Council planning record

Internal and external alterations to create a new theatre auditorium (sui generis) and ancillary uses including offices, community/ education space and a cafe-bar. The development includes the conversion and refurbishment of the former post office and Friends' meeting house, demolition of former museum building and construction of a central infill building.

Former Post Office, Old Museum And Former Friends Meeting House 84 Union Street Oldham OL1 1DL

UnknownReference: LBC/351546/23Oldham Metropolitan Borough Council

Last published check: 29 Sept 2026, 22:55. Check the council record for more recent changes.

Application location

Former Post Office, Old Museum And Former Friends Meeting House 84 Union Street Oldham OL1 1DL

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Listed Building Consent
Received
21 Aug 2023
Validated
21 Aug 2023
Determination deadline
16 Oct 2023
Local authority
Oldham Metropolitan Borough Council

Application overview

Internal and external alterations to create a new theatre auditorium (sui generis) and ancillary uses including offices, community/ education space and a cafe-bar. The development includes the conversion and refurbishment of the former post office and Friends' meeting house, demolition of former museum building and construction of a central infill building.

Proposal details

Reference
LBC/351546/23
Alternative references
PP-12287247
Ward
Coldhurst
Agent
Paul Butler Associates

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 127 of 127

DocumentPublishedAction
DECISION NOTICE WDN LB CONSENTDecision · PDF5 Aug 2024View
000 EXISTING SITE TOPO - P2.Amended Plans · PDF6 Dec 2023View
102 PHASE A AND B TS - P2.Amended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-00-DR-A-0011-EXISTING LOWER GROUND FLOOR PLAN- ALTERATIONS.Amended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-00-DR-A-0200-LOWER GROUND FLOOR PLANAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-02-DR-A-0013-EXISTING FIRST FLOOR PLAN- ALTERATIONS.PDFAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-02-DR-A-0202-FIRST FLOOR PLAN.PDFAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-03-DR-A-0203-SECOND FLOOR PLANAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-04-DR-A-0014-EXISTING ROOF PLAN- ALTERATIONS.PDFAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-ZZ-DR-A-0701-SECTION BB.PDFAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-ZZ-DR-A-0702-SECTION CC.PDFAmended Plans · PDF6 Dec 2023View
OPS-FCBS-XX-ZZ-DR-A-0703-SECTION DDAmended Plans · PDF6 Dec 2023View
OPS HERITAGE ADDENDUMHeritage statement · PDF6 Dec 2023View
CONSULTEE RESPONSE LETTER (06.12.2023Amended Plans · PDF6 Dec 2023View
ACCESSIBLE RAMP ACCESSPlans · PDF29 Nov 2023View
UNION STREET ENTRANCEPlans · PDF16 Nov 2023View
COACH PARKINGPlans · PDF9 Nov 2023View
COACH PARKING FEASIBILITY STUDYBackGround Papers · PDF8 Nov 2023View
ASHWORTH ST ELEVATION PROPOSEDPlans · PDF27 Oct 2023View
SECTION EE PROPOSEDPlans · PDF27 Oct 2023View
SITE NOTICEPhoto · PDF12 Sept 2023View
EXISTING FIRST FLOOR PLAN - ALTERATIONSPlans · PDF25 Aug 2023View
PROPOSED FIRST FLOOR PLANPlans · PDF25 Aug 2023View
EXISTING FIRST FLOOR PLANPlans · PDF25 Aug 2023View
PROPOSED SECOND FLOOR PLANPlans · PDF25 Aug 2023View
EXISTING ROOF PLAN - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING ROOF PLAN - ALTERATIONSPlans · PDF25 Aug 2023View
PROPOSED ROOF LEVEL FLOOR PLANPlans · PDF25 Aug 2023View
EXISTING ROOF PLANPlans · PDF25 Aug 2023View
PROPOSED ROOF PLANPlans · PDF25 Aug 2023View
EXISTING SECTION BB - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING SECTION DD - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING SECTION FF- ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING SECTION GG - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING UNION STREET ELEVATIONPlans · PDF25 Aug 2023View
EXISTING GARDEN ELEVATION - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING ASHWORTH STREET ELEVATION - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING GREAVES STREET ELEVATION - ALTERATIONSPlans · PDF25 Aug 2023View
