Council planning record

Conversion of and single storey rooftop extension to the Grade II listed former Police and Fire Stations building for student accommodation and erection of a new 18 storey building for purpose-built student accommodation, including ancillary residents hub and associated facilities and a new ground floor public food hall (Use Class E(b)), landscaping, access, cycle parking, and drainage, and all other associated works; alongside associated demolition of the existing Central Block, single storey lean-tos adjoining the Former Police and Fire Station (1930s building), part of the rear wing of Fire Station House (1880s building), and partial demolition of the rear east wing to the Guildhall.

Former Police Station And Fire Brigade Stores South Sherwood Street Nottingham

DecidedReference: 25/01610/LLIS1Nottingham City Council

Last published check: 11 Oct 2026, 20:21. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Listed Building Consent
Received
28 Aug 2025
Validated
28 Aug 2025
Determination deadline
23 Oct 2025
Local authority
Nottingham City Council

Application overview

Conversion of and single storey rooftop extension to the Grade II listed former Police and Fire Stations building for student accommodation and erection of a new 18 storey building for purpose-built student accommodation, including ancillary residents hub and associated facilities and a new ground floor public food hall (Use Class E(b)), landscaping, access, cycle parking, and drainage, and all other associated works; alongside associated demolition of the existing Central Block, single storey lean-tos adjoining the Former Police and Fire Station (1930s building), part of the rear wing of Fire Station House (1880s building), and partial demolition of the rear east wing to the Guildhall.

Proposal details

Reference
25/01610/LLIS1
Alternative references
PP-14221444
Ward
St Anns (May 2019)
Agent
Turley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Former Police Station And Fire Brigade Stores South Sherwood Street Nottingham

This record has no verified map location.

