Response · PDF31 Jul 2021View
MoD (Ministry of Defence)Consultation Response · PDF28 Jul 2021View
SpectrumConsultation Response · PDF28 Jul 2021View
Environmental HealthConsultation Response · PDF28 Jul 2021View
Northern Lighthouse BoardConsultation Response · PDF19 Jul 2021View
Nuclear Safety Directorate (HSE)Consultation Response · PDF19 Jul 2021View
BT Telephone ExchangeConsultation Response · PDF14 Jul 2021View
HES - Extension of TimeConsultation Response · PDF13 Jul 2021View
NATS (National Air Traffic Services)Consultation Response · PDF9 Jul 2021View
HIAL (Highlands & Islands Airports Ltd)Consultation Response · PDF9 Jul 2021View
Scottish WaterConsultation Response · PDF8 Jul 2021View
Scottish GovernmentConsultation Response · PDF8 Jul 2021View
Marine ScotlandConsultation Response · PDF8 Jul 2021View
Design & Access StatementSupporting Document · PDF1 Jul 2021View
Planning StatementSupporting Document · PDF1 Jul 2021View
Non-Technical SummarySupporting Document · PDF10 Jun 2021View
Appendix 3.2 Outline CEMPSupporting Document · PDF10 Jun 2021View
Front Cover & ContentsSupporting Document · PDF10 Jun 2021View
AbbreviationsSupporting Document · PDF10 Jun 2021View
Chapter 1 - IntroductionSupporting Document · PDF10 Jun 2021View
Chapter 2 - Design IterationSupporting Document · PDF10 Jun 2021View
Chapter 3 - Proposed DevelopmentSupporting Document · PDF10 Jun 2021View
Chapter 4 Approach to EIASupporting Document · PDF10 Jun 2021View
Chapter 5 - Planning PolicySupporting Document · PDF10 Jun 2021View
Chapter 6 - Landscape and Visual.Supporting Document · PDF10 Jun 2021View
Chapter 7 - OrnithologySupporting Document · PDF10 Jun 2021View
Chapter 8 - Terrestrial Ecology and Nature ConservationSupporting Document · PDF10 Jun 2021View
Chapter 9 - NoiseSupporting Document · PDF10 Jun 2021View
Chapter 10 - Cultural HeritageSupporting Document · PDF10 Jun 2021View
Chapter 11 - Geology, Hydrology and HydrogeologySupporting Document · PDF10 Jun 2021View
Chapter 12 - Traffic and TransportSupporting Document · PDF10 Jun 2021View
Chapter 13 - Socio-economic, Recreation and TourismSupporting Document · PDF10 Jun 2021View
Chapter 14 - Aviation and RadarSupporting Document · PDF10 Jun 2021View
Chapter 15 - Shadow FlickerSupporting Document · PDF10 Jun 2021View
Chapter 16 - Underwater Noise AssessmentSupporting Document · PDF10 Jun 2021View
Chapter 17 - Marine Water and Sediment QualitySupporting Document · PDF10 Jun 2021View
Chapter 18 - Other IssuesSupporting Document · PDF10 Jun 2021View
Chapter 19 - Schedule of Environmental CommitmentsSupporting Document · PDF10 Jun 2021View
Chapter 20 - Summary of Residual EffectsSupporting Document · PDF10 Jun 2021View
Front Cover and ContentsSupporting Document · PDF10 Jun 2021View
Fig 1.1 - Site Location PlanSupporting Document · PDF10 Jun 2021View
Fig 1.2 - Proposed Development Site LayoutSupporting Document · PDF10 Jun 2021View
Fig 2.1 - Environmental Designations Outwith the Site BoundarySupporting Document · PDF10 Jun 2021View
Fig 2.2 - Site Environmental Constraints and OpportunitiesSupporting Document · PDF10 Jun 2021View
Fig 2.3 - Turbine Layouts A & BSupporting Document · PDF10 Jun 2021View
