Council planning record

Discharge of Part A conditions 5 (Contamination), 6 (Landfill), 7 (CEMP). 8 (Drainage), 9 (Energy), 11 (Electric Vehicle), 12 (Acoustic Fence), 13 (External Lighting), 14 (Travel Plan), 16 (Pedestrian Routes) and 17 (Cycles) relating to app no. OUT/349440/22

Land At Broadway Green Business Park Foxdenton Lane Chadderton

DecidedReference: CND/350684/23Oldham Metropolitan Borough Council

Last published check: 1 Oct 2026, 21:29. Check the council record for more recent changes.

Application location

Land At Broadway Green Business Park Foxdenton Lane Chadderton

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge Condition
Received
17 Mar 2023
Validated
17 Mar 2023
Determination deadline
12 May 2023
Local authority
Oldham Metropolitan Borough Council

Application overview

Discharge of Part A conditions 5 (Contamination), 6 (Landfill), 7 (CEMP). 8 (Drainage), 9 (Energy), 11 (Electric Vehicle), 12 (Acoustic Fence), 13 (External Lighting), 14 (Travel Plan), 16 (Pedestrian Routes) and 17 (Cycles) relating to app no. OUT/349440/22

Proposal details

Reference
CND/350684/23
Alternative references
PP-12005854
Ward
Chadderton South
Agent
The Harris Partnership

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 62 of 62

DocumentPublishedAction
SOIL REPORTLand contamination assessment · PDF4 Jun 2024View
SOIL SAMPLE ANALYSIS REPORTLand contamination assessment · PDF5 Jan 2024View
SOIL SAMPLE SPECIFICATIONLand contamination assessment · PDF5 Jan 2024View
PARTIAL DISCHARGE LETTERDecision4 Jan 2024View
TRAVEL PLANTravel plan · PDF2 Jan 2024View
PROPOSED CYCLE STORE LOCATIONSAmended Plans · PDF24 Oct 2023View
VERTICAL CYCLE RACK INFORMATION SHEETAdditional Information · PDF24 Oct 2023View
VERTICAL CYCLE RACKAdditional Information · PDF24 Oct 2023View
SHEFFIELD CYCLE SHELTER SPECIFICATION SHEETAdditional Information · PDF24 Oct 2023View
BROXAP CYCLE SHELTERAdditional Information · PDF24 Oct 2023View
PROPOSED EXTERNAL LIGHTING LUX PLOTAdditional plans · PDF17 Oct 2023View
ASBESTOS MANAGEMENT PLANAdditional Information · PDF25 Aug 2023View
LANDSCAPE PLAN (INC. TOPSOIL SPECIFICATION)Landscaping details · PDF25 Aug 2023View
PV LAYOUTAdditional Information · PDF25 Aug 2023View
PV SCHEMATICAdditional Information · PDF25 Aug 2023View
PV DETAILPlans · PDF25 Aug 2023View
PV DETAILAdditional Information · PDF25 Aug 2023View
HEAT PUMP TECHNICAL INFORMATIONAdditional Information · PDF25 Aug 2023View
HEAT PUMP INSTALLATIONAmended Information · PDF25 Aug 2023View
AIR TO WATER HEAT PUMP SPEC.Additional Information · PDF25 Aug 2023View
HEATING SCHEMATIC LOW ENERGY STOREAdditional Information · PDF25 Aug 2023View
SITE INVESTIGATIONLand contamination assessment · PDF1 Aug 2023View
DecisionDecision11 Jul 2023View
PROPOSED PEDESTRIAN ROUTESAmended Plans · PDF9 Jun 2023View
FLOOD RISK ASSESSMENT & SURFACE WATER DRAINAGE STRATEGYFlood risk assessment · PDF22 May 2023View
APPLICATIONFORMREDACTEDApplication Form · PDF16 Mar 2023View
PHASE 1 GEO-ENVIRONMENTAL DESK STUDYLand contamination assessment · PDF16 Mar 2023View
PHASE 1 GEO-ENVIRONMENTAL DESK STUDYLand contamination assessment · PDF16 Mar 2023View
PHASE 1 GEO-ENVIRONMENTAL DESK STUDYLand contamination assessment · PDF16 Mar 2023View
PHASE 1 GEO-ENVIRONMENTAL DESK STUDYLand contamination assessment · PDF16 Mar 2023View
GEO-ENVIRONMENTAL INVESTIGATIONLand contamination assessment · PDF16 Mar 2023View
CONSTRUCTION AND ENVIRONMENTAL MANAGEMENT PLANReport · PDF16 Mar 2023View
EXISTING DRAINAGE LAYOUTAdditional plans · PDF16 Mar 2023View
PROPOSED DRAINAGE LAYOUTAdditional plans · PDF16 Mar 2023View
TYPICAL MANHOLE DETAILSAdditional plans · PDF16 Mar 2023View
TYPICAL DRAINAGE DETAILSAdditional plans · PDF16 Mar 2023View
ATTENUATION TANK AND OIL SEPARATOR DETAILSAdditional plans · PDF16 Mar 2023View
MANHOLE SCHEDULEAdditional plans · PDF16 Mar 2023View
DRAINAGE MAINTENANCEAdditional plans · PDF16 Mar 2023View
SURFACE WATER CALCULATIONSAdditional Information · PDF16 Mar 2023View
ENERGY STATEMENT REPORTReport · PDF16 Mar 2023View
PROPOSED EVC BAYSAdditional plans · PDF16 Mar 2023View
EVCP OM BEST PRACTICE MANUALAdditional Information · PDF16 Mar 2023View
DYNAMIC POWER SHARINGAmended Information · PDF16 Mar 2023View
NM POLE (WEIGHTS AND DIMENSIONS)Additional Information · PDF16 Mar 2023View
ELECTRIC VEHICLE CHARGE SIGNPhoto16 Mar 2023View
ELECTRIC VEHICLE CHARGE SIGNPhoto16 Mar 2023View
PROPOSED EXTERNAL LIGHTING LAYOUT - REV T1Additional plans · PDF16 Mar 2023View
PROPOSED ACOUSTIC FENCE SITE PLANAdditional plans · PDF16 Mar 2023View
ACOUSTIC FENCE DETAILSAdditional plans · PDF16 Mar 2023View
CLOSE BOARDED ACOUSTIC TIMBER FENCE - PHOTO 1Photo16 Mar 2023View
CLOSE BOARDED ACOUSTIC TIMBER FENCE - PHOTO 2Photo16 Mar 2023View
JAKOUSTIC FENCING SYSTEM 3000MMAdditional Information · PDF16 Mar 2023View
JAKOUSTIC REFLECTIVE SPEC SHEETAdditional Information · PDF16 Mar 2023View
LIGHTING DETAILSAdditional Information · PDF16 Mar 2023View
LIGHTING DETAILSAdditional Information · PDF16 Mar 2023View
PROPOSED LUX PLOTAdditional plans · PDF16 Mar 2023View
TECH_CONICAL_STEELAdditional Information · PDF16 Mar 2023View
230308_563_TP01_CONDITION 14_ISSUETravel plan · PDF16 Mar 2023View
PROPOSED PEDESTRIAN ROUTESAdditional plans · PDF16 Mar 2023View
PROPOSED CYCLE STOREAdditional plans · PDF16 Mar 2023View
VELOPA-SHEFFIELD-CYCLE-STAND-STAINLESSAdditional Information · PDF16 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Condition Part Discharged
PARTIAL DISCHARGE LETTER Decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.