View council map

Documents 133 of 133

DocumentPublishedAction
LLIS1 Grant LBC - DecisionDecision Notice · PDF30 Jan 2026View
CONSERVATION OFFICER COMMENTSRedacted Consultee Comment · PDF11 Nov 2025View
THE LOCATION PLANSite Location Plan · PDF28 Aug 2025View
SUSTAINABLE DRAINAGE DOCUMENTReports · PDF28 Aug 2025View
ILLUSTRATIVE SECTION 04Layout Plans & Elevations · PDF28 Aug 2025View
ILLUSTRATIVE SECTION 03Layout Plans & Elevations · PDF28 Aug 2025View
LANDSCAPE GENERAL ARRANGEMENTLayout Plans & Elevations · PDF28 Aug 2025View
ARCHAEOLOGICAL DESK-BASED ASSESSMENT & CAVE ASSESSMENTReports · PDF28 Aug 2025View
PLANT SCHEDULEReports · PDF28 Aug 2025View
LANDSCAPE DESIGN AND ACCESS STATEMENT 2Reports · PDF28 Aug 2025View
LANDSCAPE DESIGN AND ACCESS STATEMENT 1Reports · PDF28 Aug 2025View
LIGHTING AND FURNITUREReports · PDF28 Aug 2025View
ILLUSTRATIVE SECTION 02Layout Plans & Elevations · PDF28 Aug 2025View
ILLUSTRATIVE SECTION 01Layout Plans & Elevations · PDF28 Aug 2025View
LEVELS AND DRAINAGELayout Plans & Elevations · PDF28 Aug 2025View
SOFTWORKSLayout Plans & Elevations · PDF28 Aug 2025View
HARDWORKSLayout Plans & Elevations · PDF28 Aug 2025View
SITE WASTE MANAGEMENT STRATEGYReports · PDF28 Aug 2025View
PROPOSED LEVEL B1Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 18Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 17Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 04Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 03Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 02Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 01Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED LEVEL 00Layout Plans & Elevations · PDF28 Aug 2025View
AIR QUALITY ASSESSMENTReports · PDF28 Aug 2025View
WIND MICROCLIMATE ASSESSMENT REPORTReports · PDF28 Aug 2025View
DAYLIGHT AND SUNLIGHT APPENDICESReports · PDF28 Aug 2025View
SURROUNDING IMPACTS REPORTReports · PDF28 Aug 2025View
ADO NOISE RISK ASSESSMENTReports · PDF28 Aug 2025View
EXTERNAL BUILDING FABRIC REPORTReports · PDF28 Aug 2025View
BNG REPORTReports · PDF28 Aug 2025View
PROPOSED GUILDHALL ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
DEMO GUILDHALL ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
DEMO GUILDHALL LEVELS 02-03Layout Plans & Elevations · PDF28 Aug 2025View
DEMO GUILDHALL LEVELS 00-01Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING GUILDHALL ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
DEMO GUILDHALL LEVEL B1Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING GUILDHALL LEVEL B1Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING GUILDHALL LEVELS 02-03Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING GUILDHALL LEVELS 00-01Layout Plans & Elevations · PDF28 Aug 2025View
DEMO 1880S ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
DEMO 1880S FLOORPLANLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING 1880S ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING 1880S FLOORPLANLayout Plans & Elevations · PDF28 Aug 2025View
SCHEDULE OF ACCOMMODATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 06Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 05Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 04Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 03Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 02Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER TYPICAL BAY 01Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER WEST ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER SOUTH ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER EAST ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TOWER NORTH ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED SECTION B-BLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED SECTION A-ALayout Plans & Elevations · PDF28 Aug 2025View
EXISTING CENTRAL BLOCK ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
SCHEDULE OF ACCOMMODATIONReports · PDF28 Aug 2025View
PROPOSED TYPICAL BAY 02Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED TYPICAL BAY 01Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED EAST COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED S-W COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED S-W ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED N-E ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
DEMO EAST COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
DEMO S-W COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
DEMO S-W ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
DEMO N-E ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING EAST COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING S-W COURTYARD ELEVLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING S-W ELEVATIONSLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING N-E ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL B1Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL B1Layout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL 04Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL 04Layout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL 03Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL 03Layout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL 02Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL 02Layout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL 01Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL 01Layout Plans & Elevations · PDF28 Aug 2025View
DEMO LEVEL 00Layout Plans & Elevations · PDF28 Aug 2025View
EXISTING LEVEL 00Layout Plans & Elevations · PDF28 Aug 2025View
PROPOSED CONTEXT SOUTH ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED CONTEXT WEST ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED CONTEXT EAST ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED CONTEXT NORTH ELEVATIONLayout Plans & Elevations · PDF28 Aug 2025View
PROPOSED SITE PLANLayout Plans & Elevations · PDF28 Aug 2025View
DEMO SITE PLANLayout Plans & Elevations · PDF28 Aug 2025View
EXISTING SITE PLANLayout Plans & Elevations · PDF28 Aug 2025View
ENERGY STRATEGY REPORTReports · PDF28 Aug 2025View
DESIGN AND ACCESS STATEMENTReports · PDF28 Aug 2025View
DESIGN AND ACCESS STATEMENT 2Reports · PDF28 Aug 2025View
DESIGN AND ACCESS STATEMENT 3Reports · PDF28 Aug 2025View
DESIGN AND ACCESS STATEMENT 4Reports · PDF28 Aug 2025View
STUDENT NEED ASSESSMENTReports · PDF28 Aug 2025View
PRELIMINARY ECOLOGICAL APPRAISALReports · PDF28 Aug 2025View
TOWNSCAPE AND VISUAL IMPACT APPRAISALReports · PDF28 Aug 2025View
TVIA APPENDIX 5Reports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 6 OF 6Reports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 5 OF 6Reports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 4 OF 6Reports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 2 OF 6Reports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 1 OF 6Reports · PDF28 Aug 2025View
TVIA APPENDIX 3 PART 2 OF 2Reports · PDF28 Aug 2025View
TVIA APPENDIX 3 PART 1 OF 2Reports · PDF28 Aug 2025View
TVIA APPENDIX 1AND2Reports · PDF28 Aug 2025View
HERITAGE STATEMENT - PART3OF3Reports · PDF28 Aug 2025View
HERITAGE STATEMENT - PART2OF3Reports · PDF28 Aug 2025View
HERITAGE STATEMENT - PART1OF3Reports · PDF28 Aug 2025View
SUSTAINABILITY & ENERGY STATEMENTReports · PDF28 Aug 2025View
PLANNING STATEMENTReports · PDF28 Aug 2025View
PRELIMINARY ECOLOGICAL APPRAISAL ADDENDUMReports · PDF28 Aug 2025View
PRELIMINARY UXO RISK ASSESSMENTReports · PDF28 Aug 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT PT2Reports · PDF28 Aug 2025View
FLOOD RISK MANAGEMENT REPORTReports · PDF28 Aug 2025View
STRUCTURAL DESIGN PHILOSOPHYReports · PDF28 Aug 2025View
CAVE STABILITY ASSESSMENTReports · PDF28 Aug 2025View
TRAVEL PLANReports · PDF28 Aug 2025View
TRAVEL ASSESSMENT PT4Reports · PDF28 Aug 2025View
TRAVEL ASSESSMENT PT3Reports · PDF28 Aug 2025View
TRAVEL ASSESSMENT PT2Reports · PDF28 Aug 2025View
TRAVEL ASSESSMENT PT1Reports · PDF28 Aug 2025View
STATEMENT OF COMMUNITY ENGAGEMENTReports · PDF28 Aug 2025View
TVIA APPENDIX 4 PART 3 OF 6.Reports · PDF28 Aug 2025View
PHASE 2 GEO-ENVIRONMENTAL ASSESSMENTReports · PDF28 Aug 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENTReports · PDF28 Aug 2025View
FIRE STATEMENTReports · PDF28 Aug 2025View
BNG METRIC REPORTReports28 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant conditional consent
LLIS1 Grant LBC - Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.