Fig 2.4 - Turbine Layouts B, C & DSupporting Document · PDF10 Jun 2021View
Fig 2.5 - Turbine ayouts D, E & FSupporting Document · PDF10 Jun 2021View
Fig 2.6 - Infrastructure Layout 1 & 2Supporting Document · PDF10 Jun 2021View
Fig 2.7 - Infrastructure Layout 3 & 4Supporting Document · PDF10 Jun 2021View
Fig 3.1 - Turbine ElevationSupporting Document · PDF10 Jun 2021View
Fig 3.2 - Typical Turbine FoundationSupporting Document · PDF10 Jun 2021View
Fig 3.3 - New Extended Slipway and Landing JettySupporting Document · PDF10 Jun 2021View
Fig 3.4 - Access Track Cross-sectionSupporting Document · PDF10 Jun 2021View
Fig 3.5 - Typical Drainage DesignSupporting Document · PDF10 Jun 2021View
Fig 3.6 - Indicative Substation ElevationSupporting Document · PDF10 Jun 2021View
Fig 3.7 - Typical Met Mast ElevationSupporting Document · PDF10 Jun 2021View
Fig 5.1 - OIC Energy Spatial StrategySupporting Document · PDF10 Jun 2021View
Fig 7.1 - VP Locations and ViewshedsSupporting Document · PDF10 Jun 2021View
Fig 7.2 - Ornithological DesignationsSupporting Document · PDF10 Jun 2021View
Fig 7.3 - Schedule 1 Raptor flightlinesSupporting Document · PDF10 Jun 2021View
Fig 7.4 - Curlew flightlinesSupporting Document · PDF10 Jun 2021View
Fig 7.5 - Golden Plover Flightlines and TerritoriesSupporting Document · PDF10 Jun 2021View
Fig 7.6 - Lapwing Flightlines and TerritoriesSupporting Document · PDF10 Jun 2021View
Fig 7.7 - Oystercatcher Flightlines and TerritoriesSupporting Document · PDF10 Jun 2021View
Fig 7.8 - Other Wader Flightlines and TerritoriesSupporting Document · PDF10 Jun 2021View
Fig 7.9 - Shag AONsSupporting Document · PDF10 Jun 2021View
Fig 7.10 - Fulmar AONsSupporting Document · PDF10 Jun 2021View
Fig 7.12 - Gull AONsSupporting Document · PDF10 Jun 2021View
Fig 7.13 - Wildfowl flightlinesSupporting Document · PDF10 Jun 2021View
Fig 7.14 - Other species territories and flightlinesSupporting Document · PDF10 Jun 2021View
Fig 7.15 - Proposed mitigationSupporting Document · PDF10 Jun 2021View
Fig 8.1 - Nature Conservation DesignationsSupporting Document · PDF10 Jun 2021View
Fig 8.2 - Phase 1 HabitatsSupporting Document · PDF10 Jun 2021View
Fig 8.3 - Otter Survey ResultsSupporting Document · PDF10 Jun 2021View
Fig 8.4 - Seal Survey ResultsSupporting Document · PDF10 Jun 2021View
Fig 8.5 - Cumulative AssessmentSupporting Document · PDF10 Jun 2021View
Fig 9.1 - Proposed turbine layout, 35 dBLA90 screening contour, and NSRsSupporting Document · PDF10 Jun 2021View
Fig 9.2 - Cumulative wind turbines consideredSupporting Document · PDF10 Jun 2021View
Fig 9.3 - Directional filtering applied to NMP1 baseline measurementsSupporting Document · PDF10 Jun 2021View
Fig 9.4 - Directional filtering applied to NMP2 baseline measurementsSupporting Document · PDF10 Jun 2021View
Fig 10.1 - Heritage Assets and Proposed InfrastructureSupporting Document · PDF10 Jun 2021View
Fig 10.2 - Heritage Assets within 1km Study AreaSupporting Document · PDF10 Jun 2021View
Fig 10.3 - Heritage Assets and 5km Study AreaSupporting Document · PDF10 Jun 2021View
Fig 10.4 - Heritage Assets and 10km Study AreaSupporting Document · PDF10 Jun 2021View