EXISTING ROOF PLAN - DEMOLITIONPlans · PDF25 Aug 2023View
EXTERNAL FABRIC SECTIONPlans · PDF25 Aug 2023View
FORMER POST OFFICE EXISTING EXTERNAL DOORPlans · PDF25 Aug 2023View
FORMER POST OFFICE EXTERNAL STAIRPlans · PDF25 Aug 2023View
FORMER POST OFFICE NEW CIRCULATION PROPOSALSPlans · PDF25 Aug 2023View
PROPOSED UNION STREET ELEVATION ALTERATIONSPlans · PDF25 Aug 2023View
PROPOSED GARDEN ELEVATION ALTERATIONSPlans · PDF25 Aug 2023View
PROPOSED SECTION AAPlans · PDF25 Aug 2023View
PROPOSED SECTION BBPlans · PDF25 Aug 2023View
PROPOSED SECTION CCPlans · PDF25 Aug 2023View
PROPOSED SECTION DDPlans · PDF25 Aug 2023View
PROPOSED SECTION EEPlans · PDF25 Aug 2023View
PROPOSED SECTION FFPlans · PDF25 Aug 2023View
PROPOSED SECTION GGPlans · PDF25 Aug 2023View
PROPOSED SECTION HHPlans · PDF25 Aug 2023View
PROPOSED UNION STREET ELEVATIONPlans · PDF25 Aug 2023View
PROPOSED GARDEN ELEVATIONPlans · PDF25 Aug 2023View
PROPOSED ASHWORTH STREET ELEVATIONPlans · PDF25 Aug 2023View
EXISTING SECTION AAPlans · PDF25 Aug 2023View
EXISTING SECTION BBPlans · PDF25 Aug 2023View
EXISTING SECTION CCPlans · PDF25 Aug 2023View
EXISTING SECTION DDPlans · PDF25 Aug 2023View
EXISTING SECTION EEPlans · PDF25 Aug 2023View
EXISTING SECTION FFPlans · PDF25 Aug 2023View
EXISTING SECTION GGPlans · PDF25 Aug 2023View
EXISTING SECTION HHPlans · PDF25 Aug 2023View
EXISTING UNION STREET ELEVATIONPlans · PDF25 Aug 2023View
EXISTING GARDEN ELEVATIONPlans · PDF25 Aug 2023View
EXISTING ASHWORTH STREET ELEVATIONPlans · PDF25 Aug 2023View
EXISTING GREAVES STREET ELEVATIONPlans · PDF25 Aug 2023View
MAIN PLANT SCHEDULEAdditional Information · PDF25 Aug 2023View
MULTIPLE COMBINED SERVICES LEVEL 00Plans · PDF25 Aug 2023View
MULTIPLE COMBINED SERVICES LEVEL 01Plans · PDF25 Aug 2023View
MULTIPLE COMBINED SERVICES LEVEL 02Plans · PDF25 Aug 2023View
MULTIPLE COMBINED SERVICES LEVEL 03Plans · PDF25 Aug 2023View
MULTIPLE COMBINED SERVICES LEVEL 04Plans · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
FLOOD RISK ASSESSMENTReport · PDF25 Aug 2023View
OUTLINE DRAINAGE STRATEGYReport · PDF25 Aug 2023View
STRUCTURAL SURVEYReport · PDF25 Aug 2023View
PHASE 1 GEO-ENVIRONMENTAL REPORTReport · PDF25 Aug 2023View
REDACTEDApplication Form · PDF24 Aug 2023View
COVERING LETTERCorrespondence · PDF24 Aug 2023View
DRAWING ISSUE SHEETCase Documents · PDF24 Aug 2023View
CRIME IMPACT STATEMENTReport · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Design and Access StatementDesign and Access Statement · PDF24 Aug 2023View
Transport assessmentTransport assessment · PDF24 Aug 2023View
Transport assessmentTransport assessment · PDF24 Aug 2023View
ECOLOGICAL APPRAISAL AND BAT SURVEYReport · PDF24 Aug 2023View
BNG STATEMENTReport · PDF24 Aug 2023View
BNG STATEMENTReport · PDF24 Aug 2023View
DAYTIME BAT SURVEYReport · PDF24 Aug 2023View
ENERGY AND SUSTAINABILITY STATEMENTReport · PDF24 Aug 2023View
EXTERNAL LIGHTING STATEMENTReport · PDF24 Aug 2023View
UPDATED ECOLOGICAL STATEMENTReport · PDF24 Aug 2023View
NOISE IMPACT ASSESSMENTReport · PDF24 Aug 2023View
UTILITIES STATEMENTReport · PDF24 Aug 2023View
TREE SURVEY REPORTReport · PDF24 Aug 2023View
Statement of community involvementStatement of community involvement · PDF24 Aug 2023View
PLANNING & REGENERATION STATEMENTPlanning statement · PDF24 Aug 2023View
Heritage statementHeritage statement · PDF24 Aug 2023View
KITCHEN VENTILATION STRATEGYReport · PDF24 Aug 2023View
EXISTING LOWER GROUND FLOOR PLAN WITH PROPOSED ALTERATIONSPlans · PDF24 Aug 2023View
PROPOSED LOWER GROUND FLOOR PLANPlans · PDF24 Aug 2023View
EXISTING LOWER GROUND FLOOR PLANPlans · PDF24 Aug 2023View
EXISTING GROUND FLOOR PLAN - ALTERATIONSPlans · PDF24 Aug 2023View
PROPOSED GROUND FLOOR PLANPlans · PDF24 Aug 2023View
The location planThe location plan · PDF24 Aug 2023View
EXISTING SITE PLANPlans · PDF24 Aug 2023View
PROPOSED SITE PLANPlans · PDF24 Aug 2023View
EXISTING GROUND FLOOR PLANPlans · PDF24 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Date

    Published milestoneCouncil source
  9. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Withdrawn
DECISION NOTICE WDN LB CONSENT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.