Fig 10.5 - Heritage Assets and 15km Study AreaSupporting Document · PDF10 Jun 2021View
Fig 10.6 - Extract from 1882 Ordnance Survey mapSupporting Document · PDF10 Jun 2021View
Fig 10.7 - Extract from 1881 Ordnance Survey map showing Quoy and CottSupporting Document · PDF10 Jun 2021View
Fig 10.8 - Extract from 1881 Ordnance Survey map showing Doggerboat, School andSupporting Document · PDF10 Jun 2021View
Fig 10.9 - Extract from 1881 Ordnance Survey map showing Roadside and LackquoySupporting Document · PDF10 Jun 2021View
Fig 10.10 - Extract from 1881 Ordnance Survey map showing Windywall and HollandSupporting Document · PDF10 Jun 2021View
Fig 10.11 - Extract 1881 OS Map NessSupporting Document · PDF10 Jun 2021View
Fig 11.1 - Watercourses Drainage and Abandoned WellsSupporting Document · PDF10 Jun 2021View
Fig 11.2 - Bedrock GeologySupporting Document · PDF10 Jun 2021View
Fig 11.3 - Superficial GeologySupporting Document · PDF10 Jun 2021View
Fig 11.4 - Potential Groundwater Dependent Terrestrial EcosystemsSupporting Document · PDF10 Jun 2021View
Fig 12.1 - Automatic Traffic Count (ATC) LocationsSupporting Document · PDF10 Jun 2021View
Fig 15.1 - Shadow Flicker MapSupporting Document · PDF10 Jun 2021View
Fig 15.2 - Cumulative Shadow Flicker MapSupporting Document · PDF10 Jun 2021View
Fig 17.1 - Marine Structures Sampling PlanSupporting Document · PDF10 Jun 2021View
Fig 18.2 - Seabed Survey Sample Plan (annotated).Supporting Document · PDF10 Jun 2021View
Fig 18.3 - ScotMap Inshore Fishing Monetary ValueSupporting Document · PDF10 Jun 2021View
Fig 6.1 - Study AreaSupporting Document · PDF10 Jun 2021View
Fig 6.2a - Landscape CharacterSupporting Document · PDF10 Jun 2021View
Fig 6.2b - Coastal CharacterSupporting Document · PDF10 Jun 2021View
Fig 6.3 - Designations and WLASupporting Document · PDF10 Jun 2021View
Fig 6.4 - Principal Visual ReceptorsSupporting Document · PDF10 Jun 2021View
Fig 6.5a - Blade Tip ZTV 40KMSupporting Document · PDF10 Jun 2021View
Fig 6.5b- Blade Tip ZTV 15KMSupporting Document · PDF10 Jun 2021View
Fig 6.5c - Blade Tip ZTV 15KM A0Supporting Document · PDF10 Jun 2021View
Fig 6.6a - Hub Height ZTV 40KMSupporting Document · PDF10 Jun 2021View
Fig 6.6b - Hub Height ZTV 15KMSupporting Document · PDF10 Jun 2021View
Fig 6.7a - Landscape Character with ZTV 15KMSupporting Document · PDF10 Jun 2021View
Fig 6.7b - Coastal Character with ZTV 15KMSupporting Document · PDF10 Jun 2021View
Fig 6.8 - ZTV with Designations and WLA 40KMSupporting Document · PDF10 Jun 2021View
Fig 6.9 - ZTV with Principal Visual Receptors 15KMSupporting Document · PDF10 Jun 2021View
Fig 6.10 - Composite Map 15KM_A0Supporting Document · PDF10 Jun 2021View
Fig 6.11 - CWFsSupporting Document · PDF10 Jun 2021View
Fig 6.12 - CZTV - Spurness PointSupporting Document · PDF10 Jun 2021View
Fig 6.13 - CZTV Westray Dev TrustSupporting Document · PDF10 Jun 2021View
Fig 6.14 - CZTV Stronsay Dev TrustSupporting Document · PDF10 Jun 2021View
Fig 6.15 - CZTV HammarsHillSupporting Document · PDF10 Jun 2021View
Fig 6.16 - CZTV Burgar HillSupporting Document · PDF10 Jun 2021View
Fig 6.17 - CZTV Costa HeadSupporting Document · PDF10 Jun 2021View
Fig 6.18 - CZTV_QuanternessSupporting Document · PDF10 Jun 2021View
Fig 6.19a-f - Viewpoint 1 - Guith, EdaySupporting Document · PDF10 Jun 2021View
Fig 6.20a-g - Vinaquoy Hill, EdaySupporting Document · PDF10 Jun 2021View
Fig 6.21a-f - Sands of Mussetter. EdaySupporting Document · PDF10 Jun 2021View
Fig 6.22a-f - Viewpoint 4 Westray Ferry TerminalSupporting Document · PDF10 Jun 2021View
Fig 6.23a-f - Viewpoint 5 Ness of Tuquoy, WestraySupporting Document · PDF10 Jun 2021View
Fig 6.24a-g - Viewpoint 6 Spur Ness, SandaySupporting Document · PDF10 Jun 2021View
Fig 6.25a-e - Viewpoint 7 Burness, SandaySupporting Document · PDF10 Jun 2021View
Fig 6.26a-e - Viewpoint 8 John's Hill, StronsaySupporting Document · PDF10 Jun 2021View
Fig 6.27a-g - Viewpoint 9 Kierfea, RousaySupporting Document · PDF10 Jun 2021View
Fig 6.28a-f - Viewpoint 10, Hatston, KirkwallSupporting Document · PDF10 Jun 2021View
Fig 6.29a-f - Viewpoint 11 Westray FerrySupporting Document · PDF10 Jun 2021View
Front Cover & ContentsSupporting Document · PDF10 Jun 2021View
Front Cover & ContentsSupporting Document · PDF10 Jun 2021View
Appendix 4.1 - EIA Scoping ReportSupporting Document · PDF10 Jun 2021View
Appendix 4.1 - EIA Scoping OpinionSupporting Document · PDF10 Jun 2021View
Appendix 4.1 - 4.3 - Cross-reference of EIA Scoping Opinion in the EIA ReportSupporting Document · PDF10 Jun 2021View
Appendix 4.4 - Additional ConsultationSupporting Document · PDF10 Jun 2021View
Appendix 4..5 - Major Accidents and DisastersSupporting Document · PDF10 Jun 2021View
Appendix 4.6 - Proposal of Application Notice (PAN).Supporting Document · PDF10 Jun 2021View
Appendix 4.7 - Marine Licence Letter to ConsulteesSupporting Document · PDF10 Jun 2021View
Appendix 6.1 - Methodology for LVIASupporting Document · PDF10 Jun 2021View
Appendix 6.2 - RVAA Volume 1Supporting Document · PDF10 Jun 2021View
Appendix 7.1 - Avian Baseline ConditionsSupporting Document · PDF10 Jun 2021View
Appendix 7.2 - Collision Risk ReportSupporting Document · PDF10 Jun 2021View
Appendix 8.1 - Extended Habitat and NVC ReportSupporting Document · PDF10 Jun 2021View
Appendix 8.2 - Otter Survey ReportSupporting Document · PDF10 Jun 2021View
Appendix 8.3 - Seal Survey ReportSupporting Document · PDF10 Jun 2021View
Appendix 8.4 - Storm Petrel and Bat Activity SurveySupporting Document · PDF10 Jun 2021View
Appendix 8.5 - Shadow Habitats Regulations AppraisalSupporting Document · PDF10 Jun 2021View
Appendix 9.1 - Consultation with EHOSupporting Document · PDF10 Jun 2021View
Appendix 9.2 - Cross-reference of EIA Scoping Opinion in the EIA ReportSupporting Document · PDF10 Jun 2021View
Appendix 9.3 - Record of Baseline Noise SurveySupporting Document · PDF10 Jun 2021View
Appendix 9.4 - Charts showing measured baseline data and derivation of noise limSupporting Document · PDF10 Jun 2021View
Appendix 9.4 -5 - Cumulative TurbinesSupporting Document · PDF10 Jun 2021View
Appendix 9.6 - Derivation of Residual Noise LimitsSupporting Document · PDF10 Jun 2021View
Appendix 10.1 - Site GazetteerSupporting Document · PDF10 Jun 2021View
Appendix 10.2 - Detailed Setting AssessmentSupporting Document · PDF10 Jun 2021View
Appendix 10.3 - PlatesSupporting Document · PDF10 Jun 2021View
Appendix 12.1 - Transport AssessmentSupporting Document · PDF10 Jun 2021View
Appendix 13.1 - Orkney Transmission Link ReportSupporting Document · PDF10 Jun 2021View
Appendix 15.1 - Met DataSupporting Document · PDF10 Jun 2021View
Appendix 15.2 - Potential Shadow PeriodsSupporting Document · PDF10 Jun 2021View
Appendix 16.1 - Underwater Noise Modelling FiguresSupporting Document · PDF10 Jun 2021View
Appendix 16.2 - Behavioual Disturbance CalculationsSupporting Document · PDF10 Jun 2021View
Appendix 17.1 - Marine water and sediment quality inception reportSupporting Document · PDF10 Jun 2021View
Appendix 17.2 - Dredging Desk StudySupporting Document · PDF10 Jun 2021View
Appendix 17.3 - Sediment Sample PlanSupporting Document · PDF10 Jun 2021View
Appendix 17.4 - Sediment Sample Analytical ReportSupporting Document · PDF10 Jun 2021View
Appendix 18.1 - Seabed Survey ImagesSupporting Document · PDF10 Jun 2021View
Appendix 6.2 Fig 6.30 Crowber WirelineSupporting Document · PDF10 Jun 2021View
Appendix 6.2 Fig 6.31 Lesshamar WirelineSupporting Document · PDF10 Jun 2021View
Appendix 6.2 Fig 6.32 North Guith WirelineSupporting Document · PDF10 Jun 2021View
Appendix 6.2 Fig 6.33 Mid Guith WirelineSupporting Document · PDF10 Jun 2021View
Appendix 6.2 Fig 6.34 Benstonhall WirelineSupporting Document · PDF10 Jun 2021View
FIg 10.12a-k - Viewpoint CH1 - Chambered Carin NW of QuoySupporting Document · PDF10 Jun 2021View
Figures 10.13a-s - CH2 DoggerboatSupporting Document · PDF10 Jun 2021View
Figures 10.14a-e CH3 Muckle Hill of Linktaing, Chambered Cairn, Homestead and FiSupporting Document · PDF10 Jun 2021View
Figures 10.15a-e CH4 Sangar Crofthouse, WestraySupporting Document · PDF10 Jun 2021View
Figures 10.16a-b CH5 Stone of Setter, Standing StoneSupporting Document · PDF10 Jun 2021View
Figures 10.17a-b CH6 Mill Hill, Chambered Cairn, MillboundsSupporting Document · PDF10 Jun 2021View
Figures 10.18a-b CH7 Vinquoy Hill, Chambered Cairn, EdaySupporting Document · PDF10 Jun 2021View
Figures 10.19a-b CH8 Cross-Kirk (Westside Church),Supporting Document · PDF10 Jun 2021View
Figures 10.20a-b CH9 Holm of Papa Westray Shouth Chambered CairnSupporting Document · PDF10 Jun 2021View
Figures 10.21a-b CH10 Knowes of Maebeck, Burnt MoundSupporting Document · PDF10 Jun 2021View
Figures 10.22a-b CH11 Green Hill, Broch Wsw of HuipSupporting Document · PDF10 Jun 2021View
Figures 10.23a-b CH12 St Magnus Church, EgilsaySupporting Document · PDF10 Jun 2021View
Figures 10.24a-b CH13 St Magnus Church Egilsay (View from North ronaldsay ferrySupporting Document · PDF10 Jun 2021View
Figures 10.25a-b CH14 St Magnus Church, Egilsay (view from Papa Westray Ferry roSupporting Document · PDF10 Jun 2021View
Pre-Application Consultation ReportSupporting Document · PDF10 Jun 2021View
Turbine Planning Permission MAJApplication Form · PDF3 Jun 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

External Decision - Scottish Government
External Decision Reference of Application to Scottish Ministers
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.